Beijing–Tangshan intercity railway is a high-speed railway connecting Beijing and Tangshan in eastern Hebei . The railway opened on 30 December 2022.[ 2]
From Beijing railway station [ 1] to Baodi railway station , the Beijing–Binhai intercity railway will share its northern segment with the Beijing–Tangshan intercity railway before continuing southeast-ward to Binhai West railway station .[ 3]
Overview
The railway will begin at Beijing railway station , which is located in Dongcheng District of Beijing.[ 1] The Beijing Sub-Center railway station is under construction and will be finished in 2024. And then it crossing into Hebei 's Xianghe County . Next it crosses Tianjin 's Baodi District to re-enter Hebei at Tangshan City's Yutian County and Fengrun District . Finally, it will terminate at Tangshan railway station . Total line length of will be approximately 163 km (101 mi), with a total of 8 stations and a design speed of 350 km/h (220 mph).[ 4]
History
Construction on the railway was originally scheduled to start in 2009[ 5] but the completion has been delayed after a nationwide rail review following the 2011 Wenzhou Rail Incident. Construction was eventually started on 29 December 2015.[ 6] The railway opened on 30 December 2022.[ 2] [ 7]
Stations
References
High-speed demonstrative
maglev
Intercity and long-distance Regional intercity Upgraded old lines
Italics : under construction or currently not operational
(-), Place A- : section under construction or currently not operational
§: in/related to Hong Kong, Macau, Taiwan
(Place A–Place B): share tracks with other lines