A Richmond Hill commuter train service had been announced in 1969 by the provincial government, but its implementation was cancelled in 1970 in favour of bus commuter service.[2]
Following a promotional opening on Saturday April 29, the Richmond Hill line became the fourth GO Transit rail line on Monday, May 1, 1978. The opening had been delayed because the BiLevel coaches ordered for the Lakeshore line were not delivered on time, so existing Lakeshore line trains were not available to be redeployed on the Richmond Hill line.[3]
The layout of the line remained generally unchanged until the 2010s, when the line was extended as part of the GO 2020 strategy, which aimed to extend the line north to Aurora Road in Whitchurch-Stouffville.[4][5] The line was first extended north to Gormley in late 2016, with a new train layover facility at Bethesda Road.[5] It was extended further north to Bloomington Road in June 2021.[6][7]
Route
The Richmond Hill line operates over the CN Bala Subdivision, which is owned by Metrolinx between Union Station and Doncaster Diamond, where the line crosses the CN York Subdivision. North of Doncaster Diamond, the line is owned by Canadian National and is part of its transcontinental freight route.
The Via RailCanadian transcontinental service from Vancouver to Toronto operates along the entire route of the Richmond Hill line, but does not stop at any stations other than Union.[8]
During regular service, the Richmond Hill line operates trains that are six to ten coaches long. During the COVID-19 pandemic, GO Transit reduced the number of coaches on all Richmond Hill line trains from six to four cars due to diminished ridership.[9]
As a part of the GO Transit Regional Express Rail (RER) initiative, train service along the Richmond Hill line is planned to be expanded over the next decade. During peak hours, trains would run in peak direction every 15–30 minutes along this line.[11] To implement the planned RER service, the Richmond Hill line would need $1 billion in flood mitigation and a grade separation at the Doncaster junction with the York Subdivision.[8]
A layover facility was planned in the Don Valley adjacent to the Don Valley Parkway underneath the Prince Edward Viaduct as part of the GO Expansion program. In March 2023, Metrolinx found a different site for the planned facility in a light industrial zone at York Mills Road east of Leslie Street.[12]GO Transit will use the Rosedale Siding adjacent to Bayview Avenue along the route as a temporary layover facility.[12]