New Haven–Springfield Line

New Haven–Springfield Line
An Amtrak train crossing the Farmington River in 2015
Overview
StatusOperating
OwnerAmtrak
LocaleConnecticut and Massachusetts
Termini
Stations9
Service
TypeInter-city rail
Commuter rail
SystemAmtrak
Services
Operator(s)Amtrak, CT Rail, Connecticut Southern Railroad (freight)
History
Opened1844; 181 years ago (1844)
Technical
Line length62 miles (100 km)
Number of tracks1–2
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
Operating speedUp to 110 mph (180 km/h)[1]
Route map

0.0 mi
0 km
Springfield enlarge… Hartford Line
14.6 mi
23.5 km
Windsor Locks Hartford LineBradley International Airport
19.1 mi
30.7 km
Windsor Hartford Line
25.3 mi
40.7 km
Hartford Hartford Line
35.9 mi
57.8 km
Berlin Hartford Line
43.3 mi
69.7 km
Meriden Hartford Line
55.6 mi
89.5 km
Wallingford Hartford Line
60.5 mi
97.4 km
61.4 mi
98.8 km
New Haven State Street Hartford LineShore Line East
62 mi
100 km
New Haven Union Station Hartford LineShore Line East

The New Haven–Springfield Line is a railroad line owned by Amtrak from New Haven, Connecticut, north to Springfield, Massachusetts, serving the Knowledge Corridor. As a branch of the Northeast Corridor just north of New Haven State Street station, it is served by approximately seven daily Northeast Regional round trips, some continuing from New Haven to Washington, D.C., along the Corridor and others terminating at New Haven as shuttles. On weekends, there is one train daily to Roanoke, Virginia. It is also served by the daily Vermonter, which starts in Washington, D.C., and continues north from Springfield, finally terminating in St. Albans, Vermont.[2] The line is part of the Inland Route connecting Boston and New York via Hartford, Springfield, and Worcester, in contrast to the "Shore Line" along the Connecticut Shore and through Rhode Island.

The line was originally built by the Hartford and New Haven Railroad, and opened to Springfield in 1844. In 2004, Congress added the New Haven–Springfield Line onto the Northern New England Corridor, one of ten federally designated corridors for potential high-speed rail service. Upgrades needed for higher-speed rail, including rebuilding portions of double tracking removed in the 1980s, were performed in preparation for the CT Rail Hartford Line commuter service, which launched on June 16, 2018.[3]

History

The New Haven–Springfield Line was built by the Hartford and New Haven Railroad (H&NH) and began operations in 1844, forming the first all-rail route between Boston and New Haven, with steamship service on Long Island Sound completing service to New York. The Shore Line, today's Northeast Corridor, was completed in 1858, but the Springfield route continued to carry most traffic until the bridge over the Thames River at New London, Connecticut, opened in 1889.[citation needed]

The H&NH was merged into the New York, New Haven and Hartford Railroad (NYNH&H) in 1872, and the NYNH&H continued to operate regular service between New York City and Springfield over the line. Various services were also operated over the Inland Route, starting July 1, 1911, by agreement of the NYNH&H and the New York Central and Hudson River Railroad (lessee of the Boston and Albany Railroad).

During the 1940s period of peak passenger volume, the NYNH&H ran several New York City - Boston trains through the Inland Route, that is, via New Haven, Hartford, Springfield and Worcester, in the #50s series of train numbers. The service included an overnight train with sleeping car service. By the mid-1950s these trips needed transfers in Springfield.[4][5][6]

By the startup of Amtrak on May 1, 1971, the Inland Route was no longer in use, but frequent Penn Central trains continued to serve the New Haven–Springfield Line.[citation needed] Amtrak continued the Connecticut Yankee (by that time shortened to Philadelphia-Springfield) along the route. On May 17, 1971, Amtrak added a train between Philadelphia and Boston via the Inland Route. With the November 14, 1971 timetable, this was assigned the name Bay State, and extended south from Philadelphia to Washington, DC. The train was discontinued March 1, 1975, though on October 31 of that year, the Boston section of the Lake Shore Limited began, restoring Springfield–Boston service.[7]

