The line runs from Flinders Street station in central Melbourne to Williamstown station in the inner west, serving 12 stations via Footscray, Yarraville, and Newport.[2] The line operates for approximately 19 hours a day (from approximately 5:00 am to around 12:00 am) with 24-hour service available on Friday and Saturday nights. During peak hours, the line operates with headways of up to 20 minutes, ensuring frequent service for commuters. During off-peak hours, the service intervals are adjusted to provide service every 20–30 minutes, accommodating the lower demand.[3] Trains on the Williamstown Line run with two three-car formations of Comeng, Siemens Nexas, and X'Trapolis 100 trainsets.[4]
Together with the Southern Cross to Sunbury portion of the Deniliquin railway line, it is the first and oldest government-built line in Victoria, having opened on 13 January 1859.[5] The line was built to serve the port at Williamstown, giving it economic importance to the then-colony as it established itself as an important international passenger port.[5] The line has played an important part in the development of Victoria's railways, with the first workshops opening along the line in the 1800s.[6]
Since the 2010s, due to the heavily utilised infrastructure of the Williamstown line, improvements and upgrades have been made. Works have included replacing sleepers, upgrading signalling technology, the removal of level crossings, the introduction of new rolling stock, and station accessibility upgrades.[7]
History
19th century
The original Williamstown Workshops in 1870.
Railway (Nelson) Pier in Williamstown, 1883
Breakwater Pier, Williamstown was one of three piers connected directly to the railway line, 1890.
Construction of the line was started by the Melbourne, Mount Alexander, and Murray River Railway Company (MMA&MRR) with the construction of Batman Hill (now Southern Cross) station in 1853. Interestingly, the station did not see a train for another 6 years till services began in 1857.[5] In response to 12 months of inaction by the MMA&MRR and pressure from the government and financial backers, the company organised a gala event at Williamstown on 12 June 1854.[8]
Recognising the challenges faced by private companies and the pressing need for railway development, the government took action to address the situation. On 19 March 1856, despite only small sections being completed, the government intervened and acquired the line, assuming responsibility for its construction and further development.[8]
In 1858, the Williamstown Workshops opened for the assembly of engines and carriages imported from England. Other buildings were soon added, with a total of seven locomotives built.[6] During the late 1880s when railway management described the workshops as inadequate, moves were made to construct new workshops at Newport. By 1889 the new shops were open and Williamstown was closed.[9][10]
Although it is now operated as a branch from the main Werribee/Geelong line at Newport, the line was originally built from the city with the Geelong line being the branch. The line officially opened in January 1859, but the section between the Newport Workshops and Williamstown Pier was in use by Geelong-line trains from October 1857 as it provided a connection to the ferry services departing from the pier.[11] From Williamstown Pier, passengers could connect to a ferry across Hobsons Bay to Port Melbourne.[11]
20th century
In August 1920, the line was fully electrified from North Melbourne to the Williamstown Pier. Later in 1927, the section from South Kensington to Footscray received three-position signalling with further extensions of the three position signalling occurring in 1929 and 1997.[9]
Due to the proximity to the nearby wharf facilities, the Williamstown line provided a vital connection between Melbourne and the freight and passenger facilities at the port provided. The railway was built to serve the Government port at Williamstown, giving it great economic importance to the Colony of Victoria and establishing its role as an international passenger port.[9]
The Newport Workshops in Victoria have played a significant role in the railway system, highlighting their importance through various expansion initiatives. Notable expansions took place from 1905 to 1915 and again from 1925 to 1930.[12] At the peak of operation it was one of Victoria's largest and best-equipped engineering establishments, with up to 5,000 employees on site.[13] The workshops had their own cricket grounds, and the game of Trugo is said to have been invented by workers on their lunch hour in the 1920s.[14] In the late 1980s, the original segments of the workshops were removed from everyday use with modern workshops built along the eastern side of the site, which remains in use today.[15]
The only section of the line to have closed was the Williamstown to Williamstown Pier section which closed in March 1987.
In January 2021, a major timetable rewrite resulted in increased frequencies and weekend daytime shuttle services being extended from Newport to Flinders Street.[16] Peak hour weekday services now stop at South Kensington, which simplifies stopping patterns on the Werribee and Sunbury lines.[16]
Future
Level crossing removals
The Level Crossing Removal Project has announced the removal of 3 level crossings on the Williamstown line, to be completed in stages from 2021 to 2030. In 2021, one level crossing was removed at Ferguson Street in Williamstown.[7] The crossing was removed by lowering the rail line onto a rail trench under the road, with the adjacent North Williamstown station also being lowered.[7] A final two crossings will be removed along the line by 2030. The crossing at Hudsons Road in Spotswood will be removed by elevating the rail line above the road with Spotswood station also being rebuilt as part of the project.[17] The crossing at Anderson Street, Yarraville, will be closed off as part of other level crossing removal works.[17] At the end of these works, the Williamstown line will have 1 remaining crossing at Giffard St in Williamstown that is not scheduled for removal.
