Nuclear power share of total electricity in China (%)[6][1][2]
China is one of the world's largest producers of nuclear power. The country ranks third in the world both in total nuclear power capacity installed and electricity generated, accounting for around one tenth of global nuclear power generated. As of February 2023, China has 55 plants with 57GW in operation, 22 under construction with 24 GW and more than 70 planned with 88GW. About 5% of electricity in the country is due to nuclear energy.[7]
These plants generated 417 TWh of electricity in 2022
[8] This is versus the September 2022 numbers of 53 nuclear reactors, with a total capacity of 55.6 gigawatt (GW).[9] In 2019, nuclear power had contributed 4.9% of the total Chinese electricity production, with 348.1 TWh.[2]
Nuclear power has been looked into as an alternative to coal due to increasing concerns about air quality, climate change and fossil fuel shortages.[10][11]
The China General Nuclear Power Group has articulated the goal of 200 GW by 2035, produced by 150 additional reactors.[12][13]
China aims to maximize self-reliance on nuclear reactor technology manufacturing and design, although international cooperation and technology transfer are also encouraged.
Advanced pressurized water reactors such as the Hualong One are the mainstream technology in the near future, and the Hualong One is also planned to be exported.[15][16] China plans to build as many as thirty nuclear power reactors in countries involved in the Belt and Road Initiative by 2030.[17][18][19]
By mid-century fast neutron reactors are seen as the main technology, with a planned 1400 GW capacity by 2100.[20][21][22]
China is also involved in the development of nuclear fusion reactors through its participation in the ITER project, having constructed an experimental nuclear fusion reactor known as EAST located in Hefei,[23] as well as research and development into the thorium fuel cycle as a potential alternative means of nuclear fission.[24]
History
This section needs expansion. You can help by adding to it. (July 2010)
1950–1958
In the Cold War, the initial motivation of developing nuclear power for Beijing was largely due to security purposes.[25] Between 1950 and 1958, Chinese nuclear power construction heavily relied on cooperation with the USSR.[26] The first initiative was launched with the establishment of the China-Soviet Union Nonferrous Metals and Rare Metals Corporation and the first central atomic research facility, the Institute of Atomic Energy of the Chinese Academy of Sciences in Beijing.[27] In February 1955, a chemical separation plant for the production of weapons-grade U-235 and plutonium was created with Soviet aid in Xinjiang and in April the Changchun Institute of Atomic Energy was established.[26] Several months later, on 29 April 1955, the Sino-Soviet Atomic Cooperation Treaty was signed.[28]
The China National Nuclear Corporation (CNNC) was also established in 1955.
In addition to the cooperation with the USSR, China has started to learn nuclear technology by sending students to the USSR.[26] In December 1958, nuclear power development had become the top priority project in the Draft Twelve Year Plan for Development of Science and Technology.[26]
1959–1963
The second phase is characterized by the aim of having completely self-sufficient in nuclear power development.[26] In June 1959, the USSR officially ended any forms of nuclear aid to China, withdrawing Soviet technicians.[29] China suffered but continued nuclear power development by massive research and input. In order to rapidly strengthen its atomic energy industry, the Central Committee decided that China must dedicate further resources exclusively to nuclear-related activities.[30] Consequently, the Institute of Atomic Energy created branch institutes of research organizations in every province, major city, and autonomous region.[26] By the end of 1963, China has built more than forty chemical separation plants for the extraction of uranium and thorium.[26] In the year between 1961 and 1962, China accomplished significant achievements in nuclear development which consolidates future applications. From 1959 to 1963, a gaseous diffusion plant utilizing a large 300 MW reactor was under construction at Lanzhou.[31] It was estimated that the Chinese invested over $1.5 billion in the construction of this plant.[26]
1964 – present
After the explosive progress in the 1950s, Chinese nuclear development slowed down possibly because of Cultural Revolution so only one nuclear test took place in 1970.[26]
On 8 February 1970, China issued its first nuclear power plan, and the 728 Institute (now called Shanghai Nuclear Engineering Research and Design Institute)[32] was founded.
