In September 1847, the first services departed the station, even though construction was not completed until the following year. It was built in a neo-Tudor style to the designs of English architect William Tite.[2] Carlisle station was one of a number in the city; the others were Crown Street and London Road, but it became the dominant station by 1851. The other stations had their passenger services redirected to it and were closed. Between 1875 and 1876, the station was expanded to accommodate the lines of the Midland Railway which was the seventh railway company to use it.
The Beeching cuts of the 1960s affected Carlisle, particularly the closure of the former North British Railway lines to Silloth, on 7 September 1964, and the Waverley Line to Edinburgh via Galashiels on 6 January 1969. The closure programme claimed neighbouring lines, including the Castle Douglas and Dumfries Railway and Portpatrick Railway (the "Port Road") in 1965; this resulted in a significant mileage increase via the Glasgow South Western Line and Ayr to reach Stranraer Harbour and ferries to Northern Ireland. The station layout has undergone few changes other than the singling of the ex-NER Tyne Valley route to London Road Junction in the 1972–73 re-signalling scheme, which was associated with the electrification of the West Coast Main Line (WCML). Renovations to the platforms and glass roof were performed between 2015 and 2018.
Carlisle station was designed by the architect William Tite. His design incorporated Tudor and Gothic styles. Built at a cost of £53,000, the station was constructed between 1846 and 1848. On 10 September 1847, it was officially opened to rail traffic, even though construction was incomplete and only one long through platform with a bay at each end had been finished.[3]
The main station buildings have a multi-bay sandstone facade of two storeys, capped by rows of slate roofs at differing levels. The entrance portico is supported by five pointed arches with buttresses between. Roundels are placed over three arches; the central roundel bears the royal arms of Queen Victoria, flanked by those of the Lancaster & Carlisle and the Caledonian Railways but the outer plaques, intended for the Maryport & Carlisle and the Newcastle and Carlisle who did not contribute towards the cost of the station's construction, are blank.[3]
An Act for the Enlargement, Regulation, and Management of "The Citadel Station" at Carlisle, situate at the Junction of the Lancaster and Carlisle and the Caledonian Railways, and for other Purposes.
As a consequence of the station accommodating the complex timetables operated by two, and eventually seven operating companies, a joint management committee was established.[3] On 10 May 1857, the Carlisle Citadel Station Agreement was drawn up and established under the Carlisle Citadel Station Act 1861 (24 & 25 Vict. c. clxvi) of 22 July 1861. The committee had eight directors, four each from the boards of the Caledonian and the London and North Western Railway (L&NWR) which had absorbed the Lancaster & Carlisle in 1859.[3]
An Act for enlarging the extent and improving the accommodation of the Citadel Station at Carlisle, and making and maintaining new Connecting Lines between the various Railways converging there; and for other purposes.
To improve freight services the Carlisle Goods Traffic Committee was formed after the Carlisle Citadel Station Act 1873 (36 & 37 Vict. c. clxxxvii).[3] The London & North Western, Midland, Caledonian and Glasgow & South Western each had two directors on the committee. To minimise the danger to passengers, a goods avoidance line was constructed to divert freight trains around the station.[3]
Expansion and later service
The Carlisle Citadel Station Act 1873 (36 & 37 Vict. c. clxxxvii) authorised changes, not restricted to freight, including an instruction "enlarging and improving facilities". Expansion work took place between 1873 and 1876 followed by a second phase between 1878 and 1881. While construction was taking place, the opening of the Midland Railway's Settle–Carlisle line generated more freight trains from August 1875, and passenger services, started in April 1876.[3]
On 20 July 1881 improvements were officially completed. Carlisle station was used by seven railway companies, the London and North Western, North Eastern, Midland, Caledonian, North British, Glasgow & South Western and Maryport & Carlisle. Each companies operated its own passenger amenities with separate booking and parcels offices.[3][4]
Additional tracks, buildings and platforms were constructed including an island platform with two-storey buildings which increased the 400 metre-long through platforms to three.[3] Five terminal bay platforms were constructed and an overarching footbridge which connected the through platforms inside the train shed. Below the platforms, the undercroft contains a network of passageways, offices, service rooms and staff accommodation; parts of the underground areas are reputed to be haunted.[3]