Network reconfiguration
When the new cross-city rail corridor being built by the Metro Tunnel opens in 2025 there will be a reorganisation of the Melbourne rail network.[18] The Victorian Department of Transport and Planning plans to return the Frankston line to the City Loop, with dedicated use of the Caulfield group tunnel track.[19] This will mean Frankston line trains will no longer through-run with Werribee and Williamstown line trains, and will again stop at City Loop stations Flagstaff, Melbourne Central and Parliament.[19] As part of the reconfiguration, the Werribee and Williamstown lines would instead begin through-running services to Sandringham for the first time.[19]
Network and operations
Services
Services on the Williamstown line operate from approximately 5:00 am to around 12:00 am daily.[20] In general, during peak hours, train frequency is 10 minutes while services during non-peak hours drop to 20–40 minutes throughout the entire route.[3] Services do not run through the City Loop, instead terminating at Flinders Street.[21] Rather than running through the City Loop, services continue onto the Frankston line with boosted frequencies in combination with the Werribee line.[22] During periods with low patronage, shuttle services operate between Newport and Williamstown operate in the evenings, weekend mornings, and as part of the Night Network. Night Network operates on Friday nights and weekends, with services running 24 hours a day with 60-minute frequencies available outside of normal operating hours.[23]
Train services on the Williamstown line are also subjected to maintenance and renewal works, usually on selected Fridays and Saturdays. Shuttle bus services are provided throughout the duration of works for affected commuters.[24]
Stopping patterns
Legend — Station status
◼ Premium Station – Station staffed from first to last train
◻ Host Station – Usually staffed during morning peak, however this can vary for different stations on the network.
Legend — Stopping patterns Services do not operate via the City Loop
The Williamstown line has had a total of 8 operators since its opening in 1859. The first section of the line from near Newport to Williamstown Pier was originally opened by the government in 1857 and used by the Geelong and Melbourne Railway Company (G&MR) until the remainder of the government line to Spencer Street (now Southern Cross) opened 2 years later in 1859. This was operated by the government under the newly formed Victorian Railways (VR) using the full length from Williamstown Pier to Spencer Street (G&MR then used the VR line from Newport to Spencer Street). Many operators throughout its history have been government run. From its government acquisition in 1856 until the 1999 privatisation of Melbourne's rail network, four different government operators have run the line.[26] These operators, Victorian Railways, the Metropolitan Transit Authority, the Public Transport Corporation, and Bayside Trains have a combined operational length of 141 years.
Bayside Trains was privatised in August 1999 and later rebranded M>Train. In 2002, M>Train was placed into receivership and the state government regained ownership of the line, with KPMG appointed as receivers to operate M>Train on behalf of the state government.[27][28][29] Two years later, rival train operator Connex Melbourne took over the M>Train operations including the Williamstown line. Metro Trains Melbourne, the current private operator, then took over the operations in 2009. The private operators have had a combined operational period of 26 years.[30]
Past and present operators of the Williamstown line:
The Williamstown line forms a mostly straight route from the Melbourne central business district to its terminus in Williamstown. The route is 16.2 kilometres (10.1 mi) long and is fully doubled tracked from Flinders Street to its terminus (excluding Williamstown station where the track narrows to one track at the single platform). After changing from Frankston services at Flinders Street, the Williamstown line traverses flat country with few curves and minimal earthworks for most of the line. Some sections of the line have been elevated or lowered to remove level crossings, including at Williamstown North station. There is only one crossing remaining on the line which is not scheduled to be removed.[7]
The line follows the same alignment as the Werribee line with the two services splitting onto different routes at Newport. The Williamstown line continues its southern alignment, whereas the Werribee line takes a western alignment towards their final destinations.[31] Most of the rail line goes through built-up suburbs and heavy industrial areas.[31]
Stations
The line serves 12 stations across 16.2 kilometres (10.1 mi) of track. The stations are a mix of elevated, lowered, and ground level designs. The many elevated and lowered stations being constructed as part of level crossing removals.[32] From 2030, Spotswood station will be elevated as part of additional level crossing removal works.[33]
The Williamstown line uses diverse types of electric multiple unit (EMU) trains that are operated in a split six-car configuration, with three doors per side on each carriage. The primary rolling stock featured on the line is the Comeng EMUs, built by Commonwealth Engineering between 1981 and 1988.[36] These train sets are the oldest on the Melbourne rail network and subsequently will be replaced by the mid 2030s.[37]Siemens Nexas EMUs are also widely featured on the line, originally built between 2002 and 2005. These train sets feature more modern technology than the Comeng trains.[38] The final type of rolling stock featured on the line is the X'Trapolis 100 built by Alstom between 2002 and 2004 as well as between 2009 and 2020.[39] All of these rolling stock models are widely used on other lines across the metropolitan network and work as the backbone of the network.