The first independently designed and built nuclear power plant, Qinshan Nuclear Power Plant, was constructed in 1984 and successfully connected to the grid on 15 December 1991.[33][34] The reactor is of type CNP-300.[citation needed]
Along with Chinese economic reform, China continued to demand expansion of its electricity sectors.[35] As part of China's tenth Five-Year Plan (2001–2005), a key part of energy policy was to "guarantee energy security, optimize energy mix, improve energy efficiency, protect the ecological environment.”[35] By 2002, China had two nuclear power plants operational.[36]: 197
In 2012, Hu Jintao emphasized "the irreplaceable role of nuclear energy in ensuring energy security and climate change".[36]: 201
The nuclear safety plan of 2013 stated that beyond 2016 only Generation III plants would be started, and until then only a very few Generation II+ plants would be started.[37]
In 2014, China still planned to have 58 GW of capacity by 2020.[38] However, due to reevaluation following the Fukushima Daiichi nuclear disaster in Japan, few plants commenced construction from 2015, and this target was not met.[39]
In 2019, China had a new target of 200 GWe of nuclear generating capacity by 2035, which is 7.7% out of predicted total electricity generating capacity of 2600 GWe.[2]
By the end of December 2020, the total number of nuclear power units in operation on the Chinese mainland reached 49, with a total installed capacity of 51 GWe, ranking third in the world in terms of installed capacity and second in the world in terms of power generation in 2020; with 16 nuclear power units under construction, the number of units under construction and installed capacity have ranked first in the world for many years.[33] By 2035, nuclear power is planned to account for 10% of electricity generation.[40]
Annual installed net nuclear power capacity in China (2014-2023)[41]
Year
gigawatts
2014
19.0
2015
26.8
2016
31.4
2017
34.5
2018
42.8
2019
45.5
2020
47.5
2021
50.0
2022
52.1
2023
53.2
Also as of 2020, China had 41 additional nuclear reactors planned and 168 proposed reactors under consideration.[36]: 197 China's under construction reactors accounted for 27% of worldwide reactors under construction.[36]: 197 As of at least 2023, China's goals for nuclear power expansion are the most ambitious of any country.[36]: 197
China has requested and hosted 12 Operational Safety Review Team (OSART) missions from IAEA teams to October 2011, and each plant generally has one external safety review each year, either OSART, WANO peer review, or CNEA peer review (with the Research Institute for Nuclear Power Operations).[44]
Following the Fukushima Daiichi nuclear disaster in Japan, China announced on 16 March 2011, that all nuclear plant approvals were being frozen, and that 'full safety checks' of existing reactors would be made.[45][46] Although Zhang Lijun, Vice Minister of Environmental Protection, has indicated that China's overall nuclear energy strategy would continue,[46] some commentators have suggested that additional safety-related costs and public opinion could cause a rethink in favor of an expanded renewable energy program.[46][47]
China's current methods for storing spent nuclear fuel (SNF) are only sustainable until the mid-2020s, and a policy to handle SNF needs to be developed.[48]
In 2017, new laws strengthened the powers of the National Nuclear Safety Administration, creating new "institutional mechanisms", a clearer "division of labour" and more disclosure of information.[49]
IAEA Director General Rafael Grossi made his first official visit in May 2023, signing several agreements with China's nuclear regulator, the China Atomic Energy Authority. Grossi said "China is one of the IAEA’s most important partners and a global leader in nuclear energy".[40]
Russia's Atomstroyexport was general contractor and equipment provider for the Tianwan AES-91 power plants using the V-428 version of the well-proven VVER-1000 reactor of 1060 MWe capacity, with construction started in 1999. Two further Tianwan units started in 2012 use the same version of the VVER-1000 reactor.
In 2007, negotiations started with the French company Areva concerning the EPR third generation reactors. Two Areva 1660 MWe EPR reactors were built at Taishan, with construction started in 2009.
AP1000
The Westinghouse AP1000 was planned to be the main basis of China's move to Generation III technology.
In July 2018, the first of four AP1000 reactors was connected to the grid.[52]
Following Westinghouse's bankruptcy in 2017, it was decided in 2019 to build the Hualong One rather than the AP1000 at Zhangzhou.[53]
The CNP series of Generation II reactors started with the CNP-300 pressurized water reactor, was the first reactor design developed domestically in China. The first unit began operation at Qinshan Nuclear Power Plant in 1991.
A three loop, 1000-MW version of the CNP reactor, the CNP-1000, was under development since the 1990s with the help of vendors Westinghouse and Framatome (now AREVA). 4 units of the CNP-1000 were later built at Fuqing NPP. Further work on the CNP-1000 was stopped in favour of the ACP-1000.
