This is a list of all the commercial nuclear reactors in the world, sorted by country, with operational status. The list only includes civilian nuclear power reactors used to generate electricity for a power grid . All commercial nuclear reactors use nuclear fission . As of December 2024, there are 419 operable power reactors in the world, with a combined electrical capacity of 378.1 GW. Additionally, there are 64 reactors under construction and 87 reactors planned, with a combined capacity of 69 GW and 84 GW, respectively, while 344 more reactors are proposed.[ 1] For non-power reactors, see List of nuclear research reactors . For fuel plants see List of nuclear reprocessing plants . Where not otherwise specified, all information is sourced from the Power Reactor Information System (PRIS) of the International Atomic Energy Agency (IAEA).[ 2]
In the following tables, the capacity (expressed in megawatt , MW) refers to the net capacity , or the maximum electricity output under reference ambient conditions, after deducting the losses within the system including the energy transformers.[ 3]
Argentina
Plant name
Unit No.
Type
Model
Status
Capacity (MW)
Begin building
Commercial operation
Closed
Atucha [ 4]
1
PHWR
Siemens -KWU
Operation suspended(under maintenance)
362
1 Jun 1968
24 Jun 1974
2
PHWR
Siemens-KWU
Operational
745
14 Jul 1981
27 Jun 2014
3
PWR
Hualong One
Planned[ 5]
1200
Embalse [ 6]
1
PHWR
CANDU-6
Operational
683
1 Apr 1974
20 Jan 1984
(2049 )[ 7]
CAREM
1
PWR
CAREM25
Under construction
25
8 Feb 2014
Armenia
Plant name
Unit No.
Type
Model
Status
Capacity (MW)
Begin building
Commercial operation
Closed
Metsamor
1
PWR
VVER-440 /V-270
Shut down
376
1 Jul 1969
6 Oct 1977
25 Feb 1989
2
PWR
VVER-440/V-270
Operational
375
1 Jul 1975
3 May 1980
(2026)[ 8]
Austria
Plant name
Unit No.
Type
Model
Status
Capacity (MW)
Begin building
Commercial operation
Closed
Zwentendorf
1
BWR
BWR-69 (KWU)
Finished; never entered service
878
Apr 1972
5 Nov 1978
Bangladesh
Plant name
Unit No.
Type
Model
Status
Capacity (MW)
Begin building
Commercial operation
Closed
Rooppur
1
PWR
VVER-1200 /V-523
Under construction
1080
30 Nov 2017 [ 9]
(2025 )
2
PWR
VVER-1200/V-523
Under construction
1080
14 Jul 2018
(2026 )
Belarus
Plant name
Unit No.
Type
Model
Status
Capacity (MW)
Begin building
Commercial operation
Closed
Ostrovets
1
PWR
VVER-1200 /V-491
Operational
1109
6 Nov 2013
10 Jun 2021[ 10]
2
PWR
VVER-1200/V-491
Operational
1109
24 Apr 2014
1 Nov 2023 [ 11]
Minsk
1
PWR
VVER-1000
Unfinished
963
1983
1987
2
PWR
VVER-1000
Unfinished
963
1983
1987
Belgium
Plant name
Unit No.
Type
Model
Status
Capacity (MW)
Begin building
Commercial operation
Closed
SCK•CEN
1
PWR
Westinghouse (WH) BR-3
Decommissioned
10
1 Nov 1957
10 Oct 1962
30 Jun 1987
Doel
1
PWR
WH 2 loops
Operational
445
1 Jul 1969
15 Feb 1975
(15th feb. 2025 )
2
PWR
WH 2 loops
Operational
445
1 Sep 1971
1 Dec 1975
(1st dec. 2025 )
3
PWR
Framatome 3 loops
Shut down
1006
1 Jan 1975
1 Oct 1982
23 Sep 2022 [ 12]
4
PWR
Belgian firms plus WH 3 loops
Operational
1039
1 Dec 1978
1 Jul 1985
(1st jul. 2025 )
planned prolongation
of operations until 2035 [ 13]
Tihange
1
PWR
Framatome 3 loops
Operational
962
1 Jun 1970
1 Oct 1975
(1st oct. 2025 )
2
PWR
Framatome 3 loops
Shut down
1008
1 Apr 1976
1 Jun 1983
31 Jan 2023 [ 14]
3
PWR
Belgian firms plus WH 3 loops
Operational
1046
1 Nov 1978
1 Sep 1985
(1st sept. 2025 )
planned prolongation
of operations until 2035
Brazil
Plant name
Unit No.
Type
Model
Status
Capacity (MW)
Begin building
Commercial operation
Closed
Angra
1
PWR
WH 2 loops
Operational
609
1 May 1971
1 Jan 1985
2
PWR
Pre-Konvoi
Operational
1275
1 Jan 1976
1 Feb 2001
3
PWR
Pre-Konvoi
Under construction
1245
1 Jun 2010
(2028)[ 15]
Bulgaria
Canada
Plant name
Unit No.
