The plant is located about 54 kilometres from the border with Vietnam. It is a project of Guangxi Fangchenggang Nuclear Power Group, a joint venture between China Guangdong Nuclear Power Co (CGNPC) and Guangxi Investment Group.[3]
Unit 1 was connected to the electricity grid on 25 October 2015.[4] Unit 1 is commercially operating starting on 1 January 2016.
[5]
Construction works for Unit 3 started in December 2015.[6] Unit 3 first concrete pour occurred on 24 December 2015.[7]
First concrete for Unit 4 followed one year later, on 23 December 2016.[8]
Reactor data
The Fangchenggang Nuclear Power Plant consist of 4 operational reactors and 2 reactors planned.