The Howrah Bridge is a balanced steelbridge over the Hooghly River in West Bengal, India. Commissioned in 1943,[9][11] the bridge was originally named the New Howrah Bridge, because it replaced a pontoon bridge at the same location linking the twin cities of Howrah and Kolkata, which are located at the opposite banks of each other. On 14 June 1965, it was renamed Rabindra Setu after the Bengali poet Rabindranath Tagore, who was the first Indian and Asian Nobel laureate.[11] It is still popularly known as the Howrah Bridge.
The bridge is one of four on the Hooghly River and is a famous symbol of Kolkata and West Bengal. The other bridges are the Vidyasagar Setu (popularly called the Second Hooghly Bridge), the Vivekananda Setu and the relatively new Nivedita Setu. It carries a daily traffic of approximately 100,000 vehicles[12] and possibly more than 150,000 pedestrians,[10] easily making it the busiest cantilever bridge in the world.[13] The third-longest cantilever bridge at the time of its construction,[14] the Howrah Bridge is currently the sixth-longest bridge of its type in the world.[15]
History
1862 proposal by Turnbull
In 1862, the Government of Bengal asked George Turnbull, chief engineer of the East Indian Railway Company to study the feasibility of bridging the Hooghly River. He had recently established the company's rail terminus in Howrah. He reported on 19 March, with large-scale drawings and estimates, that:[16]
The foundations for a bridge at Calcutta would be at a considerable depth and cost because of the depth of the mud there.
The impediment to shipping would be considerable.
A good place for the bridge was at Pulta Ghat "about a dozen miles north of Calcutta" where a "bed of stiff clay existed at no great depth under the river bed".
A suspended-girder bridge of five spans of 401 feet (122 m) and two spans 200 feet (61 m) would be ideal.
Pontoon bridge
In view of the increasing traffic across the Hooghly river, a committee was appointed in 1855–56 to review alternatives for constructing a bridge across it.[17] The plan was shelved in 1859–60, to be revived in 1868, when it was decided that a bridge should be constructed and a newly appointed trust vested to manage it. The Calcutta Port Trust was founded in 1870,[9] and the Legislative department of the then Government of Bengal passed the Howrah Bridge Act in the year 1871 under the Bengal Act IX of 1871,[9][17] empowering the lieutenant-governor to have the bridge constructed with Government capital under the aegis of the Port Commissioners.
Eventually a contract was signed with Sir Bradford Leslie to construct a pontoon bridge. Different parts of the bridge were constructed in England and shipped to Calcutta, where they were assembled. The assembling period was fraught with problems. The bridge was considerably damaged by the great cyclone on 20 March 1874.[8] A steamer named Egeria broke from her moorings and collided head-on with the bridge, sinking three pontoons and damaging nearly 200 feet of the bridge.[8] The bridge was complete in 1874,[9] at a total cost of ₹2.2 million,[17] and opened to traffic on 17 October of that year.[8] The bridge was then 1528 ft long and 62 ft wide, with 7-foot wide pavements on either side.[9] Initially the bridge was periodically unfastened to allow steamers and other marine vehicles to pass through. Before 1906, the bridge used to be undone for the passage of vessels during daytime only. Since June of that year it started opening at night for all vessels except ocean steamers, which were required to pass through during daytime.[17] From 19 August 1879, the bridge was illuminated by electric lamp-posts, powered by the dynamo at the Mullick Ghat Pumping Station.[9] As the bridge could not handle the rapidly increasing load, the Port Commissioners started planning in 1905 for a new improved bridge.
