The line operates for approximately 19 hours a day (from approximately 5:00 am to around 12:00 am) with 24-hour service available on Friday and Saturday nights. During peak hour, headways of up to 7.5 minutes are operated with services every 10–30 minutes during off-peak hours.[2] Trains on the Mernda line run with two three-car formations of X'Trapolis 100 trainsets.[3]
Services on the line began in 1889 when the section between North Fitzroy (on the now-closed Inner Circle line) and Reservoir was opened, which was extended to Whittlesea in the same year. The line was closed beyond Lalor in November 1959, while the remainder of the line was electrified. The closed section has since been gradually reconstructed and reopened; to Epping in 1964, South Morang in April 2012, and to Mernda in August 2018.
Since the 2010s, due to the heavily utilised infrastructure of the Mernda line, significant improvements and upgrades have been made. Two major upgrades of the corridor have taken place, with the line from Epping extended to South Morang in April 2012, duplicated between Keon Park and Epping, and extended again to Mernda in August 2018.[4][5] Other works have included replacing sleepers, upgrading signalling technology, the introduction of new rolling stock, the removal of level crossings, and station accessibility upgrades.[6]
History
19th century
The early beginning of the Mernda line opened on 8 October 1889, as part of railway extensions into the northern suburbs. What became known as the Inner Circle line was opened from Spencer Street station (now Southern Cross station) via Royal Park station, to a station called Collingwood (now called Victoria Park), and then on to Heidelberg.[7] The Epping line branched off at Fitzroy North to Preston-Reservoir station (later renamed Reservoir) in 1889, with the line extended to Whittlesea a few months later, on 23 December.[8]
20th century
Trains on the line operated via Fitzroy and the Inner Circle, until the opening of the current connection between Victoria Park and Princes Bridge stations in 1901. Passenger services were operated in two tiers: a local train to Preston-Reservoir station via Clifton Hill, and a country-bound mixed train to Whittlesea, via Fitzroy.[9] The Epping line was electrified to Reservoir in 1921, with an AEC railmotor providing a shuttle service between Reservoir and the terminus at Whittlesea. Preston-Reservoir station was renamed Reservoir in 1909.[10][11]
The line had a number of Rail Motor Stopping Places along the line, these being a mere nameboard beside the railway line at a public access point. The first were RMSP 8, 9, and 10, which opened on 10 May 1927; followed by Epping Quarries Siding RMSP in January 1928; RMSP 17 in March 1928; RMSP 26 in January 1930; RMSP 33 in July 1932; RMSP 39 in July 1941; and RMSP 77 in October 1949, which was renamed Lalor station in 1952.[9] Direct trains to Whittlesea from Flinders and Spencer streets were withdrawn from 1948.[12]
Electrification was extended along 4.4 kilometres (2.7 mi) of single track to Thomastown in 1929, paid for by a land developer, who paid for the works, as well as guaranteeing against operating losses.[9]Keon Park station was opened at the same time, but the Whittlesea shuttle train continued to connect with suburban trains at Reservoir, until 1931. Goods trains to Whittlesea were withdrawn in 1955, and goods trains from Epping ended in 1958.[12]
Electric suburban services were extended to Lalor station in November 1959, in addition to the duplication of the line from Reservoir to Keon Park, services beyond this point (to Whittlesea) were replaced by a bus service, subsequently closing the remaining section of the line.[13][14][15] The line to Epping itself was reopened and electrified in 1964, with the remaining line dismantled in the 1970s.[12] However, the right-of-way beyond Epping was retained to allow future expansion of the rail corridor.[16]
21st century
South Morang extension
Proposals for the duplication of the line between Keon Park and Epping have dated as far back as 1974.[17] In 1983, Whittlesea Council made a submission to the Victorian Government supporting the duplication of the line.[18] Following the election of the Bracks Government in 1999, a promise was made to restore the service to South Morang, along the former right-of-way by 2003.[19] In 2003, a Trainlink bus service was introduced from Epping to South Morang, meeting every train, but the 2005 Meeting Our Transport Challenges plan postponed construction of the railway until 2021.[19] The restoration of the railway to Mernda was also identified in the Strategic Transportation Study, undertaken by the City of Whittlesea in 2002. In the 2008 State Budget, $10 million was earmarked for planning work on the four-kilometre extension, in addition, to design work for the duplication between Keon Park and Epping stations.[19]
