The Litang–Zhanjiang railway was planned from 1952 to 1953 and built from September 25, 1954 to July 1, 1955.[1] A 61 km (38 mi) spur line from the Hechun Station to Maoming was completed in 1959 and now connects the Lizhan Line with the Guangzhou–Maoming railway. From 2005 to 2009, the southernmost section of the Lizhan Line from Hechun Station to Zhanjiang, 62.7 km (39 mi) in length, was double-tracked and electrified to accommodate trains running at speeds of up to 140 km (87 mi).[2][3] The Guigang to Yulin section of the line, 98 km (61 mi) in length, has been double-tracked and underwent capacity expansion from 2013 to 2015 to accommodate trains running at speeds of up to 160 km (99 mi) to 200 km (124 mi).[4] The project is complete for the Guigang–Yulin section, and the EMU train entered operation in the end of 2016.[5]