Plans for a new bridge
In 1906[8] the Port Commission appointed a committee headed by R.S. Highet, chief engineer, East Indian Railway and W.B. MacCabe, chief engineer, Calcutta Corporation. They submitted a report stating that[9]
Bullock carts formed the eight - thirteenths of the vehicular traffic (as observed on 27 August 1906, the heaviest day's traffic observed in the port of Commissioners 16 days' Census of the vehicular traffic across the existing bridge). The roadway on the existing bridge is 48 feet wide except at the shore spans where it is only 43 feet in roadways, each 21 feet 6 inches wide. The roadway on the new bridge would be wide enough to take at least two lines of vehicular traffic and one line of trams in each direction and two roadways each 30 feet wide, giving a total width of 60 feet of road way which are quite sufficient for this purpose [...] The traffic across the existing floating bridge Calcutta & Howrah is very heavy and it is obvious if the new bridge is to be on the same site as the existing bridge, then unless a temporary bridge is provided, there will be serious interruptions to the traffic while existing bridge is being moved to one side to allow the new bridge to be erected on the same site as the present bridge.
The committee considered six options:
Large ferry steamers capable of carrying vehicular load (set up cost ₹900,000, annual cost ₹438,000)
A transporters bridge (set up cost ₹2 million)
A tunnel (set up cost ₹338.2 million, annual maintenance cost ₹1,779,000)
A bridge on piers (set up cost ₹22.5 million)
A floating bridge (set up cost ₹2,140,000, annual maintenance cost ₹200,000)
An arched bridge
The committee eventually decided on a floating bridge. It extended tenders to 23 firms for its design and construction. Prize money of £3,000 (₹45,000, at the then exchange rate) was declared for the firm whose design would be accepted.[9]
Planning and estimation
The initial construction process of the bridge was stalled due to World War I, although the bridge was partially renewed in 1917 and 1927. In 1921 a committee of engineers named the 'Mukherjee Committee' was formed, headed by R. N. Mukherji, Sir Clement Hindley, chairman of Calcutta Port Trust and J. McGlashan, Chief Engineer. They referred the matter to Sir Basil Mott, who proposed a single span arch bridge.[9] Charles Alfred O'Grady one of the Engineers
In 1922, set up, to which the Mukherjee Committee submitted its report. In 1926 the New Howrah Bridge Act passed. In 1930 the Goode Committee was formed, comprising S.W. Goode as president, S.N. Mallick, and W.H. Thompson, to investigate and report on the advisability of constructing a pier bridge between Calcutta and Howrah. Based on their recommendation, M/s. Rendel, Palmer and Tritton were asked to consider the construction of a suspension bridge of a particular design prepared by their chief draftsman Mr. Walton.[9] On basis of the report, a global tender was floated. The lowest bid came from a German company, but due to increasing political tensions between Germany and Great Britain in 1935, it was not given the contract.[8] The Braithwaite, Burn & Jessop Construction Co. was awarded the construction contract that year. The New Howrah Bridge Act was amended in 1935 to reflect this, and construction of the bridge started the next year.[9]
Construction
The bridge does not have nuts and bolts,[11][18] but was formed by riveting the whole structure. It consumed 26,500 tons of steel, out of which 23,000 tons of high-tensile alloy steel, known as Tiscrom, were supplied by Tata Steel.[8][19] The main tower was constructed with single monolith caissons of dimensions 55.31m× 24.8m[5][20] with 21 shafts, each 6.25 metre square.[21] The Chief Engineer of the Port Trust, Mr. J. McGlashan, wanted to replace the pontoon bridge, with a permanent structure, as the present bridge interfered with north–south river traffic. Work could not be started as World War I (1914–1918) broke out. Then in 1926 a commission under the chairmanship of Sir R. N. Mukherjee recommended a suspension bridge of a particular type to be built across the River Hoogly. The bridge was designed by one Mr. Walton of M/s Rendel, Palmer & Triton. The order for construction and erection was placed on M/s.Cleveland Bridge & Engineering Company in 1939. Again World War II (1939–1945) intervened. All the steel that was to come from England were diverted for war effort in Europe. Out of 26,000 tons of steel, that was required for the bridge, only 3000 tons were supplied from England. In spite of the Japanese threat, the then (British) government of India pressed on with the construction. Tata Steel were asked to supply the remaining 23,000 tons of high tension steel. The Tatas developed the quality of steel required for the bridge and called it Tiscrom. The entire 23,000 tons was supplied in time. The fabrication and erection work was awarded to a local engineering firm of Howrah: the Braithwaite, Burn & Jessop Construction Co. The two anchorage caissons were each 16.4 m by 8.2 m, with two wells 4.9 m square. The caissons were so designed that the working chambers within the shafts could be temporarily enclosed by steel diaphragms to allow work under compressed air if required.[21] The caisson at Kolkata side was set at 31.41 m and that at Howrah side at 26.53 m below ground level.[5]
One night, during the process of grabbing out the muck to enable the caisson to move, the ground below it yielded, and the entire mass plunged two feet, shaking the ground. The impact of this was so intense that the seismograph at Kidderpore registered it as an earthquake and a Hindutemple on the shore was destroyed, although it was subsequently rebuilt.[22] While muck was being cleared, numerous varieties of objects were brought up, including anchors, grappling irons, cannons, cannonballs, brass vessels, and coins dating back to the East India Company.