Type
Model
Status
Capacity (MW)
Begin building
Commercial operation
Closed
Pickering
1
PHWR
CANDU 500A
Shut down
515
Jun 1966
29 Jul 1971
1 Oct 2024
2
PHWR
CANDU 500A
Shut down
515
Sep 1966
30 Dec 1971
31 Dec 1997 [ 17]
3
PHWR
CANDU 500A
Shut down
515
Dec 1967
1 Jun 1972
29 Dec 1997
4
PHWR
CANDU 500A
Operational
515
May 1968
17 Jun 1973
(2024 )
5
PHWR
CANDU 500B
Operational
516
Nov 1974
10 May 1983
(2026 )
6
PHWR
CANDU 500B
Operational
516
Oct 1975
1 Feb 1984
(2026 )
7
PHWR
CANDU 500B
Operational
516
Mar 1976
1 Jan 1985
(2026 )
8
PHWR
CANDU 500B
Operational
516
Sep 1976
28 Feb 1986
(2026 )[ 18]
Darlington
1
PHWR
CANDU 850
Operational
878
Apr 1982
14 Nov 1992
(2052 )
2
PHWR
CANDU 850
Operational
878
Sep 1981
9 Oct 1990
(2050 )
3
PHWR
CANDU 850
Operational
878
Sep 1984
14 Feb 1993
(2053 )
4
PHWR
CANDU 850
Operational
878
Jul 1985
14 Jun 1993
(2053 )
5[ 19]
BWR
BWRX-300
Planned
300
(2023)
(2028 )
6[ 19]
BWR
BWRX-300
Planned
300
(2023 )
(2028 )
7
BWR
BWRX-300
Planned
300
(2023 )
(2029 )
8
BWR
BWRX-300
Planned
300
(2023 )
(2029 )[ 20]
Bruce
1
PHWR
CANDU 791
Operational
823
Jun 1971
1 Sep 1977
(2043 )
2
PHWR
CANDU 791
Operational
823[ 21]
Dec 1970
1 Sep 1977
(2043 )
3
PHWR
CANDU 750A
Operational
817
Jul 1972
1 Feb 1978
(2064 )[ 22]
4
PHWR
CANDU 750A
Operational
817
Sep 1972
18 Jan 1979
(2064 )
5
PHWR
CANDU 750B
Operational
817
Jun 1978
1 Mar 1985
(2064 )
6
PHWR
CANDU 750B
Operational
880[ 23]
Jan 1978
15 Sep 1984
(2064 )
7
PHWR
CANDU 750B
Operational
817
May 1979
10 Apr 1986
(2064 )
8
PHWR
CANDU 750B
Operational
817
Aug 1979
22 May 1987
(2064 )
NPD
1
PHWR
CANDU
Shut down
19
Jan 1958
4 Jun 1962
1 Aug 1987
Douglas Point
1
PHWR
CANDU 200
Shut down
200
Feb 1960
26 Sep 1968
4 May 1984
Gentilly
1
BWR
CANDU BLWR 250
Shut down
250
Sep 1966
1 May 1972
1 June 1977
2
PHWR
CANDU-6
Shut down
635
Apr 1974
1 Oct 1983
28 Dec 2012
Point Lepreau
1
PHWR
CANDU-6
Operational
635
May 1975
1 Feb 1983
(2041 )
China
Cuba
Plant name
Unit No.
Type
Model
Status
Capacity (MW)
Begin building
Commercial operation
Closed
Juragua
1
PWR
VVER-440 /V-318
Unfinished
440
1983
5 Sep 1992
2
PWR
VVER-440 /V-318
Unfinished
440
1985
5 Sep 1992
Czech Republic
Plant name
Unit No.
Type
Model
Status
Capacity (MW)
Begin building
Commercial operation
Closed
Dukovany
1
PWR
VVER-440 /V-213
Operational
468
1 Jan 1979
3 May 1985
2
PWR
VVER-440/V-213
Operational
471
1 Jan 1979
21 Mar 1986
3
PWR
VVER-440/V-213
Operational
468
1 Mar 1979
20 Dec 1986
4
PWR
VVER-440/V-213
Operational
471
1 Mar 1979
19 Jul 1987
5
PWR
TBD
Planned
1200
6
PWR
TBD
Planned
1200
Temelín
1
PWR
VVER-1000 /V-320
Operational
1003
1 Feb 1987
10 Jun 2002
2
PWR
VVER-1000/V-320
Operational
1003
1 Feb 1987
18 Apr 2003
3
PWR
TBD
Planned
1200
4
PWR
TBD
Planned
1200
Egypt
Plant name
Unit No.
Type
Model
Status
Capacity (MW)
Begin building
Commercial operation
Closed
El Dabaa
1
PWR
VVER-1200 /V-529
Under construction
1200
20 Jul 2022[ 60]
(2028 )
2
PWR
VVER-1200/V-529
Under construction
1200
19 Nov 2022[ 61]
3
PWR
VVER-1200/V-529
Under construction
1200
3 May 2023[ 62]
4
PWR
VVER-1200/V-529
Under construction
1200
23 Jan 2024
Finland
Plant name
Unit No.
Type
Model
Status
Capacity (MW)[ 63]
Begin building
Commercial operation
Closed
Hanhikivi
1
PWR
VVER-1200 /V-491
Cancelled
1200
(2023)
(2029)
2 May 2022[ 64] [ 65]
Loviisa
1
PWR
VVER-440 /V-213
Operational
507
1 May 1971
9 May 1977
2
PWR
VVER-440 /V-213
Operational
507
1 Aug 1972
5 Jan 1981
Olkiluoto
1
BWR
ASEA -III, BWR-2500
Operational
890
1 Feb 1974
10 Oct 1979
2
BWR
ASEA -III, BWR-2500
Operational
890
1 Nov 1975
10 Jul 1982 [ 66]
3
PWR
EPR
Operational
1600
12 Aug 2005
16 Apr 2023 [ 67]
France
Germany
Hungary
Plant name
Unit No.
Type
Model
Status
Capacity (MW)
Begin building
Commercial operation
Closed
Paks
1
PWR
VVER-440 /V-213
Operational
470
1 Aug 1974
10 Aug 1983
2
PWR
VVER-440/V-213
Operational
473
1 Aug 1974
14 Nov 1984
3
PWR
VVER-440/V-213
Operational
473
1 Oct 1979
1 Dec 1986
4
PWR
VVER-440/V-213
Operational
471
1 Oct 1979
1 Nov 1987
5
PWR
VVER-1200
Planned
1114
(2025 )
6
PWR
VVER-1200
Planned
1114
(2025 )
India
Iran
Plant name
Unit No.
Type
Model
Status
Capacity (MW)
Begin building
Commercial operation
Closed
Bushehr
1
PWR
VVER-1000 /V-446
Operational
915
1 May 1975
23 Sep 2013
2
PWR
VVER-1000/V-528
Under construction
915
27 Sep 2019
3
PWR
VVER-1000
Planned
915
Darkhovin
1
PWR
Unfinished; restart planned
360
Italy
Plant name
Unit No.