During the construction programme an iron and glass large roof was installed behind the station buildings.[3] As built, it spanned 85 metres across the platforms and tracks to cover an area in excess of 2.6 hectares. It consisted of 26 deep lattice girders, with a transverse span and 12.2 metre centres; each girder had 10 panels, stiffened end posts and a flat bottom tie.[3] The girders supported a series of slender balanced cantilever half-truss hooped beams at approximately 3.7m centres, spanning the tracks. The ornate timber end screens had Gothic-style glazing bars. The roof was glazed using shingled panels, possibly making use of Rendel's patented Indestructible System, and was designed by Edinburgh-based engineering firm Blyth & Cunningham.[3][4]
Preventative maintenance gradually led to large areas of the glass roof becoming unsafe and forcing occasional platform closures after falling glass.[3] In 1957 it was decided to reduce the area of the roof and concentrate maintenance activities on the remaining area.[4] Between 1957 and 1958, the south-western half of the station roof, and portions of its north-eastern half and the end screens were removed.[3] The original glass panes were replaced by large patent glazing panels.[4] The substantial supporting wall at the south-western side of the station was left in place.[3] The wall is built of sandstone and linked to the main buildings by a series of arched tunnels in the undercroft.[4]
In November 1972, the station received Grade II* listed status; its citation notes: "The building by Tite is among the most important early major railway stations in Britain". In April 1994, the freestanding retaining wall was also listed separately as Grade II.[3]
Restorations
Between October 2010 and March 2011, a series of improvements were performed at Carlisle Station, focused upon its passenger amenities, such as the waiting, meeting and seating areas. From 13 July 2013 to 7 April 2014, as part of a £1.5 million refurbishment project, accessibility at the station was improved via the refurbishment of the lifts and other alterations to achieve step-free access to all of the platforms. In conjunction, a formerly-disused subway was also renovated.[3]
According to rail industry publication Rail Engineer, it was clear by 2014 that the station's roof was in need of restoration.[4] The steel trusses were found to have been sagging in places, which was speculated to have been a result not only of the structure's age but also come as a consequence of the alterations performed during the 1950s, having been exacerbated by the adoption of rigid glazing and insufficient drainage systems. Multiple panels have cracked or broken, resulting in the deployment of several nets to catch falling glass, while rain water often pooled in areas of the roof rather than draining away.[4] Furthermore, maintenance activities were complicated by a lack of access to the roof on the part of safety restrictions, preventing even routine cleaning, thus the panels were perpetually dirty and provided poor natural lighting conditions throughout the platforms.[4]
During November 2015, work commenced upon the repair and refurbishment of the station's roof, as well as the rebuilding of all eight platforms under a £14.7 million scheme that was managed and carried out by national rail infrastructure management company Network Rail.[5] This programme was planned by global design consulting firm Arcadis in close cooperation with both Historic England and Carlisle City Council; while the renovated roof was designed to incorporate modern elements and contemporary construction techniques, significant attention was reportedly paid to maintaining its historical aesthetic. The new roof is primarily composed of ethylene tetrafluoroethylene (EFTE) sheeting and aluminium frames, which is claimed to possess a high level of resistance to corrosion as well as retaining considerable strength and being far lighter than conventional glass panes; other benefits include the roof being shatter-proof and self-cleaning.[4] Construction company Galliford Try served as the principal contractor performing the roof replacement, while Vector Foiltec manufactured and fitted the EFTE sheets. It was also decided to repaint the metalwork of the roof, which was not originally included in the programme's scope.[4][6]
During February 2018, a second phase of this renovation programme, which was focused upon the platforms themselves, was scheduled to commence.[4] Work to resurface and install tactile paving on platforms 1, 2, and 3 was completed in March 2022.[7]
Accidents and incidents
On 4 March 1890, a night express from London was unable to stop on approaching the station, overran signals and collided with a light engine, killing 4 people. The driver claimed that the automatic vacuum brake had failed due to icing in the train pipe between engine and train. The Inspecting Officer disputed this and concluded that the driver had accidentally switched to the simple vacuum brake and released the brakes.[8] This verdict caused some controversy at the time and in subsequent years.