On April 1, 1976, Amtrak acquired the New Haven–Springfield Line from the newly formed Conrail, along with most of the Northeast Corridor.[8]

During the mid-1980s, due to the high cost of operating the New Haven–Springfield Line and the competing newly-constructed expressways, Amtrak removed 25 miles (40 km) of track, turning the line from a double-track line to a line with a single track with passing sidings.[9][10] Of the 62 miles (100 km) between New Haven and Springfield, 23.3 miles (37.5 km) of double track and 38.7 miles (62.3 km) of single track were left.[11]

A New Haven Railroad train crossing the Warehouse Point railroad bridge in July 1968

The final iteration of Inland Route service began with the November 10, 1996, timetable, with the extension of the daily Virginia Service train 85/86 to Boston via Springfield. That train was later truncated, and the former WashingtonBoston Bay State was reinstated via the Inland Route.[12] By the October 28, 2002, schedule, trains 140 (weekend) and 142 (weekday) provided northbound Inland Route service, while the only weekend service was provided southbound via the 147. Train 142 was dropped October 27, 2003, and the November 1, 2004, timetable dropped 140 and 147, ending the use of the Inland Route.[citation needed]

On May 22, 2012, construction started on the CT Fastrak busway between New Britain and Hartford in the northern two track slots between Hartford and Newington Junction.[13] The southern two track slots are used for the active double-track rail line. Any future re-addition of a third or fourth track would require removing or relocating the busway.

The connection between a new double track section from Hartford to Windsor and an existing section from north of Windsor to south of Windsor Locks was completed on September 25, 2018, leaving less than twelve miles (19 km) of single track on the line.[14][15] The new section was not expected to allow additional service, but to increase reliability.[14]

Interstate 84

One proposal to replace the aging Interstate 84 viaduct through Hartford as part of the I-84 Hartford Project is an at-grade roadbed, which would require relocating the rail tracks and busway north of the new road. The viaduct crosses the tracks and busway twice, a route dictated by the placement of abutting development back when the viaduct was constructed in the 1960s. Subsequent demolition has made the proposal to move the tracks a viable option to consider.[16]

Amtrak Hartford Line

Amtrak runs Hartford Line trains between Springfield, Massachusetts, and New Haven, Connecticut. These trains connect with Northeast Regional or Metro-North New Haven Line service at New Haven's Union Station, usually by a cross-platform or same-track transfer. The Hartford Line trains are in the 400 series, with the last two digits usually denoting the number of the Amtrak train it is connecting to. In September 2019 Amtrak adopted the state of Connecticut’s Hartford Line branding for its trains on the line, replacing the Shuttle designation. The branding is shared with the state operated CTrail commuter trains which also serve the corridor. Together the two services make up the Hartford Line commuter rail program.[17][18]

Hartford Line

The Connecticut Department of Transportation (CTDOT) and the Massachusetts Executive Office of Transportation studied adding a dedicated New Haven–Hartford–Springfield Commuter Rail Line between New Haven and Springfield to create a more accessible commuter connection to the Metro North commuter lines between New York City and Southwestern Connecticut, and also give more transit options to people commuting within the Knowledge Corridor region surrounding Hartford and Springfield. As part of this, extending or adding stations and right of way and new rail options were investigated. The study culminated in a final report in 2005, which was presented for a grant application to the Federal Transit Administration New Starts program.[19]

Construction added 27 miles (43 km) of double track[20][21] as well as 2 miles (3.2 km) of new passing sidings, leaving less than 12 miles (19 km) of single track.[15] Five new interlockings were built and new signal systems were installed, including the installation of Positive Train Control. Bridges and culverts on the line have been repaired, rehabilitated or replaced. Stations at Wallingford, Meriden, and Berlin were completely rebuilt, while New Haven State Street and Hartford had improvements made.[21]

