Winston Churchill station

Winston Churchill
 
Aerial view of Winston Churchill station
General information
Location4310 Winston Churchill Boulevard
Mississauga, Ontario
Canada
Coordinates43°32′36″N 79°42′44″W / 43.54333°N 79.71222°W / 43.54333; -79.71222
Owned byMetrolinx
PlatformsSide platforms
Bus routes
MiWay buses
  •  36  Ridgeway
  •  45  Winston Churchill
  •  45A  Winston Churchill
  •  109  Meadowvale Express
  •  25  Waterloo/Mississauga
  •  25L  Waterloo/Mississauga
  •  29  Guelph/Mississauga
Bus operatorsGO Transit
MiWay
Construction
Parking300 park and ride spaces
Bicycle facilitiesShelters
AccessibleYes
Other information
Station codeGO Transit: 02635
Fare zone21
History
OpenedDecember 31, 2016 (2016-12-31)
Services
Preceding station Metrolinx Following station
Terminus Mississauga Transitway Erin Mills
toward Renforth

Winston Churchill is a bus station in the community of Erin Mills in western Mississauga, Ontario, Canada. It is located northwest of the Winston Churchill Boulevard / Highway 403 interchange and is the western terminus of the Mississauga Transitway.[1]

Metrolinx began construction of the Mississauga Transitway West between Winston Churchill Boulevard and Erin Mills Parkway[2] in October 2013 and was completed on December 31, 2016.[3]

Bus service

GO Transit

  • 25, 25L Waterloo/Mississauga
  • 29 Guelph/Mississauga

MiWay

  • 36 Ridgeway
  • 45 Winston Churchill
  • 45A Winston Churchill
  • 109 Meadowvale Express

References

  1. ^ "Mississauga Transitway Project". GO Transit. Archived from the original on 21 August 2014. Retrieved 30 November 2014. To accommodate increased demand, improve your experience and our operations, GO Transit will be constructing a new GO Bus Station at Winston Churchill Boulevard. Construction of the new station started in 2013. The station is expected to be operational in 2016.
  2. ^ Robert Mackenzie (December 12, 2013). "Construction starts on west section of Mississauga Transitway". Transit Toronto. Retrieved 30 November 2014. Metrolinx is building the west segment between Winston Churchill and Erin Mills.
  3. ^ "Mississauga Transitway West" (PDF). Mississauga Transitway Project: Project Status. Metrolinx. Retrieved 30 November 2014. In October 2013, Metrolinx started construction on the Mississauga Transitway West (Winston Churchill Boulevard to Erin Mills Parkway).