On 6 June 1961, a light engine and a freight train collided under the Caldewgate road bridge.[9]
On 1 May 1984, a runaway freight train collided with and destroyed the River Caldew bridge at Denton Holme. This incident directly contributed to the decision to permanently close the goods line shortly thereafter.[10] However, the goods line was not dismantled; it has been speculated that it could be restored and re-opened to traffic one day, if the measure was to be deemed necessary for the relief of freight congestion in the vicinity of the station.[3]
On 19 October 2022, a freight train carrying cement derailed while crossing the bridge over the River Petteril east of the station, causing significant damage to the infrastructure. At least one of the five derailed wagons ended up in the river.[11][12][13][14]
Facilities
The station is a fully staffed facility during normal hours; the booking office is typically open each day from the start of services in the morning up until 20:00 in the evening. A number of ticket machines are also available in the booking hall, allowing tickets to be purchased even when the booking office is not in service.[15] To the north of the station's portico, located directly between the main entrance and the station offices, is a square clock tower, furnished with an octagonal lantern; to the south of the portico are single-storey waiting and refreshment rooms. Interior details of these rooms included Tudor and Gothic-style fireplaces and linen-fold wood-panelled doors.[3]
Multiple waiting rooms are located on both of the station's main platforms; additionally, there is a newsagent present upon the concourse and a buffet on platform three. Train running information is provided across the station in the form of auditory announcements over a public address system, along with a series of distributed digital display screens. In line with accessibility legislation, full step-free access is possible to all platforms on the station via ramps to the footbridge or lifts and subway.[15]
Platform layout
There are 8 platforms at the station in total – 3 through and 5 bays, organised as follows (from west to east):
Platform 1: Relief West Coast Main Line platform (bi-directional) and occasional Caledonian Sleeper - this is the normal north-bound West Coast Main Line platform.
Platform 2: Cumbrian Coast Line bay.
Platform 3: West Coast Main Line north-bound platform (bi-directional), mostly TransPennine Express north-bound.
Platform 4: West Coast Main Line south-bound platform (bi-directional).
Platform 5 & 6: Tyne Valley Line bay/Carlisle to Leeds Line (Settle and Carlisle line) bay. These platforms often alternate.
Platform 7: Scottish services to various destinations between Carlisle and Glasgow via the Glasgow South Western Line.
Platform 8: Early morning services to Scotland.
There are stabling roads between Platforms 3 and 4 in the train shed, and a loop around Platform 1. There are several electrified sidings to the west of Platform 1. There are substantial buildings on both the western island and the main up platform on the east side, with the main station buffet on the former and the travel centre/ticket office and shop on the latter. Both main platforms have waiting rooms and toilets and are linked by a fully accessible footbridge.
Freight trains formerly used a goods line to the west to bypass the station, but this was closed in 1984 after a runaway rake of container wagons derailed at high speed on the River Caldew bridge at Dentonholme, damaging it beyond economic repair.[10] Nearly all freight services (apart from those running directly from the Cumbrian Coast Line toward the Tyne Valley Line or the Settle–Carlisle Line, or vice versa) now have to use one of the main platform lines when passing through the station, which can cause congestion at peak times.
1tph to London Euston via Birmingham New Street. This through service was a major change from the start of the 2013–14 timetable when the hourly London Euston-Birmingham-Wolverhampton service was combined with the hourly Birmingham to Glasgow/Edinburgh service.
Provide an hourly service Manchester Airport to Edinburgh Waverley and Glasgow Central (alternating). As of December 2019, services also operate between Glasgow Central and Liverpool Lime Street.
ScotRail
Provide the following service: Monday to Saturdays, There is an hourly service to Dumfries with 2-hourly service to Glasgow Central via Kilmarnock. Sundays: There are 5 trains per day to Dumfries with 2 of these trains going to Glasgow Central.
Four trains per day to Lancaster via Whitehaven and Barrow-in-Furness.
Since May 2018, there are now five trains to Leeds on Sundays (including one through to Nottingham) plus a single DalesRail service to Blackpool North via Preston. A Sunday service along the Cumbrian Coast line to Barrow also began at the summer 2018 timetable change (the first since 1976) - eight trains now run to Barrow, plus a further five to Whitehaven only.