New Hartford Line commuter rail service on the line began on June 16, 2018.[22] Expanded Amtrak Shuttle service on the line launched one week earlier on June 9, 2018.[23] Connecticut DOT provides eight round trip commuter trains on weekdays under its CT Rail branding that are operated by its new contractor, a joint venture between TransitAmerica Services and Alternate Concepts Inc.[24] Half of these trains operate between New Haven and Hartford, with the other four running the whole line between New Haven and Springfield.[25] Amtrak added three new Shuttle round trips on top of its previous service. This brings the total round trips on the line to sixteen between New Haven and Hartford, with twelve of them operating along the full line to Springfield. On weekends and holidays, CT Rail operates four New Haven–Hartford round trips and three New Haven–Springfield round trips. Amtrak continues to offer its existing weekend service with some minor schedule changes. Together, 12–13 round trips are offered on weekends.[25]

Stations

The Springfield–New Haven corridor is served by some Northeast Regional trains in the 136 and 140 series. These trains provide direct service from Springfield to Washington, D.C., without the need to change trains in New Haven.

Miles (km)[26] State Municipality Station[27] Line services Other rail services
HL NR VT
0 (0) MA Springfield Springfield Union Station Amtrak Amtrak: Lake Shore Limited
14.6 (23.5) CT Windsor Locks Windsor Locks
19.1 (30.7) Windsor Windsor
25.3 (40.7) Hartford Hartford Union Station
35.9 (57.8) Berlin Berlin
43.3 (69.7) Meriden Meriden
49.0 (78.9) Wallingford Wallingford
61.4 (98.8) New Haven New Haven State Street Shore Line East CTrail: Shore Line East
Metro-North Railroad: New Haven Line
62.0 (99.8) New Haven Union Station Amtrak Amtrak: Acela, Northeast Regional
Shore Line East CTrail: Shore Line East
Metro-North Railroad: New Haven Line

References

  1. ^ "AMTRAK RUNS TEST TRAINS OF UP TO 110 MPH IN PREPARATION FOR THE LAUNCH OF THE HARTFORD LINE ON JUNE 16" (Press release). Connecticut Department of Transportation. June 6, 2018. Retrieved June 17, 2018.
  2. ^ "First passenger train in a generation stops at Northampton as new Amtrak service begins". December 30, 2014.
  3. ^ Porter, Mikaela; Owens, David (June 17, 2018). "Thousands Take A Free Ride On Hartford Line's Inaugural Run". Hartford Courant. Retrieved June 17, 2018.
  4. ^ New Haven June 1946 timetable, consist table and Table 3
  5. ^ 'Official Guide of the Railways,' June 1949, consist table and Table 10
  6. ^ New Haven April 1955 timetable, Table 3
  7. ^ Wicker, Tom (October 31, 2015). "Amtrak's Lake Shore Ltd turns 40!". All Aboard Ohio. Retrieved April 9, 2018.
  8. ^ Karr, Ronald Dale (2017). The Rail Lines of Southern New England : a Handbook of Railroad History (Second ed.). Pepperell, Massachusetts: Branch Line Press. p. 86. ISBN 978-0-942147-12-4. OCLC 874835522.
  9. ^ "Objectives & Scope". New Haven–Hartford–Springfield Rail Program. Connecticut Department of Transportation. Retrieved July 1, 2018.
  10. ^ Karr, Ronald Dale (1995). The Rail Lines of Southern New England. Branch Line Press. p. 78. ISBN 0942147022.
  11. ^ "Connecticut: New Travel Options for the Northeast Region" (PDF). SPEEDLINES. No. 23. High-Speed Intercity Passenger Rail Committee. June 2018. p. 20. Retrieved July 1, 2018.
  12. ^ Kush, Bronislaus B (December 28, 1996). "Amtrak says: Riders wanted; Lack of support may derail trains". Telegram & Gazette. p. A1.
  13. ^ "Busway: After More Than 12 Years, Work Starts In Earnest On Busway". Hartford Courant.
  14. ^ a b Lurye, Rebecca (June 12, 2018). "Despite New Commuter Line, Rail Upgrades Lag North Of Hartford". Hartford Courant. Retrieved September 25, 2018.
  15. ^ a b "CTDOT ANNOUNCES COMPLETION OF A SECOND RAIL TRACK ON THE CTrail HARTFORD LINE BETWEEN HARTFORD AND WINDSOR" (Press release). Connecticut Department of Transportation. September 25, 2018. Retrieved September 25, 2018.
  16. ^ "Alternatives Analysis". I-84 Hartford Project. Connecticut Department of Transportation. Retrieved January 4, 2018.
  17. ^ "CTrail Hartford Line Schedules: Effective April 14, 2019" (PDF). Hartford Line. April 14, 2019. Archived from the original (PDF) on October 12, 2019. Retrieved May 20, 2019.
  18. ^ "Northeast Corridor Boston/Springfield–Washington Timetable" (PDF). Amtrak. April 4, 2019. Retrieved May 20, 2019.
  19. ^ "New Haven Hartford Springfield Commuter Rail Implementation Study: Recommended Action" (PDF). Connecticut Department of Transportation. Retrieved April 9, 2018.
  20. ^ "Winter 2018 Newsletter" (PDF). NHHS Rail Program. January 17, 2018. Retrieved January 17, 2018.
  21. ^ a b "What the Hartford Line Brings to Customers". Hartford Line. 2018. Retrieved May 19, 2018.
  22. ^ Porter, Mikaela; Owens, David (June 17, 2018). "Thousands Take A Free Ride On Hartford Line's Inaugural Run". Retrieved June 18, 2018.
  23. ^ "Connecticut DOT gears up for Hartford Line testing". June 6, 2018. Retrieved June 6, 2017.
  24. ^ "Gov. Malloy Announces TransitAmerica Services and Alternate Concepts Selected as Service Provider for the Hartford Line". The Office of Governor Dannel P. Malloy. Connecticut DOT. Retrieved July 24, 2017.
  25. ^ a b "CTrail Hartford Line Schedules: Effective April 14, 2019" (PDF). Hartford Line. April 14, 2019. Archived from the original (PDF) on October 12, 2019. Retrieved May 23, 2019.
  26. ^ "Executive Summary" (PDF). Connecticut Department of Transportation. p. 4. Retrieved June 4, 2018.
  27. ^ "Stations". Hartford Line. Archived from the original on February 25, 2019. Retrieved February 25, 2019.