Alongside the passenger trains, Williamstown line tracks and equipment are maintained by a fleet of engineering trains. The four types of engineering trains are: the shunting train; designed for moving trains along non-electrified corridors and for transporting other maintenance locomotives, for track evaluation; designed for evaluating track and its condition, the overhead inspection train; designed for overhead wiring inspection, and the infrastructure evaluation carriage designed for general infrastructure evaluation.[40] Most of these trains are repurposed locomotives previously used by V/Line, Metro Trains, and the Southern Shorthaul Railroad.[40]
From the middle of 2020s, the next generation of the X'Trapolis family of electric EMUs—the X'Trapolis 2.0—will be introduced. This new model will fully replace the existing fleet of Comeng EMUs currently operating on the line currently with new, modern, and technologically advanced trains. The new trains will feature:[41]
Modernised doors to reduce the boarding times at stations to under 40 seconds
In compliance with the Disability Discrimination Act of 1992, all stations that are new-built or rebuilt are fully accessible and comply with these guidelines.[42] The majority of stations on the corridor are fully accessible, however, there are some stations that have not been upgraded to meet these guidelines.[43] These stations do feature ramps, however, they have a gradient greater than 1 in 14.[43] Stations that are fully accessible feature ramps that have a gradient less than 1 in 14, have at-grade paths, or feature lifts.[43] These stations typically also feature tactile boarding indicators, independent boarding ramps, wheelchair accessible myki barriers, hearing loops, and widened paths.[43][44]
Projects improving station accessibility have included the Level Crossing Removal Project, which involves station rebuilds and upgrades and other individual station upgrade projects.[45][46] These works have made significant strides in improving network accessibility, with more than 75% of Williamstown line stations classed as fully accessible. This number is expected to grow within the coming years with the completion of level crossing removal works on the corridor by 2029.[47]
Signalling
The Williamstown line uses three position signalling which is widely used across the Melbourne train network.[48] Three position signalling was first introduced in 1927, with the last section of the line converted to the new type of signalling in 1997.[49]
References
^"Williamstown Line". Public Transport Victoria. Archived from the original on 7 September 2018. Retrieved 5 May 2023.
^ ab"3.4.3 Railway Workshops"(PDF). Hobsons Bay Heritage Study – Volume 1b: Thematic Environmental History. Hobsons Bay City Council. October 2003. Archived from the original(PDF) on 24 May 2009. Retrieved 17 November 2008.
^ abcdVictoria’s Big Build (24 February 2023). "Ferguson Street, Williamstown". Victoria’s Big Build. Archived from the original on 24 October 2022. Retrieved 28 April 2023.
^"3.4.3 Railway Workshops"(PDF). Hobsons Bay Heritage Study – Volume 1b: Thematic Environmental History. Hobsons Bay City Council. October 2003. Archived from the original(PDF) on 24 May 2009. Retrieved 17 November 2008.
^ abcPlanning, Department of Transport and Planning. "Transport strategies and plans". dtp.vic.gov.au. Archived from the original on 12 February 2023. Retrieved 7 February 2023.
^"archive.ph". archive.ph. Archived from the original on 8 September 2012. Retrieved 6 February 2023.{{cite web}}: CS1 maint: bot: original URL status unknown (link)
^Victoria’s Big Build (17 October 2022). "Urban design framework". Victoria’s Big Build. Archived from the original on 3 January 2023. Retrieved 3 January 2023.
1999 single by S Club 7 For the song by Mica Paris, see Whisper a Prayer. Two in a MillionSingle by S Club 7from the album S Club A-sideYou're My Number OneB-sideWe Can Work It OutReleased13 December 1999 (1999-12-13)[1]StudioStarGate (Norway)Length3:34LabelPolydorSongwriter(s)Cathy DennisSimon EllisProducer(s)StarGateS Club 7 singles chronology S Club Party (1999) Two in a Million / You're My Number One (1999) Reach (2000) Music videoTwo in a Million on YouTube Two in ...