The job of sinking the caissons was carried out round-the-clock at a rate of a foot or more per day.[22] The caissons were sunk through soft river deposits to a stiff yellow clay 26.5 m below ground level. The accuracy of sinking the huge caissons was exceptionally precise, within 50–75 mm of the true position. After penetrating 2.1 m into clay, all shafts were plugged with concrete after individual dewatering, with some 5 m of backfilling in adjacent shafts.[21] The main piers on the Howrah side were sunk by open wheel dredging, while those on the Kolkata side required compressed air to counter running sand. The air pressure maintained was about 40 lbs per square inch (2.8 bar), which required about 500 workers to be employed.[13] Whenever excessively soft soil was encountered, the shafts symmetrical to the caisson axes were left unexcavated to allow strict control. In very stiff clays, a large number of the internal wells were completely undercut, allowing the whole weight of the caisson to be carried by the outside skin friction and the bearing under the external wall. Skin friction on the outside of the monolith walls was estimated at 29 kN/m2 while loads on the cutting edge in clay overlying the founding stratum reached 100 tonnes/m.[21] The work on the foundation was completed in November 1938.
By the end of 1940, the erection of the cantilevered arms was commenced and was completed in mid-summer of 1941. The two halves of the suspended span, each 282 feet (86 m) long and weighing 2,000 tons, were built in December 1941. The bridge was erected by commencing at the two anchor spans and advancing towards the center, with the use of creeper cranes moving along the upper chord. 16 hydraulic jacks, each of which had an 800-ton capacity, were pressed into service to join the two halves of the suspended span.[14]
The entire project cost ₹25 million (£2,463,887).[9] The project was a pioneer in bridge construction, particularly in India, but the government did not have a formal opening of the bridge due to fears of attacks by Japanese planes fighting the Allied Powers. Japan had attacked the United States at Pearl Harbor on 7 December 1941. The first vehicle to use the bridge was a solitary tram.[8]
The bridge is regarded "The Gateway to Kolkata, as it connects the city to Howrah Station".[citation needed]
Description
Specifications
When commissioned in 1943, Howrah was the 3rd-longest cantilever bridge in the world,[14] behind Pont de Québec (549 metres (1,801 ft)) in Canada and Forth Bridge (521 metres (1,709 ft)) in Scotland. It has since been surpassed by three bridges, making it the sixth-longest cantilever bridge in the world in 2013. It is a suspension typebalanced cantilever[5] bridge, with a central span 1,500 feet (460 m) between centers of main towers and a suspended span of 564 feet (172 m). The main towers are 280 feet (85 m) high above the monoliths and 76 feet (23 m) apart at the top. The anchor arms are 325 feet (99 m) each, while the cantilever arms are 468 feet (143 m) each.[7] The bridge deck hangs from panel points in the lower chord of the main trusses with 39 pairs of hangers.[5] The roadways beyond the towers are supported from ground, leaving the anchor arms free from deck load. The deck system includes cross girders suspended between the pairs of hangers by a pinned connection.[7] Six rows of longitudinal stringer girders are arranged between cross girders. Floor beams are supported transversally on top of the stringers,[7] while themselves supporting a continuous pressed steel troughing system surfaced with concrete.[5]
The longitudinal expansion and lateral sway movement of the deck are taken care of by expansion and articulation joints. There are two main expansion joints, one at each interface between the suspended span and the cantilever arms and there are others at the towers and at the interface of the steel and concrete structures at both approach.[5] There are total 8 articulation joints, 3 at each of the cantilever arms and 1 each in the suspended portion. These joints divide the bridge into segments with vertical pin connection between them to facilitate rotational movements of the deck.[5] The bridge deck has longitudinal ruling gradient of 1 in 40 from either end, joined by a vertical curve of radius 4,000 feet (1,200 m). The cross gradient of deck is 1 in 48 between kerbs.[5]