Read other articles:

Overview of the environmental issues in the Philippines Today, environmental problems in the Philippines include pollution, mining and logging, deforestation, threats to environmental activists, dynamite fishing, landslides, coastal erosion, biodiversity loss, extinction, global warming and climate change.[1][2][3] Due to the paucity of extant documents, a complete history of land use in the archipelago remains unwritten. However, relevant data shows destructive land u...

 

Épinay-sur-SeineNegaraPrancisArondisemenSaint-DenisAntarkomuneCommunautéd'agglomérationPlaine CommuneKode INSEE/pos93031 /  Épinay-sur-Seine merupakan sebuah komune di pinggiran utara Paris, Prancis. Terletak 11.3 km (7 mil) dari pusat kota Paris. Gereja Notre-Dame-des-Missions-du-cygne d'Enghien, dirancang Paul Tournon, dapat ditemukan di komune ini. Sejarah Tanggal 7 Agustus 1850, sebagian teritori Épinay-sur-Seine dipisahkan dan bergabung dengan teritori Deuil-la-Barre, Sain...

 

Rumus struktur adenosin difosfat (ADP) Adenosin difosfat, disingkat ADP, adalah sebuah nukleotida. Senyawa ini merupakan bentuk ester dari asam pirofosforat dengan nukleobasa adenina. ADP terdiri dari gugus pirofosfat, ribosa gula pentosa, dan nukleobasa adenina.[1] ADP merupakan produk intermediat dalam berbagai metabolisme selular[1]. ADP merupakan produk dari reaksi defosforilasi hidrolisis ATP pada ATPase. ADP dapat kembali menjadi ATP oleh ATP synthase. ATP adalah energi ...

Artikel ini sebatang kara, artinya tidak ada artikel lain yang memiliki pranala balik ke halaman ini.Bantulah menambah pranala ke artikel ini dari artikel yang berhubungan atau coba peralatan pencari pranala.Tag ini diberikan pada Oktober 2022. Katedral Santa MariaToomkirik59°26′14″N 24°44′20″E / 59.4371°N 24.7390°E / 59.4371; 24.7390Koordinat: 59°26′14″N 24°44′20″E / 59.4371°N 24.7390°E / 59.4371; 24.7390NegaraEstoniaDen...