مغن تسمية الإناث مغنية فرع من منشد، وموسيقي المجال غناء تعديل مصدري - تعديل المغني أو المغنية هو الشخص الذي يستخدم صوته/صوتها لإنتاج موسيقى. عادة يرافق المغني موسيقيين وآلات موسيقية. في القاموس مُغَنّ، الْمُغَنِّيٌ هو اسم فاعل من غنَّى ويعني مُطرِب، محترف...
Ekliptika adalah jalur yang dilalui oleh suatu benda dalam mengelilingi suatu titik pusat sistem koordinat tertentu. Ekliptika pada benda langit merupakan suatu bidang edar berupa garis khayal yang menjadi jalur lintasan benda-benda langit dalam mengelilingi suatu titik pusat sistem tata surya. Seandainya bumi dijadikan sebagai titik pusat sistem koordinat, maka ekliptika merupakan bidang edar yang dilalui oleh benda-benda langit seperti planet dan matahari untuk mengelilingi bumi. Dan bila ...
Halaman ini berisi artikel tentang perusahaan perangkat lunak. Untuk kegunaan lain, lihat Intuit (disambiguasi). Intuit Inc.JenisUmumKode emitenNasdaq: INTUS&P 500 ComponentIndustriPerangkat lunak komputerDidirikanPalo Alto, California (1983)PendiriScott Cook, Tom ProulxKantorpusatMountain View, California, ASTokohkunciTom Proulx, pengembang awalBrad Smith, CEOProdukKeuangan pribadi, perangkat lunak akuntansi dan kembalian pajakPendapatan $4,86 miliar USD (2010)Karyawan8,700Situs web...
فيليرا خريطة الموقع تقسيم إداري البلد اليونان [1] عاصمة لـ أريانا، رودوبي التقسيم الأعلى أريانا، رودوبي خصائص جغرافية إحداثيات 41°07′00″N 25°38′00″E / 41.11666667°N 25.63333333°E / 41.11666667; 25.63333333 الارتفاع 90 متر السكان التعداد السكاني 827 (resident population of...
Artikel ini sebatang kara, artinya tidak ada artikel lain yang memiliki pranala balik ke halaman ini.Bantulah menambah pranala ke artikel ini dari artikel yang berhubungan atau coba peralatan pencari pranala.Tag ini diberikan pada Februari 2023. US Ben GuerdaneBerkas:US Ben Guerdane logo.pngNama lengkapUnion sportive de Ben GuerdaneBerdiriMarch 1, 1936StadionStade du 7 MarsBen Gardane, Tunisia(Kapasitas: 10,000)Ketua Jlidi El OrfManajer Hakim AounLigaCLP-12022/23ke-5 Kostum kandang Kostum tan...
Events at the1995 World ChampionshipsTrack events100 mmenwomen200 mmenwomen400 mmenwomen800 mmenwomen1500 mmenwomen5000 mmenwomen10,000 mmenwomen100 m hurdleswomen110 m hurdlesmen400 m hurdlesmenwomen3000 msteeplechasemen4 × 100 m relaymenwomen4 × 400 m relaymenwomenRoad eventsMarathonmenwomen10 km walkwomen20 km walkmen50 km walkmenField eventsHigh jumpmenwomenPole vaultmenLong jumpmenwomenTriple jumpmenwomenShot putmenwomenDiscus throwmenwomenHammer throwmenJavelin throwmenwomenCombined ...
American actor (born 1962) For the baseball player, see Matt Broderick. Matthew BroderickBroderick in 2022Born (1962-03-21) March 21, 1962 (age 62)New York City, U.S.OccupationActorYears active1981–presentSpouse Sarah Jessica Parker (m. 1997)Children3ParentsJames BroderickPatricia BroderickRelativesMilton H. Biow (grandfather)Adet Lin (aunt) Matthew Broderick (born March 21, 1962)[1] is an American actor. His roles include the Golden ...
County in North Dakota, United States County in North DakotaCass CountyCountyCass County Courthouse in FargoLocation within the U.S. state of North DakotaNorth Dakota's location within the U.S.Coordinates: 46°56′N 97°15′W / 46.93°N 97.25°W / 46.93; -97.25Country United StatesState North DakotaFounded1873Named forGeorge Washington CassSeatFargoLargest cityFargoArea • Total1,768 sq mi (4,580 km2) • Land1,765 s...