Type
Model
Status
Capacity (MW)
Begin building
Commercial operation
Closed
Caorso
1
BWR
BWR-4 Mark2
Shut down/in decommissioning
860
1 Jan 1970
1 Dec 1981
1 Jul 1990
Enrico Fermi
1
PWR
WH 4-loop
Shut down/in decommissioning
260
1 Jul 1961
1 Jan 1965
1 Jul 1990
Garigliano
1
BWR
BWR-1
Shut down/in decommissioning
150
1 Nov 1959
1 Jun 1964
1 Mar 1982
Latina
1
GCR
Magnox
Shut down/in decommissioning
153
1 Nov 1958
1 Jan 1964
1 Dec 1987
Alto Lazio
1
BWR
Unfinished
982
1 Jul 1982
1 Jan 1988
2
BWR
Unfinished
982
1 Jul 1982
1 Jul 1988
Trino 2 [IT ]
1
PWR
Unfinished
950
23 Dec 1987
2
PWR
Unfinished
950
23 Dec 1987
Japan
Kazakhstan
Plant name
Unit No.
Type
Model
Status
Capacity (MW)
Begin building
Commercial operation
Closed
Aktau
1
FBR
BN-350
Shut down/in decommissioning
350
1 Oct 1964
16 Jul 1973
22 Apr 1999
Lithuania
Plant name
Unit No.
Type
Model
Status
Capacity (MW)
Begin building
Commercial operation
Closed
Ignalina
1
LWGR
RBMK-1500
Shut down/in decommissioning
1185
1 May 1977
31 Dec 1983
31 Dec 2004
2
LWGR
RBMK-1500
Shut down/in decommissioning
1185
1 Jan 1978
Aug 1987
31 Dec 2009
3
LWGR
RBMK-1500
Unfinished
1185
Mexico
Plant name
Unit No.
Type
Model
Status
Capacity (MW)
Begin building
Commercial operation
Closed
Laguna Verde
1
BWR
BWR-5
Operational
804
1 Oct 1976
28 Jul 1990
2
BWR
BWR-5
Operational
800
1 Jun 1977
10 Apr 1995
Netherlands
Plant name
Unit No.
Type
Model
Status
Capacity (MW)
Begin building
Commercial operation
Closed
Borssele
1
PWR
KWU 2LP
Operational
482
1 Jul 1969
26 Oct 1973
(2033 )
Dodewaard
1
BWR
BWR-2
Shut down
55
1 May 1965
26 Mar 1969
26 Mar 1997
North Korea
Pakistan
Plant name
Unit No.
Type
Model
Status
Capacity (MW)
Begin building
Commercial operation
Closed
Chashma
1
PWR
CNP-300
Operational
300
1 Aug 1993
15 Sep 2000
2
PWR
CNP-300
Operational
300
28 Dec 2005
18 May 2011
3
PWR
CNP-300
Operational
315
28 May 2011
6 Dec 2016
4
PWR
CNP-300
Operational
313
18 Dec 2011
19 Sep 2017
5
PWR
Hualong One
Planned
1080
Karachi
1
PHWR
CANDU
Shut down
90
1 Aug 1966
7 Dec 1972
1 Aug 2021
2
PWR
Hualong One
Operational
1014
23 May 2013
19 Mar 2021 [ 88]
3
PWR
Hualong One
Operational
1014
31 May 2016
18 Apr 2022
Philippines
Plant name
Unit No.
Type
Model
Status
Capacity (MW)
Begin building
Commercial operation
Closed
Bataan
1
PWR
Westinghouse
Unfinished; restart planned[ 89]
621
1976
1986
Poland
Romania
Plant name
Unit No.
Type
Model
Status
Capacity (MW)
Begin building
Commercial operation
Closed
Cernavodă
1
PHWR
CANDU-6
Operational
650
31 Mar 1983
2 Dec 1996
2
PHWR
CANDU-6
Operational
650
1 Jul 1983
1 Nov 2007
3
PHWR
CANDU-6
Unfinished; restart planned
650
4
PHWR
CANDU-6
Unfinished; restart planned
650
5
PHWR
CANDU-6
Unfinished
650
Russia
Slovakia
Plant name
Unit No.
Type
Model
Status
Capacity (MW)
Begin building
Commercial operation
Closed
Bohunice
A-1[ 111]
HWGCR
KS 150
Decommissioned
93
1 Aug 1958
25 Dec 1972
22 Feb 1977
1[ 112]
PWR
VVER-440 /V-230
Shut down
408
24 Apr 1972
1 Apr 1980
31 Dec 2006
2
PWR
VVER-440/V-230
Shut down
408
24 Apr 1972
1 Jan 1981
31 Dec 2008
3
PWR
VVER-440/V-213
Operational
472
1 Dec 1976
14 Feb 1985
(2045 )
4
PWR
VVER-440/V-213
Operational
471
1 Dec 1976
18 Dec 1985
(2045 )
Mochovce
1
PWR
VVER-440 V-213
Operational
436
13 Oct 1983
29 Oct 1998
(2058 )
2
PWR
VVER-440/V-213
Operational
436
13 Oct 1983
11 Apr 2000
(2060 )
3
PWR
VVER-440/V-213
Operational
440
27 Jan 1987
17 Oct 2023 [ 113]
4
PWR
VVER-440/V-213
Under construction
440
27 Jan 1987
Slovenia
Plant name
Unit No.
Type
Model
Status
Capacity (MW)
Begin building
Commercial operation
Closed
Krško
1
PWR
WH 2 loops
Operational
688
30 Mar 1975
1 Jan 1983
(2043)[ 114]
2
PWR
TBD
Planned
1100
(2030)[ 115]
South Africa
Plant name
Unit No.
Type
Model
Status
Capacity (MW)
Begin building
Commercial operation
Closed
Koeberg
1
PWR
CP1 (France)
Operational
930
1 Jul 1976
21 Jul 1984
2
PWR
CP1 (France)
Operational
930
1 Jul 1976
9 Nov 1985
South Korea
Plant name
Unit No.
