The Andal–Sainthia branch line was built in 1913.[1]
Branch lines
There are two branch lines in this section. The first is the Andal–Barabani–Sitarampur section.[2] The other is the Bhimgara–Palasthali branch line. Service on this line was suspended for safety reasons. The track became unfit because of unauthorized mining under the track.[3]
Electrification
Electrification of Andal–Pandabeshwar section was completed in 2010–11.[4] Electrification of the Pandabeshwar-Sainthia section was sanctioned in the rail budget for 2011–12, which is expected to be completed until 2013 and completed in 2016.[5]