Services running through Carlisle from Dumfries to Newcastle were stopped at the May 2022 timetable change.[20]
All Caledonian Sleeper services pass through Carlisle once a night except Saturdays (and engineering diversions) on their journey between London Euston and several Scottish destinations. Passengers may only board the London-bound service from Glasgow Central/Edinburgh Waverley, or only alight services in the opposite direction. Services from/to London Euston to/from Aberdeen, Inverness and Fort William run as a separate train that runs through Carlisle without a scheduled stop.
Excursion trains
Alongside regular passenger trains on select weekends and occasionally during mid-week, excursion trains regularly visit Carlisle as the destination for railtour passengers. The most popular excursion trains are those worked by steam locomotives. The starting points of the trips vary with some travelling from the southern end of the West Coast Main Line at London Euston and from other starting points such as Tyseley, Birmingham, Crewe, York and Liverpool. The routes vary too as there are four main routes that railtours can travel down heading to Carlisle or making their return journeys: West Coast Mainline (over Shap or Beattock); Cumbrian Coast and Furness line; Tyne Valley line; and Settle and Carlisle line. All these are scenic routes, and the first and last give a particular opportunity to see and hear steam engines working at high power output due to the high line speed and steep gradients.
The Cumbrian Mountain Express trains are regular excursions that visit Carlisle. The routes vary from travelling northbound over Shap Summit on the WCML and returning south down the Settle & Carlisle line or vice versa. These now run throughout the year.
All services towards Glasgow and Edinburgh over the WCML were suspended due to flood-related damage to the River Clyde bridge at Lamington (caused by Storm Frank). A limited number of trains to and from Glasgow were being diverted via Dumfries, whilst most others were replaced by express coaches. Repair work was initially expected to take at least four weeks to complete and services were not expected to restart over the structure until March 2016.[21] Following better than expected weather conditions and delivery of key components earlier than planned, the work was completed ahead of schedule and trains resumed on 22 February 2016.[22] This followed on from previous disruption caused by Storm Desmond on 5–6 December 2015 when flooding just north of the station at the bridge over the River Caldew led to a temporary suspension of services to and from Scotland and subsequent major delays to trains for more than two weeks.
Services towards Newcastle and Leeds were also disrupted at the same time due to weather-related landslips near Corbridge and Armathwaite respectively. A replacement bus service ran between Hexham and Prudhoe whilst repairs were carried out on the Tyne Valley line.[23] The line reopened to traffic on 8 February 2016. Services on the Settle line still ran initially, but as only one line was available between Cotehill and Culgaith and capacity was therefore restricted, an emergency timetable was in operation with extended journey times and some trains being replaced by buses.[24] Further ground movement at the landslip site at Eden Brows led to the suspension of all services as far south as Appleby on 9 February 2016, as Network Rail engineers deemed that it was no longer safe to operate trains over the affected portion of line. The line remained closed for over a year whilst the damaged embankment was underpinned and stabilised, and the track and formation repaired.[25] Network Rail started work on the £23 million project to repair the embankment and formation in July 2016.[26] The line reopened on 31 March 2017, with the first train departing on schedule at 05:50 and a special excursion train hauled by the preserved steam locomotive Flying Scotsman visiting the station later in the day.[27]
Proposals to upgrade Carlisle station for the arrival of High Speed 2 (HS2) include extending platforms 3 and 4 to accommodate the longer trains, filling in platform 2 and creating a new platform on the far side of the station from the existing entrance.[28]
Jowett, Alan (March 1989). Jowett's Railway Atlas of Great Britain and Ireland: From Pre-Grouping to the Present Day (1st ed.). Sparkford: Patrick Stephens Ltd. ISBN978-1-85260-086-0. OCLC22311137.
Jowett, Alan (1993). Jowett's Atlas of Railway Centres: of Great Britain showing their development from the earliest times up to and including the 1990s - Volume 1 (1st ed.). Sparkford: Patrick Stephens Ltd. ISBN1-8526-0420-4. OCLC30919645.
^ abStations in Middlesbrough, Redcar and Cleveland, and Stockton-on-Tees are considered part of North East England, while stations in the unitary areas of York and North Yorkshire are considered part of Yorkshire and the Humber.
^Stations in North Lincolnshire and North East Lincolnshire are considered part of Yorkshire and the Humber, while all other stations are considered part of the East Midlands.