Type
Model
Status
Capacity (MW)
Begin building
Commercial operation (planned)
Closed
Hanbit
1
PWR
WH F
Operational
960
4 Jun 1981
25 Aug 1986
2
PWR
WH F
Operational
958
10 Dec 1981
10 Jun 1987
3
PWR
OPR-1000
Operational
997
23 Dec 1989
31 Mar 1995
4
PWR
OPR-1000
Operational
997
26 May 1990
1 Jan 1996
5
PWR
OPR-1000
Operational
997
29 Jun 1997
21 May 2002
6
PWR
OPR-1000
Operational
995
20 Nov 1997
24 Dec 2002
Hanul
1
PWR
CP1 (France)
Operational
960
26 Jan 1983
10 Sep 1988
2
PWR
CP1 (France)
Operational
962
5 Jul 1983
30 Sep 1989
3
PWR
OPR-1000
Operational
994
21 Jul 1993
11 Aug 1998
4
PWR
OPR-1000
Operational
998
1 Nov 1993
31 Dec 1999
5
PWR
OPR-1000
Operational
996
1 Oct 1999
29 Jul 2004
6
PWR
OPR-1000
Operational
996
29 Sep 2000
22 Apr 2005
Shin-Hanul
1
PWR
APR-1400
Operational
1340
10 Jul 2012
7 Dec 2022 [ 116]
2
PWR
APR-1400
Operational
1340
19 Jul 2012
5 Apr 2024 [ 117]
3
PWR
APR-1400
Under construction[ 118]
1340
30 Oct 2024
(2032)
4
PWR
APR-1400
Under construction[ 118]
1340
30 Oct 2024
(2033)
Kori
1
PWR
WH 60
Shut down
576
27 Apr 1972
29 Apr 1978
18 Jun 2017
2
PWR
WH F
Operational
640
4 Dec 1977
25 Jul 1983
3
PWR
WH F
Operational
1011
1 Oct 1979
30 Sep 1985
4
PWR
WH F
Operational
1012
1 Apr 1980
29 Apr 1986
Shin-Kori
1
PWR
OPR-1000
Operational
996
16 Jun 2006
28 Feb 2011
2
PWR
OPR-1000
Operational
996
5 Jun 2007
20 Jul 2012
Saeul
1
PWR
APR-1400
Operational
1416
16 Oct 2008
15 Jan 2016
2
PWR
APR-1400
Operational
1418
19 Aug 2009
29 Aug 2019 [ 119]
3
PWR
APR-1400
Under construction
1400
1 Apr 2017
4
PWR
APR-1400
Under construction
1400
20 Sep 2018
Wolsong
1
PHWR
CANDU-6
Shut down
657
30 Oct 1977
22 Apr 1983
24 Dec 2019
2
PHWR
CANDU-6
Operational
655
22 Jun 1992
1 Jul 1997
3
PHWR
CANDU-6
Operational
684
17 Mar 1994
1 Jul 1998
4
PHWR
CANDU-6
Operational
688
22 Jul 1994
1 Oct 1999
Shin-Wolsong
1
PWR
OPR-1000
Operational
991
20 Nov 2007
31 Jul 2012
2
PWR
OPR-1000
Operational
960
23 Sep 2008
26 Feb 2015
Spain
Plant name
Unit No.
Type
Model
Status
Capacity (MW)
Begin building
Commercial operation
Closed
Almaraz
1
PWR
WH 3 loops
Operational
1011
3 Jul 1973
1 Sep 1983
2
PWR
WH 3 loops
Operational
1006
3 Jul 1973
1 Jul 1984
Ascó
1
PWR
WH 3 loops
Operational
995
16 May 1974
10 Dec 1984
2
PWR
WH-3 loops
Operational
997
7 Mar 1975
31 Mar 1986
Cofrentes
1
BWR
BWR-6
Operational
1064
9 Sep 1975
11 Mar 1985
José Cabrera
1
PWR
WH 1 loop
Shut down/in decommissioning
141
24 Jun 1964
13 Aug 1969
30 Apr 2006
Lemoniz
1
PWR
Unfinished
1972
1984
2
PWR
Unfinished
1972
1984
Santa María de Garoña
1
BWR
BWR-3
Shut down/in decommissioning
446
11 May 1971
15 Feb 1975
6 Jul 2013
Trillo
1
PWR
KWU 3 loops
Operational
1003
17 Aug 1979
6 Aug 1988
Valdecaballeros
1
BWR
Unfinished
1975
1984
2
BWR
Unfinished
1975
1984
Vandellòs
1
GCR
UNGG
Shut down/in decommissioning
480
1967
2 Aug 1972
31 Jul 1990
2
PWR
WH 3 loops
Operational
1045
29 Dec 1980
8 Mar 1988
Sweden
Plant name
Unit No.
Type
Model
Status
Capacity (MW)
Begin building
Commercial operation
Closed
Ågesta
1
PHWR
R3
Shut down/in decommissioning
10
1 Dec 1957
1 May 1964
2 Jun 1974
[ a]
Barsebäck
1
BWR
ASEA -II
Shut down/in decommissioning
600
1 Feb 1971
1 Jul 1975
30 Nov 1999
[ b]
2
BWR
ASEA -II
Shut down/in decommissioning
600
1 Jan 1973
1 Jul 1977
31 May 2005
[ c]
Forsmark
1
BWR
ASEA -III, BWR-2500
Operational
986
1 Jun 1973
10 Dec 1980
[ d]
2
BWR
ASEA -III, BWR-2500
Operational
1116
1 Jan 1975
7 Jul 1981
[ e]
3
BWR
ASEA -IV, BWR-3000
Operational
1167
1 Jan 1979
18 Aug 1985
[ f]
Oskarshamn
1
BWR
ASEA -I
Shut down/in decommissioning
473
1 Aug 1966
6 Feb 1972
19 Jun 2017
[ g]
2
BWR
ASEA -II
Shut down/in decommissioning
638
1 Sep 1969
1 Jan 1975
22 Dec 2016
[ h]
3
BWR
ASEA -IV, BWR-3000
Operational
1450
1 May 1980
15 Aug 1985
[ i]
Marviken
1
BHWR
R4
Unfinished
196
1 Apr 1965
27 May 1970
[ j]
Ringhals
1
BWR
ASEA -I
Shut down/in decommissioning
881
1 Feb 1969
1 Jan 1976
31 Dec 2020
[ k]
2
PWR
WH 3-loops
Shut down/in decommissioning
904
1 Oct 1970
1 May 1975
30 Dec 2019
[ l]
3
PWR
WH 3-loops
Operational
1062
1 Sep 1972
9 Sep 1981
[ m]
4
PWR
WH 3-loops
Operational
1104
1 Nov 1973
21 Nov 1983
[ n]
Switzerland
Plant name
Unit No.