The bridge serves as the gateway to Kolkata, connecting it to the Howrah Station, which is one of the five intercity train terminus stations serving Howrah and Kolkata. As such, it carries the near entirety of the traffic to and from the station, taking its average daily traffic close to nearly 150,000 pedestrians and 100,000 vehicles.[10] In 1946, a census of the daily traffic was taken, which counted 27,400 vehicles, 121,100 pedestrians and 2,997 cattle.[13] The bulk of the vehicular traffic comes from buses and cars. Prior to 1993, the bridge also carried trams. Trams departed from the terminus at Howrah station towards Sealdah, Rajabazar, Shyambazar, High Court, Dalhousie Square, Park Circus, Ballygunge, Tollygunge etc. In 1993, tram service on the bridge was discontinued due to the increasing load on the structure. However, the bridge still continues to carry much more than the expected load. A 2007 report revealed that nearly 90,000 vehicles were plying on the bridge daily (15,000 of which were goods-carrying), though its load-bearing capacity is only 60,000.[23] One of the main reasons for the overloading was that, although vehicles carrying up to 15 tonnes are allowed on the structure, vehicles with 12-18 wheels and carrying loads up to 25 tonnes often plied on it. From 31 May 2007 onwards, overloaded trucks were banned from crossing the bridge and were redirected to the Vidyasagar Setu instead.[24] The road is flanked by footpaths 15 feet (4.6 m) wide, which are thronged with pedestrians.[5]
Maintenance
The Kolkata Port Trust (KoPT) is vested with the maintenance of the bridge. The bridge has been subject to damage from vehicles due to rash driving, and corrosion due to atmospheric conditions and biological wastes. In October 2008, 6 high-tech surveillance cameras were placed to monitor the entire 705 metres (2,313 ft) long and 30 metres (98 ft) wide structure from the control room. Two of the cameras were placed under the floor of the bridge to track the movement of barges, steamers and boats on the river, while the other four were fixed to the first layer of beams — one at each end and two in the middle — to monitor vehicle movements. This was in response to substantial damage caused to the bridge from collisions with vehicles, so that compensation could be claimed from the miscreants.[25]
Corrosion has been caused by bird droppings and human spitting. An investigation in 2003 revealed that as a result of prolonged chemical reaction caused by continuous collection of bird excreta, several joints and parts of the bridge were damaged.[10] As an immediate measure, the Kolkata Port Trust engaged contractors to regularly clean the bird droppings, at an annual expense of ₹500,000 (US$6,000). In 2004, KoPT spent ₹6.5 million (US$78,000) to paint the entirety of 2.2 million square metres (24 million square feet) of the bridge. Two coats of aluminium paint, with a primer of zinc chromate before that, was applied on the bridge, requiring a total of 26,500 litres of paint.[26]
The bridge is also considerably damaged by pedestrians spitting out acidic, lime-mixed stimulants (gutka and paan).[27] A technical inspection by Port Trust officials in 2011 revealed that spitting had reduced the thickness of the steel hoods protecting the pillars from six to less than three millimeters since 2007.[28][29] The hangers need those hoods at the base to prevent water seeping into the junction of the cross-girders and hangers, and damage to the hoods can jeopardize the safety of the bridge. KoPT announced that it will spend ₹2 million (US$24,000) on covering the base of the steel pillars with fibreglass casing to prevent spit from corroding them.[30]
On 24 June 2005, a private cargo vesselM V Mani, belonging to the Ganges Water Transport Pvt. Ltd, while trying to pass under the bridge during high tide, had its funnel stuck underneath for three hours, causing substantial damage worth about ₹15 million to the stringer and longitudinal girder of the bridge.[31] Some of the 40 cross-girders were also broken. Two of four trolley guides, bolted and welded with the girders, were extensively damaged. Nearly 350 metres (1,150 ft) of 700 metres (2,300 ft) of the track were twisted beyond repair.[32] The damage was so severe that KoPT requested help from Rendall-Palmer & Tritton Limited, the original consultant on the bridge from UK. KoPT also contacted SAIL for 'matching steel' used during its construction in 1943.[33] For the repair, which cost around ₹5 million (US$60,000), about 8 tonnes of steel was used. The repairs were completed in early 2006.[34]
^Kasturi Rangan (2003). The Shaping of Indian Science: 1914-1947. Universities Press. p. 494.