 

Artikel ini perlu diterjemahkan ke bahasa Indonesia. Artikel ini ditulis atau diterjemahkan secara buruk dari Wikipedia bahasa selain Indonesia. Jika halaman ini ditujukan untuk komunitas berbahasa tersebut, halaman itu harus dikontribusikan ke Wikipedia bahasa tersebut. Lihat daftar bahasa Wikipedia. Artikel yang tidak diterjemahkan dapat dihapus secara cepat sesuai kriteria A2. Jika Anda ingin memeriksa artikel ini, Anda boleh menggunakan mesin penerjemah. Namun ingat, mohon tidak menyalin ...

 

رافاييل مونيو (بالإسبانية: José Rafael Moneo Vallés)‏  معلومات شخصية الميلاد 9 مايو 1937 (العمر 86 سنة)منطقة نافارا، تطيلة مواطنة إسبانيا  عضو في الأكاديمية الملكية للفنون الجميلة في سان فرناندو  [لغات أخرى]‏،  والأكاديمية الملكية للهندسة في إسبانيا،  والأكاديمية الم�...

Maurizio FondriestMaurizio Fondriest sur le Critérium de Lèves 1997InformationsNaissance 15 janvier 1965 (59 ans)ClesNationalité italienneÉquipes amateurs 1985-1986Zalf Désirée FiorÉquipes professionnelles 1987Ecoflam-BFB Bruciatori-Mareco-Alfa Lum1988Alfa Lum-Legnano-Ecoflam1989Del Tongo-Mele Val di Non1990Del Tongo-Rex1991-1992Panasonic-Sportlife1993Lampre-Polti1994-1995Lampre-Panaria1996Roslotto-ZG Mobili1997-1998CofidisPrincipales victoires Coupe du monde Coupe du monde 1991 e...

 

العلاقات الوسط أفريقية اللاوسية جمهورية أفريقيا الوسطى لاوس   جمهورية أفريقيا الوسطى   لاوس تعديل مصدري - تعديل   العلاقات الوسط أفريقية اللاوسية هي العلاقات الثنائية التي تجمع بين جمهورية أفريقيا الوسطى ولاوس.[1][2][3][4][5] مقارنة بين البلدي...

 

Michael Beauchamp Informasi pribadiNama lengkap Michael Francis BeauchampTanggal lahir 8 Maret 1981 (umur 43)Tempat lahir Sydney, AustraliaTinggi 6 ft 3 in (1,91 m)Posisi bermain BekInformasi klubKlub saat ini Western Sydney WanderersNomor 5Karier junior Marconi StallionsKarier senior*Tahun Tim Tampil (Gol)2000–2002 Marconi Stallions 26 (0)2002–2004 Parramatta Power 57 (0)2004 Sydney Olympic 3 (0)2005–2007 Central Coast Mariners 22 (0)2006–2007 → 1. FC Nuremberg...

Cinema of theCaribbean Caribbean films Antigua and Barbuda Aruba Bahamas Barbados Dominican Republic Guadeloupe Haiti Jamaica Martinique Puerto Rico Trinidad and Tobagovte Part of a series on theCulture of Haiti History Timeline Taíno chiefdoms Captaincy General of Santo Domingo Colonial governors Atlantic slave trade Maroons Peace of Ryswick Saint-Domingue Colonial governors Slavery Le Jeune Case Haitian Revolution 1804 massacre First Empire State Kingdom Republic 1806–1820 1820–1849 U...

 

Salyut space station launched in 1974 Salyut 4 (DOS-4)Salyut 4 being constructedThe insignia of the Salyut Program.Station statisticsCOSPAR ID1974-104ASATCAT no.07591Call signSalyut 4Crew2LaunchDecember 26, 1974 04:15:00 UTCLaunch padLC-81/24, Baikonur Cosmodrome, Soviet UnionReentryFebruary 3, 1977Mass18,210 kilograms (40,150 lb) (fuelled mass)16,210 kilograms (35,740 lb)Length15.8 mWidth4.15 mPressurised volume90 m3Periapsis altitude136 mi (219 km)Apoapsis altitude168 mi (270 km)O...