Type
Model
Status
Capacity (MW)
Begin building
Commercial operation
Closed[ 125]
Beznau
1
PWR
WH 2-loops
Operational
365
1 Sep 1965
1 Sep 1969
(2029 )
2
PWR
WH 2-loops
Operational
365
1 Jan 1968
1 Dec 1971
(2031 )
Gösgen
1
PWR
KWU 3-loops
Operational
1010
1 Dec 1973
1 Nov 1979
Leibstadt
1
BWR
BWR-6
Operational
1220
1 Jan 1974
15 Dec 1984
Lucens
1
HWGCR
HWGCR
Decommissioned
6
1 Apr 1962
29 Dec 1966
21 Jan 1969
Mühleberg
1
BWR
BWR-4
Shut down/in decommissioning
373
1 Mar 1967
6 Nov 1972
20 Dec 2019
Taiwan
Plant name
Unit No.
Type
Model
Status
Capacity (MW)
Begin building
Commercial operation
Closed
Jinshan
1
BWR
BWR-4
Shut down/in decommissioning
636
2 Jun 1972
10 Dec 1978
3 Oct 2018
2
BWR
BWR-4
Shut down/in decommissioning
636
7 Dec 1973
15 Jul 1979
3 Oct 2018
Kuosheng
1
BWR
BWR-6
Shut down
985
19 Nov 1975
28 Dec 1981
1 Jul 2021[ 126]
2
BWR
BWR-6
Shut down
985
15 Mar 1976
16 Mar 1983
15 Mar 2023
Lungmen
1
BWR
ABWR
Unfinished
1350
31 Mar 1999
27 April 2014 [ 127]
2
BWR
ABWR
Unfinished
1350
30 Aug 1999
27 April 2014 [ 127]
Maanshan
1
PWR
WH 312 3-loop
Shut down
951
21 Aug 1978
27 Jul 1984
28 Jul 2024
2
PWR
WH 312 3-loop
Operational
951
21 Feb 1979
18 May 1985
Turkey
Plant name
Unit No.
Type
Model
Status
Capacity (MW)
Begin building
Commercial operation
Closed
Akkuyu
1
PWR
VVER-1200 /V-509
Under construction
1114
3 Apr 2018
(2025)[ 128]
2
PWR
VVER-1200/V-509
Under construction
1114
8 Apr 2020
(2026)
3
PWR
VVER-1200/V-509
Under construction
1114
10 Mar 2021
(2027)
4
PWR
VVER-1200/V-509
Under construction
1114
21 Jul 2022[ 129]
(2028)
Sinop [ 130] [ 131]
1
PWR
Atmea -1
Cancelled
1100
2
PWR
Atmea-1
Cancelled
1100
3
PWR
Atmea-1
Cancelled
1100
4
PWR
Atmea-1
Cancelled
1100
Ukraine
United Arab Emirates
United Kingdom
United States
Uzbekistan
See also
Notes
^ The full reactor model name is R3/Adam.[ 120]
^ The full reactor model name is ASEA -ATOM Gen II.[ 121]
^ The full reactor model name is ASEA -ATOM Gen II.[ 121]
^ The full reactor model name is ASEA -ATOM Gen III,[ 121] BWR-2500,[ 121] BWR 69.[ 122]
^ The full reactor model name is ASEA -ATOM Gen III,[ 121] BWR-2500,[ 121] BWR 69.[ 122]
^ The full reactor model name is ASEA -ATOM Gen IV,[ 121] BWR-3000,[ 121] BWR 75.[ 122]
^ The full reactor model name is ASEA -ATOM Gen I.[ 121]
^ The full reactor model name is ASEA -ATOM Gen II.[ 121]
^ The full reactor model name is ASEA -ATOM Gen IV,[ 121] BWR-3000,[ 121] BWR 75.[ 123]
^ The full reactor model name is R4/Eva. Construction date is approximate. Data are from Swedish Radiation Safety Authority.[ 120]
^ The full reactor model name is ASEA -ATOM Gen I.[ 121] Closed at midnight on New Year's Eve.[ 124]
^ The full reactor model name is Westinghouse 3-loops.[ 121]
^ The full reactor model name is Westinghouse 3-loops.[ 121]
^ The full reactor model name is Westinghouse 3-loops.[ 121]
References
^ "World Nuclear Power Reactors & Uranium Requirements" . world-nuclear.org . World Nuclear Association. Retrieved 5 May 2020 .
^ "PRIS – Home" . pris.iaea.org .
^ "Reference Unit Power" at IAEA
^ "Nuclear Power in Argentina | Argentinian Nuclear Energy – World Nuclear Association" . world-nuclear.org . Retrieved 4 August 2019 .
^ "China inks $8 bln nuclear power plant deal in Argentina" . Reuters . 2 February 2022. Retrieved 2 February 2022 .
^ Yulia Kosarenko. "NASA fact sheet" . Archived from the original on 8 July 2007. Retrieved 20 August 2015 .
^ "The Embalse Nuclear Power Plant returns to service for a new cycle of 30 years" . BNamericas.com .
^ "Metsamor 2 to operate until 2026 : Corporate – World Nuclear News" .
^ "Nuclear Power in Bangladesh – World Nuclear Association" . world-nuclear.org . Retrieved 17 July 2018 .
^ "Росатом Госкорпорация "Росатом" ядерные технологии атомная энергетика АЭС ядерная медицина" . rosatom.ru .
^ "Second Belarus unit enters commercial operation" . world-nuclear-news.org .
^ "Doel 3: Shutdown confirmed for Friday" . RTBF Info. 23 September 2022. Retrieved 25 September 2022 .
^ "RTBF Info of 21 Dec 2018" . RTBF Info. 21 December 2018. Retrieved 28 December 2018 .
^ "Second Belgian reactor enters retirement : Corporate - World Nuclear News" .
^ a b c "Plans for New Nuclear Reactors Worldwide - World Nuclear Association" .
^ a b c "Bulgaria to push ahead with two new units at Kozloduy" . world-nuclear-news.org . World Nuclear News. 25 October 2023. Retrieved 3 November 2023 .