^Ponnuswamy (2007). Bridge Engineering. Tata Mcgraw Hill Education Private Limited. p. 304.
^ abcdWilliam Warren; Luca Invernizzi Tettoni; Luca Invernizzi (2001). Singapore, city of gardens. Periplus Editions. p. 369.
^ abDas, Soumitra (6 July 2008). "Cat's cradle of steel". The Telegraph. Calcutta, India. Archived from the original on 3 February 2013. Retrieved 21 November 2011.
^"Howrah bridge ban". The Telegraph. Calcutta, India. 14 April 2007. Archived from the original on 3 February 2013. Retrieved 21 November 2011.
^Mandal, Sanjay (15 May 2010). "Bridge bleeds, blow by blow". The Telegraph. Calcutta, India. Archived from the original on 3 February 2013. Retrieved 21 November 2011.
1990 film by David A. Prior The Final SanctionDirected byDavid A. PriorWritten byDavid A. PriorProduced byDavid MarriottStarringTed PriorRobert Z'DarRenée ClineDavid FawcettWilliam SmithMusic byGarm BeallTim JamesSteve McClintockDistributed byAction International PicturesRelease date 1990 (1990) Running time90 minutesLanguageEnglish The Final Sanction is a 1990 film, directed by David A. Prior and starring Ted Prior, Robert Z'Dar and William Smith.[1] Plot The United States and ...
TT Isle of Man 1949Detail lombaLomba ke 1 dari 6Grand Prix Sepeda Motor musim 1949Tanggal6–17 June 1949Nama resmiInternational Isle of Man Tourist TrophyLokasiSnaefell Mountain CourseSirkuitPublic roads6.072 km (3.773 mi)500 ccPembalap Putaran tercepatPembalap Bob Foster Moto GuzziCatatan waktu 25m 14s PodiumPertama Harold Daniell NortonKedua Johnny Lockett NortonKetiga Ernie Lyons Velocette350 ccPembalap Putaran tercepatPembalap Freddie Frith VelocetteCatatan waktu 26...
Gunung LamuHuidu LamuTitik tertinggiKetinggian1.542 m (5.059 ft)GeografiLetakSumalata, Kabupaten Gorontalo Utara, Provinsi Gorontalo, Pulau Sulawesi, Indonesia Gunung Lamu adalah nama sebuah gunung yang terletak di Desa Bulontio Timur, Kecamatan Sumalata, Kabupaten Gorontalo Utara, Provinsi Gorontalo. Gunung Lamu memiliki ketinggian mencapai 1.542 mdpl dan menjadi Gunung tertinggi ke-18 di Gorontalo.[1] Nama Lokal Gunung Lamu dikenal dengan nama Huidu Lamu. Huidu berarti Gun...
1928 United States Senate election in Florida ← 1922 November 6, 1928 1934 → Nominee Park Trammell Barclay Warburton Party Democratic Republican Popular vote 153,816 70,633 Percentage 68.53% 31.47% U.S. senator before election Park Trammell Democratic Elected U.S. Senator Park Trammell Democratic Elections in Florida Federal government Presidential elections 1848 1852 1856 1860 1868 1872 1876 1880 1884 1888 1892 1896 1900 1904 1908 1912 1916 1920 1924 1928 1...