In 2013, China announced that it had independently developed the Generation III ACP-1000, with Chinese authorities claiming full intellectual property rights over the design. As a result of the success of the Hualong One project, no ACP-1000 reactors have been built to date. CNNC had originally planned to use the ACP-1000 in Fuqing reactor 5 and 6 but switched over to the Hualong One.[57]
The CPR-1000 was a Generation II reactor developed by China General Nuclear Power Group (CGN). It is the most numerous reactor type in China, with 22 units operational. This reactor type is a Chinese development of the French 900 MWe three cooling loop design imported in the 1990s, with most of the components now built in China. Intellectual property rights are retained by Areva, which affects CPR-1000 overseas sales potential.[10]
China's first CPR-1000 nuclear power plant, Ling Ao-3, was connected to the grid on 15 July 2010.[58]
The design has been progressively built with increasing levels of Chinese components.
Shu Guogang, GM of China Guangdong Nuclear Power Project said, "We built 55 percent of Ling Ao Phase 2, 70 percent of Hongyanhe, 80 percent of Ningde and 90 percent of Yangjiang Station."[citation needed]
In 2010, the China Guangdong Nuclear Power Corporation announced the ACPR1000 design, a further design evolution of the CPR-1000 to a Generation III level, which would also replace intellectual property right limited components.
CGNPC aimed to be able to independently market the ACPR1000 for export by 2013.[59]
A number of ACPR1000 are under construction in China, but for export this design was superseded by the Hualong One.
Since 2011, CNNC has been progressively merging its ACP-1000 nuclear power station design[citation needed] with the CGNACPR-1000 design, while allowing some differences, under direction of the Chinese nuclear regulator. Both are three-loop designs originally based on the same French M310 design used in Daya Bay with 157 fuel assemblies, but went through different development processes (CNNC's ACP-1000 has a more domestic design with 177 fuel assemblies while CGN's ACPR-1000 is a closer copy with 157 fuel assemblies).[44] In early 2014, it was announced that the merged design was moving from preliminary design to detailed design. Power output will be 1150 MWe, with a 60-year design life, and would use a combination of passive and active safety systems with a double containment. CNNC's 177 fuel assembly design was retained.
After the merger, both companies retain their own supply chain and their versions of the Hualong One will differ slightly (units built by CGN will retain some features from the ACPR1000) but the design is considered to be standardised. Some 85% of its components will be made domestically.[61]
The Hualong One power output will be 1170 MWe gross, 1090 MWe net, with a 60-year design life, and would use a combination of passive and active safety systems with a double containment.[60] It has a 177 assembly core design with an 18-month refuelling cycle. The power plant's utilisation rate is as high as 90%. CNNC has said its active and passive safety systems, double-layer containment and other technologies meet the highest international safety standards.[62]
The Hualong One is now largely seen as the replacement for all previous Chinese nuclear reactor designs, and has been exported overseas.
Hualong Two
CNNC plans to start building a follow-on version, named Hualong Two, by 2024. It will be a more economical version using similar technology, reducing build time from 5 years to 4, and reducing costs by around a fourth from 17,000 yuan per kW to 13,000 yuan per kW.[63][64]
In September 2020, China's State Power Investment Corporation launched a design based on the Westinghouse AP1000 for more widespread deployment consideration. It was given the name Guohe One.[65]
As of 2023[update], the construction of six CAP1000 are permitted by the State Council, Haiyang 3 & 4, Lianjiang 1 & 2, and Sanmen 3 & 4.[66][67] Officially construction of Sanmen 3 started in June 2022, and of Haiyang 3 in July 2022.
Generation IV reactors
China is developing several generation IV reactor designs.
The HTR-PM, a HTGR, is under construction. The HTR-PM is a descendant of the AVR reactor, and it is partly based on the earlier Chinese HTR-10 reactor.
A sodium-cooled fast reactor, the CFR-600, is also under construction.