^ "Utility abandons Pickering reactor overhaul" . The Globe and Mail . 13 August 2005.
^ "Ontario extends Pickering operations" . World Nuclear News . 30 September 2022. Retrieved 7 July 2023 .
^ a b Patel, Sonal (2 December 2021). "Darlington Nuclear Plant Will Get a BWRX-300 SMR as GE Hitachi Bags Lucrative OPG Selection" . POWER Magazine . Retrieved 5 December 2021 .
^ "Additional SMRs in the pipeline for Darlington" . World Nuclear News. 7 July 2023. Retrieved 7 July 2023 .
^ "Unit 2 sets record run ahead of planned maintenance outage" . brucepower.com . 6 May 2022. Retrieved 7 July 2023 .
^ "Life-Extension Program & MCR Project" . brucepower.com . Retrieved 7 July 2023 .
^ "Bruce 6 re-enters commercial operation : Corporate - World Nuclear News" .
^ a b "China / Construction Begins of Two Hualong One Reactors at Changjiang" . The Independent Global Nuclear News Agency . Retrieved 28 November 2019 .
^ a b "我国自主三代核电华龙一号在海南正式开工建设" . CNNC. Retrieved 2 April 2021 .[permanent dead link ]
^ "China's first Hualong One nuclear reactor starts Opened" . Reuters . 30 January 2021. Retrieved 30 January 2021 .
^ "Second Fuqing Hualong One enters Opened: New Nuclear – World Nuclear News" .
^ "Second AP1000 enters Opened" . World Nuclear News . World Nuclear Association. Retrieved 24 October 2018 .
^ "Fourth Chinese AP1000 enters Opened" . World Nuclear News . World Nuclear Association. Retrieved 13 January 2019 .
^ "Begin buildings on third Haiyang unit" . World Nuclear News . World Nuclear Association. Retrieved 25 July 2022 .
^ "Construction begins of fourth Haiyang unit" . World Nuclear News . World Nuclear Association. Retrieved 26 April 2023 .
^ "China Nuclear Power | Chinese Nuclear Energy – World Nuclear Association" . world-nuclear.org . Retrieved 16 July 2018 .
^ "Fifth Hongyanhe unit enters Opened" . World Nuclear News . World Nuclear Association. Retrieved 2 August 2021 .
^ "China Nuclear Power | Chinese Nuclear Energy – World Nuclear Association" . world-nuclear.org . Retrieved 15 June 2018 .
^ "Construction of Lufeng 5 gets under way" . World Nuclear News . World Nuclear Association. Retrieved 9 September 2022 .
^ "Construction of Lufeng 6 begins" . World Nuclear News . World Nuclear Association. Retrieved 29 August 2023 .
^ "Construction of new Chinese power plant begins: New Nuclear – World Nuclear News" . world-nuclear-news.org . Retrieved 5 January 2021 .
^ "First concrete for unit 2 of China's San'ao nuclear power project- Nuclear Engineering International" . Retrieved 4 January 2022 .
^ "First AP1000 reactor enters Opened" . World Nuclear News . World Nuclear Association. Retrieved 24 October 2018 .
^ "Sanmen 2 AP1000 enters Opened – World Nuclear News" . world-nuclear-news.org . Retrieved 7 November 2018 .
^ "PRIS – Reactor Details" . pris.iaea.org . Retrieved 8 July 2022 .
^ "Begin buildings on fourth Sanmen unit" . world-nuclear-news.org . Retrieved 23 March 2023 .
^ "China's demonstration HTR-PM enters commercial operation : New Nuclear - World Nuclear News" .
^ "Shidaowan Guohe One 1" .
^ "Shidaowan Guohe One 2" .
^ a b "China approves first new nuclear reactors in 3-plus years" . Nikkei Asian Review . Retrieved 2 August 2019 .
^ "EDF : le premier des 2 EPR de la centrale de Taishan (Chine) entre en exploitation commerciale" . Capital.fr (in French). 14 December 2018. Retrieved 14 December 2018 .[permanent dead link ]
^ "World's second EPR starts operations" . Retrieved 10 September 2019 .
^ "Fourth Tianwan unit enters Opened" . World Nuclear News . World Nuclear Association. Retrieved 27 December 2018 .
^ "Fifth Tianwan unit starts Opened" . World Nuclear News . World Nuclear Association. Retrieved 9 September 2020 .
^ "Tianwan 6 enters commercial operation : New Nuclear - World Nuclear News" .
^ "Begin buildings on eighth Tianwan unit: New Nuclear – World Nuclear News" .
^ "Fast nuclear reactor to start construction in Fujian in 2017" . 16 August 2015. Archived from the original on 17 August 2015. Retrieved 16 August 2015 .
^ "China starts building second CFR-600 fast reactor: New Nuclear – World Nuclear News" . world-nuclear-news.org . Retrieved 30 December 2020 .
^ "Work on Xudabao unit 1 gets under way" . world-nuclear-news.org . Retrieved 17 November 2023 .
^ "Дан старт сооружению новых блоков российского дизайна атомных станций "Тяньвань" и "Сюйдапу" (Китай)" . ruscable.ru .
^ "Construction of Xudapu 4 under way: New Nuclear – World Nuclear News" .
^ "Yangjiang 5 enters Opened" . world-nuclear-news.org . Retrieved 16 July 2018 .
^ "Begin buildings on first Zhangzhou unit – World Nuclear News" . world-nuclear-news.org . Retrieved 18 October 2019 .
^ "Construction of Egypt's first nuclear power plant under way : New Nuclear – World Nuclear News" .
^ "PRIS – Reactor Details" .
^ "Construction begins of third unit at Egypt's el Dabaa nuclear power plant : New Nuclear - World Nuclear News" .
^
"Nuclear power plants in Finland" . STUK . 6 April 2021. Retrieved 13 May 2022 .
^ "Fennovoima cancels Hanhikivi 1 contract with Russia" . World Nuclear Association . 3 May 2022.
^
"Fennovoima terminates contract for Hanhikivi 1 NPP construction" . TASS . 2 May 2022.
^ "PRIS – Reactor Details" .
^ "Faulty seals replaced in Olkiluoto EPR : Regulation & Safety - World Nuclear News" .