Halaman ini berisi artikel tentang nama depan. Untuk nama keluarga, lihat Charles (nama keluarga). Untuk untuk yang lain-lain, lihat Charles (disambiguasi). CharlesRaja Charlemagne (742–814) dari FranksPelafalan/tʃɑːrlz/bahasa Prancis: [ʃaʁl]Jenis kelaminPriaDiperingati pada4 NovemberAsal usulKataPrancis, dari JermanikArtiPria yang merdekaAlternatifVarianCarl, Karl, Carlo, Carlos, CarolusNama terkaitWanita: Caroline, Charlotte, CharleneLihat pulaThomasAndrewHerman Charles adalah n...
1959 1967 Élections législatives de 1962 aux Comores 2 sièges de députés à l'Assemblée nationale 18 novembre 1962 Corps électoral et résultats Inscrits 82 504 Votants 73 990 89,68 % 25,4 Votes exprimés 73 934 Majorité présidentielle Liste Union pour la nouvelle République (UDT)Républicains indépendantsModérés Voix 73 934 100,00 % Députés élus 2 1 Députés sortants par circonscription Union pour la nouvelle R...
Upper house of the Maine Legislature 44°18′26″N 69°46′54″W / 44.307138°N 69.781586°W / 44.307138; -69.781586 Maine State SenateMaine State LegislatureTypeTypeUpper house Term limits4 terms (8 years)HistoryNew session startedDecember 7, 2022LeadershipPresidentTroy Jackson (D) since December 5, 2018 Majority LeaderEloise Vitelli (D) since February 1, 2021 Minority LeaderTrey Stewart (R) since December 7, 2022 StructureSeats35Political groupsMajority ...
Member of the Verkhovna Rada (national parliament of Ukraine) People's Deputy of UkraineOccupationActivity sectorsGovernmentDescriptionCompetenciesLegislationRelated jobsGovernment official, President of Ukraine Politics of Ukraine Constitution Human rights Presidency President Volodymyr Zelenskyy Office of the President National Security and Defence Council Presidential representatives Presidential symbols Executive Prime Minister Denys Shmyhal Cabinet Shmyhal Government Legislature Verkhovn...
لا يزال النص الموجود في هذه الصفحة في مرحلة الترجمة إلى العربية. إذا كنت تعرف اللغة المستعملة، لا تتردد في الترجمة. (أبريل 2019) صناعة المركباتمعلومات عامةصنف فرعي من تصنيع[1][2] جزء من تقسيم تصنيف الأنشطة الإنتاجية[2] جانب من جوانب transportation industry (en) الاسم industrie automobile (...
Contea di Live OakconteaContea di Live Oak – VedutaTribunale della contea LocalizzazioneStato Stati Uniti Stato federato Texas AmministrazioneCapoluogoGeorge West Data di istituzione1856 TerritorioCoordinatedel capoluogo28°21′00″N 98°07′48″W / 28.35°N 98.13°W28.35; -98.13 (Contea di Live Oak)Coordinate: 28°21′00″N 98°07′48″W / 28.35°N 98.13°W28.35; -98.13 (Contea di Live Oak) Superficie2 794 km² Abitanti11 531...
Danish cyclist (born 2006) Albert PhilipsenPersonal informationFull nameAlbert Withen PhilipsenBorn (2006-09-03) 3 September 2006 (age 17)Holte, DenmarkHeight1.84 m (6 ft 0 in)Team informationCurrent teamTscherning Cycling Academy (road)Canyon CLLCTV (MTB/Cyclo-cross)DisciplineRoadCyclo-crossMountain bikingRoleRiderAmateur teams2013–2022Holte MTB Klub2023Canyon CLLCTV (MTB/Cyclo-cross)2023–2024Tscherning Cycling Academy (road) Professional team2025–Lidl–T...