Questa voce sull'argomento stagioni delle società calcistiche italiane è solo un abbozzo. Contribuisci a migliorarla secondo le convenzioni di Wikipedia. Segui i suggerimenti del progetto di riferimento. Voce principale: Società Sportiva Dilettantistica Trento Calcio 1921. Nuovo Calcio TrentoStagione 2001-2002Sport calcio Squadra Trento Allenatore Claudio Terzulli poi Luciano Miani Presidente Piergiorgio Chini Serie C216º nel girone B. Maggiori presenzeCampionato: Rotili (34) M...
You can help expand this article with text translated from the corresponding article in German. (February 2023) Click [show] for important translation instructions. View a machine-translated version of the German article. Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikip...
Érudit à sa table de travailArtiste RembrandtDate 1641Type PortraitMatériau huile sur panneau de bois (d)Dimensions (H × L) 105,7 × 76,4 cmPendant Jeune Fille au cadreMouvement Âge d'or de la peinture néerlandaiseNo d’inventaire ZKW 3905Localisation Palais royal de Varsovie, Munich Central Collecting Pointmodifier - modifier le code - modifier Wikidata L'Érudit au pupitre ou Savant à sa table de travail (ou encore Le Père de la mariée juive) est un tableau...
Cet article est une ébauche concernant une chronologie ou une date et l’Alberta. Vous pouvez partager vos connaissances en l’améliorant (comment ?) selon les recommandations des projets correspondants. Chronologie de l'Alberta ◄◄ 2010 2011 2012 2013 2014 2015 2016 2017 2018 ►► Chronologies Données clés 2011 2012 2013 2014 2015 2016 2017Décennies :1980 1990 2000 2010 2020 2030 2040Siècles :XIXe XXe XXIe XXIIe XXIIIeMillénai...
2014 Asian Cycling ChampionshipsVenue Astana, KazakhstanDate(s) (2014-05-21 - 2014-06-01)21 May – 1 June 2014VelodromeSaryarka Velodrome← 20132015 → The 2014 Asian Cycling Championships took place at the Saryarka Velodrome in Astana and Karaganda, Kazakhstan from 21 May to 1 June 2014. Medal summary Road Men Event Gold Silver Bronze Individual road race Ruslan Tleubayev Kazakhstan Maxim Iglinskiy Kazakhstan Dmitriy Gruzdev Kazakhstan Individual time...
У этого топонима есть и другие значения, см. Берлин. Оккупированные сектора БерлинаВосточный Берлинангл. East Berlinфр. Berlin-Estнем. Ost-Berlin Флаг Восточного Берлина Герб Восточного Берлина Четыре сектора оккупации Берлина ← → 1949 — 1990 Площадь 409 км² Население 1 279 2...
يفتقر محتوى هذه المقالة إلى الاستشهاد بمصادر. فضلاً، ساهم في تطوير هذه المقالة من خلال إضافة مصادر موثوق بها. أي معلومات غير موثقة يمكن التشكيك بها وإزالتها. (يونيو 2023) هذه المقالة يتيمة إذ تصل إليها مقالات أخرى قليلة جدًا. فضلًا، ساعد بإضافة وصلة إليها في مقالات متعلقة بها. ...
This article may need to be rewritten to comply with Wikipedia's quality standards. You can help. The talk page may contain suggestions. (August 2023)This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Neela goddess – news · newspapers · books · scholar · JSTOR (August 2023) (Learn how and when to remove th...
غيلبرتس الإحداثيات 42°06′02″N 88°21′58″W / 42.1006°N 88.3661°W / 42.1006; -88.3661 [1] تاريخ التأسيس 1890 تقسيم إداري البلد الولايات المتحدة[2] التقسيم الأعلى مقاطعة كين خصائص جغرافية المساحة 5.54 ميل مربع ارتفاع 902 قدم عدد السكان عدد السكان 8366 ...
Varian biskuit dari Amerika (kiri) dan Inggris (kanan). Biskuit adalah produk jajanan renyah yang terbuat dari tepung terigu dan tambahan bahan makanan lain dengan cara dipanggang (kue kering). Biskuit memiliki istilah yang berbeda-beda di berbagai wilayah di dunia. Asal kata 'biskuit' atau ‘biscuit’ (dalam Bahasa Inggris) berasal dari Bahasa Latin, yaitu bis coctus yang berarti dimasak dua kali. Di Amerika, biskuit populer dengan sebutan cookie, yang berarti kue kecil yang dipanggang ata...
Мисс Земля 2006 Хиль Эрнандес, победительница Мисс Земля 2006 Дата 26 ноября, 2006 года Ведущие Ариэль УретаПрисилла МейреллисДжинджер Конежеро Интервал-акт Кристиан Баутиста Место проведения Национальный музей Филиппин, Манила, Филиппины Телеканал ABS-CBNThe Filipino ChannelStar World Итого...