The Delhi–Fazilka line is a railway line connecting Delhi and Fazilka the latter in the Indian state of Punjab. There is a link to Firozpur Cantonment. The line is under the administrative jurisdiction of Northern Railway. This line was a part of the historic Delhi–Karachi line.
Fazilka and Hussainiwala on this line are two defunct railway border crossing points on the India–Pakistan border. Before partition of India in 1947, there were the 711-kilometer (442-mile) long Delhi-Samma Satta and the 445-kilometer (277-mile) long Delhi-Raiwind railway lines, which were operational. After partition of India, a 20-kilometer (12-mile) line linked Amruka on the Pakistan side of the India–Pakistan border, opposite Fazilka, towards Samma Satta. The only train running through these tracks was withdrawn after 1965 war. The 275-kilometer (171-mile) long Amruka-Samma Satta line and the 28-kilometre (17-mile) long Kasur-Raiwind lines are operational in Pakistan now. The Hussainiwala–Ganda Singh Wala railway crossing, near Firozpur, became defunct with the partition of India. The 16-kilometer (9.9-mile) broad gauge line from Kasur Junction in Pakistan has been closed. The strategically important 1,681-metre (5,515-foot) Kaiser-E-Hind Rail cum Road Bridge was blown up during the Indo-Pakistani War of 1971 at Hussainiwala, and was never rebuilt. In 2013, Sutlej Barrage Bridge on Hussainiwala was opened after restructuring.
Electrification
The Okhla–New Delhi–Shakurbasti line was electrified in 1982–83.[7] As of 2011[update], only 3 km of the 60 km Shakurbasti–Rohtak was remaining.[8] The EMU services of Delhi Suburban Railway was extended up to Rohtak in 2013.[9]
After electrification up to Rohtak, further electrification begun in February 2015. Electrification up to Jind Junction was completed in 2017. Operations of electric locos up to Jind begin in January 2018. After this, electrification up to Bathinda Junction got completed in March 2018.
Electrification of Kurukshetra–Narwana and Jind–Panipat branch lines was started in 2018 and has been completed in 2019.
Electrification of Jind–Sonipat branch line is also under planning.
Electrification of Bathinda-Firozpur branch line is in progress.
The construction of Bathinda-Firozpur single line electrification is in under progress.
Sheds
Shakurbasti has a diesel loco shed. It houses WDS-4A, WDS-4B, WDS-4D, WDM-2 WDM3A, WDS6 and DEMUs. It also has a broad-gauge trip shed for WDM-2 and WDG-3A locos. WDS-4 shunting locos based all over Northern Railway are sent here for periodical maintenance.[11]
Work for a new line from Rohtak to Hansi via Meham was inaugurated in 2013.[14]
A new line from Jind to Sonipat was completed in 2015 and is operational now.
Central Government approved a new rail line from Jind to Hansi via Narnaund.
Railway reorganisation
Southern Punjab Railway was taken over by the state and merged with North Western Railway in 1930.[15]
With the partition of India in 1947, North Western Railway was split. While the western portion became Pakistan West Railway, and later Pakistan Railways, the eastern part became Eastern Punjab Railway.[16]