On 1 May 2009, the State Government announced that they had committed $562.3 million in the 2009 State Budget for the extension of the line to South Morang, covering capital and construction works. Construction would begin the following year in 2010 and was to be completed by 2013.[4][20] Major construction commenced in October 2010, with works including:[4][21]
The duplication of the 5 km (3.1 mi) of existing single track between Keon Park and Epping
The construction of 3.5 kilometres (2.2 mi) of new double track from Epping to South Morang
A rebuilt South Morang station with a bus interchange, 450 car parking spaces, and 29 protected bike spaces
A rebuilt Thomastown station with a second platform and a pedestrian overpass
The upgrade and expansion of the Epping train maintenance facility
The construction of a new shared use path between Epping and South Morang
The double track between Keon Park and Epping was commissioned on 28 November 2011. A shared use path was opened to the public on 5 February 2012. The three-metre wide path runs the length of the rail extension and provides connections between the existing bicycle network, through to South Morang station. Finally, the extension to South Morang opened on 2 April 2012. No level crossings were built on the new section of the track, with road overpasses provided at Cooper Street, Pindari Avenue, and Civic Drive.[4]
Mernda extension
Proposals for an extension to Mernda have dated as far back as 1974.[17] In 1983, Whittlesea Council made a submission to the Victorian Government to extend the Epping line to South Morang and Mernda.[18] After many years of extensive community activism, the Andrews government announced in the 2015 State Budget that $9 million was to be allocated to plan the 8-kilometre (5 mi) extension of the line to Mernda, with construction commencing in 2016. The announcement included:[5]
The 8-kilometre (5 mi) line to be fully double tracked
Completely grade separated through a combination of rail bridges and underpasses, with more than 86% of the rail line being built at ground level
The construction of two new stations (Mernda and Middle Gorge) with an option for an additional one (Hawkstowe) (all three were constructed)[22]
All three stations included bike and car parking as well as bus interchanges
A new shared use path, connecting to the one constructed at South Morang as part of the South Morang rail extension
Construction began in 2016, with the stations opening six months early on 26 August 2018.[23][24] Prior to the lines official opening, a community open day was held to promote the new stations to the local residents.[25]
Future
Level Crossing Removals
The Level Crossing Removal Project has removed 6 level crossings on the line, completed in stages from 2019 to 2024. In 2019, the level crossing at High Street, Reservoir was removed by building a rail bridge over the road, along with Reservoir station being rebuilt.[26] In 2022, Bell station and Preston station were both rebuilt with an elevated rail bridge connecting them to remove four crossings, one each at Bell Street, Cramer Street, Murray Road, and Oakover Road.[27][28][29][30] The level crossing at Keon Parade was removed in 2024 by constructing a rail bridge over the road and rebuilding Keon Park station.[31] The Mernda line has 12 remaining level crossings that are not yet proposed for removal.[32]
The 2012 Network Development Plan identified the need for a new tunnel connecting the Mernda line to the Werribee line and possibly also the Geelong line.[33] The tunnel would run from Clifton Hill, potentially include a new stop somewhere in the inner north, before connecting with Parkville, Flagstaff, and Southern Cross stations.[34] Exiting the CBD, the line would continue in a tunnel stopping at a new station in the suburb of Fishermans Bend, before crossing underneath the Yarra River and arriving at Newport station.[34] The line would then exit the tunnel and travel further west to connect with the Werribee and Geelong lines.[34] The Werribee and Williamstown lines would be reconfigured to provide better and simpler service.[34][35] This project was initially meant to be completed in the 2020s, however, no funding or planning has taken place, with the revised Victorian Rail Plan stating that the project would be completed under Stage 6 of the plan.[36]
Wollert extension