^ "EDF begins permitting process for two new reactors at Penly : New Nuclear - World Nuclear News" . world-nuclear-news.org . Retrieved 9 December 2023 .
^ a b "Germany shuts three of its last six nuclear plants" . Retrieved 1 January 2022 .
^ "German reactor permanently shut down" . world-nuclear-news.org . Retrieved 10 May 2018 .
^ "Germany shuts down Philippsburg 2" . energycentral.com . Retrieved 8 January 2020 .
^ a b c d e f g h i j k l m n o p q "Status report 74 – Indian 220 MWe PHWR (IPHWR-220)" (PDF) .
^ a b c d "Status report 105 – Indian 700 MWe PHWR (IPHWR-700)" (PDF) .
^ "В Индии началось сооружение блока № 6 АЭС "Куданкулам" " . ase-ec.ru (in Russian). Retrieved 21 December 2021 .
^ "PRIS – Reactor Details" .
^ https://www.thehindu.com/news/national/kerala/centre-willing-to-clear-nuclear-power-plant-project-in-state-if-land-is-available-manohar-lal/article69015509.ece
^ "Genkai unit 4 supplying power again" . world-nuclear-news.org . Retrieved 22 June 2018 .
^ a b c d e f g h "Licensing status for the Japanese nuclear facilities – Japan Nuclear Safety Institute" . genanshin.jp . Retrieved 3 October 2021 .
^ "東通原子力発電所1号機の着工について" . Tokyo Electric Power Company Holdings, Inc . Retrieved 27 June 2023 .
^ a b "Nuclear Power Plants in Japan – The Federation of Electric Power Companies of Japan(FEPC)" . fepc.or.jp . Retrieved 8 May 2018 .
^ "40年超の美浜原発3号機が再稼働 原発事故後 全国初" . NHK . Retrieved 23 June 2021 .
^ "Ohi No.4 reactor restarted- News – NHK WORLD – English" . NHK WORLD . Archived from the original on 10 May 2018. Retrieved 10 May 2018 .
^ "Japan's Tohoku Elec restarts Onagawa reactor after 13-year hiatus – Reuters" . Reuters. Retrieved 29 October 2024 .
^ "運転開始40年超高浜原発1号機 約12年ぶりに再稼働" . Retrieved 28 July 2023 .
^ "Takahama 2 reactor restarted" . Retrieved 15 September 2023 .
^ "Japan approves extension for reactor similar to Fukushima units that melted down – Reuters" . Reuters. Retrieved 29 December 2019 .
^ a b "North Korea's Yongbyon Nuclear Facility: Slow Progress at the Experimental Light Water Reactor" . 38 North . U.S.-Korea Institute, Johns Hopkins University School of Advanced International Studies. 14 January 2016. Archived from the original on 9 April 2016. Retrieved 4 April 2016 .
^ "PRIS - Reactor Details" .
^ "Philippines relaunches nuclear energy programme : Nuclear Policies" . World Nuclear News. 3 March 2022. Retrieved 29 April 2022 .
^ a b c d "Poland's Westinghouse choice 'deepens strategic relationship' with USA" . 31 October 2022.
^ "Poland's government confirms Westinghouse for nuclear plant" . 4 November 2022.
^ "South Korea's KHNP signs letter of intent on Polish nuclear" . 31 October 2022.
^ a b c d e f g "Taki reaktor chcą zbudować Orlen i Synthos" . 18 April 2023.
^ "Rosatom State Atomic Energy Cooperation | ROSATOM's first of a kind floating power unit connects to isolated electricity grid in Pevek, Russia's Far East" . rosatom.ru . Retrieved 1 January 2020 .
^ a b "Nuclear Power in Russia | Russian Nuclear Energy – World Nuclear Association" . world-nuclear.org . Retrieved 14 May 2018 .
^ "Кольскую АЭС-2 начнут строить в 2028 году" . Retrieved 9 December 2023 .
^ "Kursk's second unit retires after 45 years operation" . Retrieved 31 January 2024 .
^ "Запуск первого энергоблока Курской АЭС-2 планируется в декабре 2024" . Ixbt.com .
^ "The construction of the 2nd innovative VVER-TOI power block at the Kursk NPP-2 site has started ahead of schedule" . rosenergoatom.ru . Retrieved 16 April 2019 .
^ "Russia retires Leningrad unit 1" . World Nuclear News . World Nuclear Association. Retrieved 27 December 2018 .
^ "Four New NPP Units Will be Built in Russia" .
^ "Ленинградской атомной станции добавят мощности" . 15 March 2024.
^ "Russia commits to further floating NPPs : New Nuclear – World Nuclear News" . world-nuclear-news.org . Retrieved 28 July 2021 .
^ " "Росатом" и Kaz Minerals предварительно договорились о поставках электроэнергии для Баимского ГОКа" . Interfax.ru (in Russian). Retrieved 3 September 2021 .
^ "Russia plans new generation of FNPPS – Nuclear Engineering International" . 6 January 2021.
^ a b "Заложен корпус первого плавучего энергоблока в арктическом исполнении на базе реакторов РИТМ-200 – Атомэнергомаш" . aem-group.ru . Archived from the original on 30 August 2022. Retrieved 30 August 2022 .
^ "В Якутии собираются строить АЭС мощностью не менее 55 МВт" .
^ " "Росатом" начал строительство реактора Брест-300 в Северске" . 8 June 2021.
^ "Russia prepares to build new nuclear reactors at Leningrad and Smolensk – Nuclear Engineering International" . 26 June 2020.
^ "VVER units planned for Leningrad and Smolensk" .
^ Shut down after a 1977 refuelling incident; decommission in progress since 1979
^ "Tlačová agentúra Slovenskej republiky – TASR.sk" . tasr.sk . Archived from the original on 20 January 2009.
^ "Power commissioning of Mochovce 3 completed" .
^ "Krško gets an overhaul : Corporate – World Nuclear News" .
^ "Drugi blok NE Krško prve megavate mogao bi dati nakon 2030" [The second block of NPP Krško could provide the first megawatts after 2030.]. Točka na I (in Croatian). 30 November 2022. Retrieved 14 April 2023 .
^ "South Korean APR-1400 starts Opened : New Nuclear - World Nuclear News" .