ACP100 small modular reactor
In July 2019, China National Nuclear Corporation announced it would start building a demonstration ACP100 small modular reactor (SMR) on the north-west side of the existing Changjiang Nuclear Power Plant by the end of the year.[68] Design of the ACP100 started in 2010 and it was the first SMR project to pass an independent safety assessment by International Atomic Energy Agency in 2016. It is also referred to as Linglong One and is a fully integrated reactor module with an internal coolant system, with a 2-year refuelling interval, producing 385 MWt and about 125 MWe, and incorporates passive safety features, and can be installed underground.[69][70]
Nuclear power plants in China (view) Active plants Under construction plants Firmly planned plants
Most nuclear power plants in China are located on the coast and generally use seawater for cooling a direct once-through cycle. The New York Times has reported that China is placing many of its nuclear plants near large cities, and there is a concern that tens of millions of people could be exposed to radiation in the event of an accident.[14]
China's neighboring Daya Bay and Lingao nuclear plants have around 28 million people within a 75-kilometre radius that covers Hong Kong.[71]
Future projects
Following the Fukushima accident and consequent pause in approvals for new plants, the target adopted by the State Council in October 2012 became 60 GWe by 2020, with 30 GWe under construction. In 2015, the target for nuclear capacity on line in 2030 was 150 GWe, providing almost 10% of electricity, and 240 GWe in 2050 providing 15%.
However, from 2016 to 2018, there was a further hiatus in the new build programme, with no new approvals for at least two years, causing the programme to slow sharply. Delays in the Chinese builds of AP1000 and EPR reactors, together with the bankruptcy in the U.S. of Westinghouse, the designer of the AP1000, have created uncertainties about the future direction. Also, some regions of China now have excess generation capacity, and it has become less certain to what extent electricity prices can economically sustain nuclear new build while the Chinese government is gradually liberalising the generation sector.[72][73]
In 2018, a Nuclear Engineering International journal analysis suggests a below-plan capacity of 90 GWe is plausible for 2030.[74]
As of 2023[update], China had 52 GW of operational nuclear power, with 21 GW under construction (see Table below)
Bloomberg News reported that the 2020 National People's Congress supported future building of 6 to 8 reactors a year, which Bloomberg considered likely to be dominated by the domestic Hualong One design.[75] In 2019, China had a new target of 200 GWe of nuclear generating capacity by 2035, which is 7.7% out of predicted total electricity generating capacity of 2600 GWe.[2]
The role of the IPPs
The first major successful profitable commercial project was the Daya Bay Nuclear Plant, which is 25% owned by CLP Group of Hong Kong and exports 70% of its electricity to Hong Kong. Such imports supply 20% of Hong Kong's electricity.
In order to access the capital needed to meet the 2020 target of 80GW, China has begun to grant equity in nuclear projects to China's Big Five power corporations:
Like the two nuclear companies China National Nuclear Corporation and China Guangdong Nuclear Power Group (CGNPG) the Big Five are State-owned "Central Enterprises" (中央企业) administered by SASAC. However, unlike the two nuclear companies, they have listed subsidiaries in Hong Kong and a broad portfolio of thermal, hydro and wind.
Where multiple reactors are operational/under construction/planned at a given site, the capacity given is to be understood for all reactors at this site applicable to the given column, not a per reactor figure.
Fuel cycle
This section needs expansion. You can help by adding to it. (July 2018)
China is evaluating the construction of a high level waste (HLW) repository in the Gobi Desert, probably constructed near Beishan starting around 2041.[78]
China General Nuclear Power Group was founded in 1994 as the China Guangdong Nuclear Power Group and changed to its current name in 2013.[36]: 202 It is also supervised by SASAC.[36]: 202 Its headquarters are in Shenzhen.[36]: 202 As of 2017, China General Nuclear Power Group manages 20 reactors.[36]: 202
China experienced civil protest over its ambitious plans to build more nuclear power plants following the Fukushima nuclear disaster. There has been "inter-provincial squabble" over a nuclear power plant being built near the southern bank of the Yangtze River. The plant in the centre of the controversy is located in Pengze county in Jiangxi and across the river the government of Wangjiang county in Anhui wants the project shelved.[91]
More than 1,000 people protested in Jiangmen City Hall in July 2013 to demand authorities abandon a planned uranium-processing facility that was designed as a major supplier to nuclear power stations. The Heshan Nuclear Power Industry Park was to be equipped with facilities for uranium conversion and enrichment as well as the manufacturing of fuel pellets, rods and finished assemblies. Protesters feared the plant would adversely affect their health, and the health of future generations. As the weekend protest continued, Chinese officials announced the state-run project's cancellation.[92]
By 2014, concerns about public opposition caused Chinese regulators to develop public and media support programmes, and developers to begin outreach programmes including site tours and visitor centres.[93]
In 2020, Bloomberg News reported that public opposition had stopped nuclear power construction on inland river sites, and caused the cancellation of a nuclear fuel plant in Guangdong in 2013.[75]
^Tony Vince (8 March 2013). "Rock solid ambitions". Nuclear Engineering International. Archived from the original on 26 January 2016. Retrieved 9 March 2013.