 

Pour les articles homonymes, voir Warrington. Si ce bandeau n'est plus pertinent, retirez-le. Cliquez ici pour en savoir plus. La traduction de cet article ou de cette section doit être revue (mars 2015). Le contenu est difficilement compréhensible vu les erreurs de traduction, qui sont peut-être dues à l'utilisation d'un logiciel de traduction automatique. Discutez des points à améliorer en page de discussion ou modifiez l'article. Si ce bandeau n'est plus pertinent, retirez-le. Cliqu...

この項目には、一部のコンピュータや閲覧ソフトで表示できない文字が含まれています(詳細)。 数字の大字(だいじ)は、漢数字の一種。通常用いる単純な字形の漢数字(小字)の代わりに同じ音の別の漢字を用いるものである。 概要 壱万円日本銀行券(「壱」が大字) 弐千円日本銀行券(「弐」が大字) 漢数字には「一」「二」「三」と続く小字と、「壱」「�...

 

  提示:此条目页的主题不是中華人民共和國最高領導人。 中华人民共和国 中华人民共和国政府与政治系列条目 执政党 中国共产党 党章、党旗党徽 主要负责人、领导核心 领导集体、民主集中制 意识形态、组织 以习近平同志为核心的党中央 两个维护、两个确立 全国代表大会 (二十大) 中央委员会 (二十届) 总书记:习近平 中央政治局 常务委员会 中央书记处 �...

 

Chronologies Données clés 1823 1824 1825  1826  1827 1828 1829Décennies :1790 1800 1810  1820  1830 1840 1850Siècles :XVIIe XVIIIe  XIXe  XXe XXIeMillénaires :-Ier Ier  IIe  IIIe Chronologies géographiques Afrique Afrique du Sud, Algérie, Angola, Bénin, Botswana, Burkina Faso, Burundi, Cameroun, Cap-Vert, République centrafricaine, Comores, République du Congo, République démocratique du Congo, Côte d'Ivoire, Djibouti, Égyp...

Irvine PagePage (right) and lab tech in the 1960sBornIrvine Heinly Page(1901-01-07)January 7, 1901Indianapolis, Indiana, USDiedJune 10, 1991(1991-06-10) (aged 90)Hyannis Port, Massachusetts, US Irvine Heinly Page (January 7, 1901 – June 10, 1991) was an American physiologist who played an important part in the field of hypertension for almost 60 years while working at the Cleveland Clinic as the first Chair of Research.[1][2][3] Early life and education Irvine P...

 

Ring used for fastening or joining For the plant of similar name, see Ferula. This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Ferrule – news · newspapers · books · scholar · JSTOR (July 2017) (Learn how and when to remove this message) Look up ferrule in Wiktionary, the free dictionary. A wire rope terminate...

 

Massacro di piazza Rabi'a al-'AdawiyyaUna ruspa dell'esercito rimuove le barricate Data14 agosto 2013 LuogoPiazza Rabi'a al-'Adawiyya, Il Cairo Stato Egitto ObiettivoSostenitori di Mohamed Morsi e del Partito Libertà e Giustizia ResponsabiliForze di sicurezza egiziane ConseguenzeMorti817 (secondo Human Rights Watch)638 (secondo il ministero della Salute egiziano)2.600 (secondo i Fratelli Musulmani) Feritialmeno 3994 Modifica dati su Wikidata · Manuale Il massacro di piazza Rabi'a ...

Television Channel Television channel Dubai TVLogo of the channelBroadcast areaWorldwideProgrammingPicture format16:9SD (576i)HD (1080i)OwnershipOwnerDubai Media IncorporatedHistoryLaunchedJune 14, 2004; 20 years ago (2004-06-14)LinksWebsitewww.dubaitv.ae Dubai TV is a TV channel offered by the Dubai Media Incorporated (DMI). It replaced Emirates Dubai Television on June 14, 2004. Dubai TV broadcasts programmes predominantly in Arabic. The programming caters to family Arab a...

 

В статье не хватает ссылок на источники (см. рекомендации по поиску). Информация должна быть проверяема, иначе она может быть удалена. Вы можете отредактировать статью, добавив ссылки на авторитетные источники в виде сносок. (4 августа 2012) Министерство иностранных дел Мьян...