The locomotive was delivered to the GWR on 6 October 1838 and ceased work in December 1839[1] after running for just 10,527 miles. After withdrawal the boiler was used on a new Pyracmon Class goods locomotive, Bacchus.
Reed, P. J. T. (February 1953). White, D. E. (ed.). The Locomotives of the Great Western Railway, Part 2: Broad Gauge. Kenilworth: RCTS. ISBN0-901115-32-0.