^ "Unit 2 at South Korean nuclear reactor enters commercial operation" . 9 April 2024.
^ a b "South Korea breaks ground for two new reactors" . Retrieved 30 October 2024 .
^ "Second APR-1400 unit starts Opened" . world-nuclear-news.org . Retrieved 3 September 2019 .
^ a b "Marvikenreaktorn - ett industripolitiskt utvecklingsprojekt i otakt med tiden" . The Swedish Radiation Safety Authority (in Swedish). 31 March 2007. Retrieved 12 January 2023 .
^ a b c d e f g h i j k l m n o p "IAEA Sweden reactors" . IAEA . 11 January 2023. Retrieved 12 January 2023 .
^ a b c "Forsmarks reaktorer i siffror" (PDF) . Vattenfall (in Swedish). April 2016. Retrieved 12 January 2023 .
^ "MILSTOLPAR I VÅR HISTORIA" . Westinghouse (in Swedish). Retrieved 12 January 2023 .
^ "Ringhals 1 inne på slutspurten" . SVT (in Swedish). 26 October 2020. Retrieved 29 December 2020 .
^ admin.ch, The Federal Authorities, Federal Council decides to gradually phase out nuclear energy as part of its new energy strategy Archived 20 June 2013 at the Wayback Machine , 25 May 2011
^ "Early shutdown for Taiwanese reactor : Corporate" . World Nuclear News. 1 July 2021. Retrieved 29 April 2022 .
^ a b "封存核四 馬英九:為下一代保留選擇權" . 自由時報電子報 (in Chinese (Taiwan)). 27 April 2014. Retrieved 8 November 2024 . 馬英九總統、閣揆江宜樺下午邀集黨籍縣市首長舉行會議,會後國民黨發言人范姜泰基轉述,今日會議達成兩點共識,分別是「核四一號機不施工、只安檢,安檢後封存;核四二號機全部停工」,以及「行政院承諾儘速召開全國能源會議,以確保未來供電無虞」。
^ "Major components in place at Akkuyu 1 : New Nuclear" . World Nuclear News. 4 March 2022. Retrieved 29 April 2022 .
^ "Construction begins of fourth Turkish reactor : New Nuclear – World Nuclear News" .
^ "Japan looks to cancel Turkish project – Nuclear Engineering International" . 6 December 2018.
^ "Turkey, Japan scrap partnership in Sinop nuclear plant in Turkey's north – Turkey News" . 20 January 2020.
^ "В Україні збудують нову атомну станцію: названо місто будівництва" . GSMinfo . 22 September 2022. Retrieved 9 December 2023 .
^ "На Хмельницькій АЕС відбулася нарада з питань будівництва 3 та 4 енергоблоків" . xaec.org.ua . 12 February 2021. Archived from the original on 24 February 2021. Retrieved 7 November 2022 .
^ "Ukraine begins construction of new units at Khmelnitsky NPP" . 17 April 2024.
^ a b c "Is it sensible to invest in the construction of new nuclear reactors during post-war reconstruction? – Ecoclub Rivne is an environmental NGO" .
^ "UAE's first nuclear power plant begins Openeds" . Reuters . 6 April 2021. Retrieved 6 April 2021 .
^ "Barakah / Unit 2 Begins Opened at Arab World's First Nuclear Station :: NucNet | the Independent Nuclear News Agency" . 23 February 2022.
^ "Third Barakah unit begins Opened : New Nuclear - World Nuclear News" .
^ "UAE Celebrates Historic Milestone as Unit 4 of the Barakah Plant Commences Commercial Operation: Delivering Full-fleet Operations" . 5 September 2024.
^ a b c d e f g h Ambrose, Jillian (4 December 2024). "Four of UK's oldest nuclear plants to run for even longer as Hinkley Point delayed" . Retrieved 4 December 2024 .
^ "Hinkley Point B enters retirement : Corporate – World Nuclear News" . world-nuclear-news.org . Retrieved 2 August 2022 .
^ "PRIS – Reactor Details" . pris.iaea.org . Retrieved 25 July 2022 .
^ "Hunterston B nuclear power station retires after 46 years in service" . The Guardian . 7 January 2022.
^ "The Sizewell C project – National Infrastructure Planning" . infrastructure.planninginspectorate.gov.uk . Retrieved 12 April 2022 .
^ "PRIS – Reactor Details" . pris.iaea.org . Retrieved 24 January 2019 .
^ "PRIS – Reactor Details" . iaea.org . Retrieved 11 May 2018 .
^ "PRIS – Reactor Details" . iaea.org . Retrieved 11 May 2018 .
^ "PRIS – Reactor Details" . iaea.org . Retrieved 11 May 2018 .
^ "Brunswick-1" . IAEA. Retrieved 14 April 2013 .
^ "Brunswick-2" . IAEA. Retrieved 14 April 2013 .
^ "Scaled down SMR pilot project remains on course : New Nuclear" . World Nuclear News. 23 July 2021. Retrieved 29 April 2022 .
^ "Idaho SMR project terminated" . World Nuclear News . 9 November 2023. Retrieved 9 November 2023 .
^ a b c d "TVA Prepares to Write Final Nuclear Chapters" . American Nuclear Society . 17 April 2015. Archived from the original on 29 July 2023. Retrieved 5 October 2023 .
^ a b c d e f g h Tennessee Valley Authority . "Hartsville Nuclear Plant Site, Transfer of TVA Property For Industrial Park" (PDF) . Archived from the original (PDF) on 5 January 2009. Retrieved 5 October 2023 .
^ a b "Entergy's Indian Point Unit 2 to Shut Down Permanently" . Indian Point Energy Center . 29 April 2020. Archived from the original on 3 August 2020. Retrieved 30 April 2020 .
^ "PRIS – Reactor Details" .
^ StarTribune.com, WILSON RING Vermont Yankee nuclear power plant ends operations after 42 years of producing electricity Archived 29 December 2014 at the Wayback Machine , 29 Dec 2014
^ "Vogtle Unit 3 goes into operation" . Cision. 31 July 2023. Retrieved 31 July 2023 .
^ "Commercial operation marks completion of Vogtle expansion : New Nuclear - World Nuclear News" .