Hamtramck, MichiganKotaCity of HamtramckPusat kota Hamtramck pada 2012Julukan: The World in Two Square Miles(Dunia dalam Dua Mil Persegi)Lokasi di Wayne CountyHamtramckLokasi di Amerika SerikatKoordinat: 42°23′52″N 83°03′26″W / 42.39778°N 83.05722°W / 42.39778; -83.05722Koordinat: 42°23′52″N 83°03′26″W / 42.39778°N 83.05722°W / 42.39778; -83.05722Negara Amerika SerikatNegara bagian MichiganCounty WayneDidir...
Chrome OSsistema operativoLogoSviluppatoreGoogle LLC FamigliaGentoo Linux (GNU/Linux) Release iniziale0.11.241[1] (15 giugno 2011[2]) Release corrente119.0.6045.214[3] (26 dicembre 2023; 3 mesi fa) Tipo di kernelLinux (monolitico) Piattaforme supportatex86, ARM Interfacce graficheGrafico (web-based) LicenzaGoogle Chrome OS Terms of Service[4] Stadio di sviluppoStabile[1] Sito webwww.google.com/chromebook/chrome-os/ Modifica dati su Wikid...
Félix Guattari Makam Guattari di Pemakaman Père-Lachaise, Paris (divisi 42) Félix Guattari, lahir 30 Maret 1930[1] · [2] di Villeneuve-les-Sablons (Oise) dan meninggal 29 Agustus 1992 di Klinik La Borde, Cour-Cheverny (Loir-et-Cher), merupakan seorang psikoanalisa dan filsuf Prancis.[3] Dekat dengan Jean Oury dan saudaranya Fernand, Félix Guattari bekerja sepanjang hidupnya di klinik La Borde, pusat utama psikoterapi institusional. Dia mengikuti seminar J...
Billy RayLahirWilliam RayAmerika SerikatPekerjaanSutradara, penulis latarSuami/istriStacy Sherman William Billy Ray adalah seorang penulis latar dan sutradara Amerika. Ia mulai menulis untuk televisi dan film pada 1994 dengan Color of Night.[1] Ia telah menulis sejumlah film termasuk Volcano[2] dan Hart's War.[3] Ia adalah salah satu pembuat dan penulis acara fiksi ilmiah Earth 2. Pada 10 Agustus 2015, media mengumumkan bahwa ia akan menulis permainan latar yang Marti...
Roman Catholic cathedral in Broken Hill, Australia Sacred Heart Cathedral, Broken HillReligionAffiliationRoman Catholic Latin RiteDistrictDiocese of Wilcannia-ForbesEcclesiastical or organizational statusCathedral[1]LeadershipColumba Macbeth-Green OSPPEYear consecrated2 July 1905LocationLocationBroken Hill, AustraliaGeographic coordinates31°57′12″S 141°27′30″E / 31.953317697478543°S 141.45827948681668°E / -31.953317697478543; 141.45827948681668Archi...
2007 studio album by The ViewHats Off to the BuskersStudio album by The ViewReleased22 January 2007 (2007-01-22)Recorded2006Genre Indie rock indie pop Length40:45Label1965 RecordsProducer The View Owen Morris The View chronology The View EP(2006) Hats Off to the Buskers(2007) Which Bitch?(2009) Singles from Hats Off to the Buskers Wasted Little DJsReleased: 8 August 2006 Superstar TradesmanReleased: 23 October 2006 Same JeansReleased: 15 January 2007 The Don / Skag Tre...
Разрушения после цунами в Японии в 2011 году Извержение Пинатубо в 1991 году Стихи́йное бе́дствие — разрушительное природное и (или) природно-антропогенное явление или процесс, в результате которого может возникнуть или возникла угроза жизни и здоровью людей, может прои�...
This article exceeds Wikipedia's template size limit. Some references and templates may not render properly on this page. (January 2024) See also: List of historic places in the Greater Vancouver Regional District; List of historic places in New Westminster; List of historic places in Greater Vancouver North Shore; and List of historic places in Surrey, British Columbia Map all coordinates using OpenStreetMap Download coordinates as: KML GPX (all coordinates) GPX (primary coordinates) GPX (s...