This is a dynamic list and may never be able to satisfy particular standards for completeness. You can help by adding missing items with reliable sources. Brix Tavern, Portland, Oregon Canlis, Seattle, Washington Gramercy Tavern, New York City The Misfit, Santa Monica, California Radar, Portland, Oregon Schwa, Chicago, Illinois Following is a list of New American restaurants: Acadia, Chicago, Illinois Al's Place, San Francisco, California Alberta Street Pub, Portland, Oregon Asiate, New York...
Episode list for an animated series For seasons 21–present, see List of The Simpsons episodes (season 21–present). Matt Groening, shown here in 2010, created The Simpsons, which premiered on December 17, 1989. The Simpsons is an American animated sitcom created by Matt Groening for the Fox Broadcasting Company. It is a satirical depiction of a dysfunctional middle-class American lifestyle starring the eponymous family: Homer, Marge, Bart, Lisa, and Maggie. Set in the town of Springfield, ...
New York Red BullsJulukanNew York Red Bulls, Red Bulls, Metro, RBNYBerdiri1994; 30 tahun lalu (1994);[1] sebagaiNew York/New Jersey MetroStarsStadionRed Bull ArenaHarrison, NJ(Kapasitas: 25,189)Ketua Red Bull GmbHPelatih Kepala Gerhard StruberLigaMajor League Soccer2021Wilayah timur: ke-7Keseluruhan: ke-14Play-off: Babak pertamaSitus webSitus web resmi klub Kostum kandang Kostum tandang Musim ini New York Red Bulls merupakan sebuah tim sepak bola Amerika Serikat yang bermain...
American college basketball season 2011–12 South Dakota State Jackrabbits men's basketballSummit League tournament championsNCAA Tournament, Round of 64ConferenceSummit LeagueRecord27–8 (15–3 The Summit)Head coachScott Nagy (17th season)Assistant coaches Rob Klinkefus Austin Hansen Brian Cooley Home arenaFrost ArenaSeasons← 2010–112012–13 → 2011–12 Summit League men's basketball standings vte Conf Overall Team W L PCT W L ...
Disambiguazione – Se stai cercando il sistema di scrittura della lingua greca, vedi Alfabeto della lingua greca antica. Disambiguazione – Se stai cercando alfabeto greco usato nella Spagna di Levante, nel V secolo a.C., vedi Alfabeto greco-iberico. Questa voce o sezione sull'argomento antica Grecia è priva o carente di note e riferimenti bibliografici puntuali. Sebbene vi siano una bibliografia e/o dei collegamenti esterni, manca la contestualizzazione delle fonti con note a piè d...
National intelligence agency of Botswana Directorate of Intelligence and SecurityAbbreviationDISEstablished2007Legal statusActivePurposeCyberwarfareCounterintelligenceInternal securityIntelligence agencySecurity agencyRegion served BotswanaDirector GeneralBrigadier Peter MagosiParent organizationGovernment of BotswanaBudget UndisclosedStaff UndisclosedFormerly calledDirectorate on Intelligence and Security Services The Directorate of Intelligence and Security (DIS) is the internal intelligenc...
Аджика — национальное блюдо исконно абхазского происхождения Абхазская кухня — кухня абхазов, сформировавшаяся на протяжении столетий под непосредственным влиянием природных и социально-экономических условий. Для абхазской кухни характерно широкое употреблен...
Grand Prix Azerbaijan 2018 Lomba ke-4 dari 21 dalam Formula Satu musim 2018← Lomba sebelumnyaLomba berikutnya → Tata letak Sirkuit Kota Baku.Detail perlombaan[1]Tanggal 29 April 2018Nama resmi Formula 1 2018 Rolex Azerbaijan Grand PrixLokasi Sirkuit Kota BakuBaku, AzerbaijanSirkuit Sirkuit jalan raya sementaraPanjang sirkuit 6.003 km (3.730 mi)Jarak tempuh 51 putaran, 306.049 km (190.170 mi)Cuaca BerawanPosisi polePembalap Sebastian Vettel FerrariWaktu 1:41.498...