Australian pathologist (1898–1968) The Right HonourableThe Lord FloreyOM FRS FRCPPortrait by Julian Smith, 1930sBornHoward Walter Florey(1898-09-24)24 September 1898Adelaide, South AustraliaDied21 February 1968(1968-02-21) (aged 69)Oxford, EnglandEducationScotch College, AdelaideSt Peter's College, AdelaideAlma materUniversity of AdelaideMagdalen College, OxfordGonville and Caius College, CambridgeKnown forDiscovery of penicillinSpouses Mary Ethel Florey &...
American publishing company 44°56′29″N 93°4′28″W / 44.94139°N 93.07444°W / 44.94139; -93.07444 Brown & BigelowFounded1896; 128 years ago (1896)Country of originUnited StatesHeadquarters location1355 Mendota Heights Road, Suite 290, Mendota Heights MN 55120Official websitewww.brownandbigelow.com Brown & Bigelow is a company based in Saint Paul, Minnesota, that sells branded apparel and promotional merchandise. History A Friend in Ne...
Body of rules spanning public and private international law International labour law is the body of rules spanning public and private international law which concern the rights and duties of employees, employers, trade unions and governments in regulating Work (human activity) and the workplace. The International Labour Organization and the World Trade Organization have been the main international bodies involved in reforming labour markets. The International Monetary Fund and the World Bank ...
FalisciIl territorio dei Falisci con i centri di Falerii, Nepete e Sutrium SottogruppiEtruria meridionale Luogo d'origineAger Faliscus PeriodoDal X al III secolo a.C. PopolazioneFalisci LinguaFalisco ReligioneReligione falisca Distribuzione LazioFalisci Manuale I Falisci, in senso stretto abitanti di Falerii, corrispondente alla moderna Civita Castellana, è il nome con cui i Romani indicavano un antico popolo dell'Etruria meridionale.[1] Indice 1 Etimologia 2 Storia 2...
Coppa Italia Serie D 2005-2006 Competizione Coppa Italia Serie D Sport Calcio Edizione 7ª Organizzatore FIGC Date dal 28 agosto 2005al 26 aprile 2006 Luogo Italia Partecipanti 164 Risultati Vincitore Sorrento(1º titolo) Secondo Giarre Semi-finalisti Voghera Cervia Statistiche Incontri disputati 355 Gol segnati 374 (1,05 per incontro) Cronologia della competizione 2004-2005 2006-2007 Manuale La Coppa Italia Serie D di calcio 2005-2006, settima edizi...
Amleto NovelliLahir(1885-10-18)18 Oktober 1885Bologna, ItaliaMeninggal16 April 1924(1924-04-16) (umur 38)Torino, ItaliaPekerjaanPemeranTahun aktif1909-1924 Amleto Novelli (18 Oktober 1885 – 16 April 1924) adalah seorang pemeran film Italia pada era film bisu.[1] Ia tampil dalam 110 film antara 1909 dan 1924. Filmografi pilihan Brutus (1911) Agrippina (1911) Quo Vadis (1913) Antony and Cleopatra (1913) Julius Caesar (1914) The Wedding March (1915) Avatar (191...
بوندسليغا الموسم 1990–91 البلد ألمانيا المنظم الاتحاد الألماني لكرة القدم النسخة 28 عدد الفرق 18 الفائز كايزرسلاوترن الوصيف نادي كايزرسلاوترن الفرق الهابطة سانت باولي باير أويردينغن هيرتا برلين دوري أبطال أوروبا كايزرسلاوترن كأس الكؤوس الأوروبية فيردر بريمن كأس �...
2014 Philippines-United States agreement Enhanced Defense Cooperation AgreementAgreement Between the Republic of the Philippines and The Government of the United States on Enhanced Defense CooperationSignedApril 28, 2014 (2014-04-28)LocationManila, PhilippinesParties Philippines United StatesLanguageEnglish The Enhanced Defense Cooperation Agreement (EDCA) is an agreement between the United States and the Philippines intended to bolster the American–Philippine allia...
Group of flowering plants Hypericum sect. Arthrophyllum Hypericum rupestre, the type species of the section Scientific classification Kingdom: Plantae Clade: Tracheophytes Clade: Angiosperms Clade: Eudicots Clade: Rosids Order: Malpighiales Family: Hypericaceae Genus: Hypericum Section: Hypericum sect. ArthrophyllumJaub. & Spach Type species Hypericum rupestreJaub. & Spach Species H. cardiophyllum Boiss. Hypericum nanum Poir. Hypericum pamphylicum N. Robson & P.H.Davis Hypericum r...