Highlighted in the 2018 Victorian Rail Plan, a proposal exists for a spur line to be constructed to the suburb of Wollert, at a cost of up to $300 million.[37] The line would branch off the Mernda line after Lalor station, with new stations at the Pacific Epping shopping centre, and in the suburbs of Epping, Aurora and Wollert.[38][36] In addition to the new stations, the corridor would be fully grade separated from opening, with the line featuring two tracks, and modern, fully wheelchair accessible stations. In 2017, the State Government announced the acquisition of 6 properties valued at $3.8 million for a future rail corridor.[39] The $3.8 million was sourced from a 'statewide developers' contribution fund. Since the 2017 acquisitions, there has been little planning developments, with only a small amount of attention given by the local residents, council, and some political parties.[40]
Network and operations
Services
Services on the Mernda line operate from approximately 5:00 am to around 12:00 am daily.[41] In general, during peak hours, train frequency is 7–10 minutes in the AM peak on the Mernda line while during non-peak hours the frequency is reduced to 20–30 minutes throughout the entire route.[2] Frequencies are doubled between Flinders Street and Clifton Hill in conjunction with the Hurstbridge line. On Friday nights and weekends, services run 24 hours a day, with 60-minute frequencies available outside of normal operating hours.[42]
Train services on the Mernda line are also subjected to maintenance and renewal works, usually on selected Fridays and Saturdays. Shuttle bus services are provided throughout the duration of work for affected commuters.[43]
Stopping patterns
Legend — Station status
◼ Premium Station – Station staffed from first to last train
◻ Host Station – Usually staffed during morning peak, however this can vary for different stations on the network.
Legend — Stopping patterns Some services do not operate via the City Loop
● – All trains stop
◐ – Some services do not stop
▲ – Only inbound trains stop
▼ – Only outbound trains stop (trains operate clockwise through the city loop all day)
The Mernda line has had a total of 6 operators since its opening in 1888. The majority of operations throughout its history have been government-run: from its first service in 1888 until the 1999 privatisation of Melbourne's rail network, four different government operators have run the line.[45] These operators, Victorian Railways, the Metropolitan Transit Authority, the Public Transport Corporation and Hillside Trains have a combined operational length of 111 years. Hillside Trains was privatised in August 1999 and later rebranded Connex Melbourne. Metro Trains Melbourne, the current private operator, then took over the operations in 2009. Both private operators have had a combined operational period of 25 years.[46]
Interactive map of the Mernda line in northern Melbourne
The Mernda line forms a relatively linear route from the Melbourne central business district to its terminus in Mernda. The route is 33.1 kilometres (20.6 mi) long and is double track the entire way from Flinders Street to its termnius. The only underground section of the Mernda line is in the City Loop, where the service stops at 3 underground stations.[47] Exiting the city, the Mernda line traverses mainly flat country with few curves and fairly minimal earthworks for most of the line. Despite the otherwise fairly straight line, it does include Melbourne's sharpest railway curve, between Rushall and Merri. This curve originally made up the third side of a triangular junction, connecting the two original branches from the now-closed North Fitzroy station.[48] Only this third leg of the triangle remains. Some sections of the line has been elevated or lowered into a cutting to eliminate level crossings.[49] Despite some removals, there are a number of level crossings still present with no current plans to remove them.
The line follows the same alignment as the Hurstbridge line with the two services splitting onto different routes at Clifton Hill. The Mernda line continues on its northern alignment, whereas the Hurstbridge line takes a north-eastern alignment towards its final destination of Hurstbridge station.[50] Most of the rail line goes through built-up suburbs and some industrial areas, but after Middle Gorge, the line gets into more sporadic suburbs and park lands.[50] This outer portion of the line is one of Melbourne's main growth corridors, which is rapidly replacing farmland with housing and commercial developments causing a rise in patronage.[51]
Stations
The line serves 29 stations across 33.1 kilometres (20.6 mi) of track. The stations are a mix of elevated, lowered, underground, and ground-level designs. Underground stations are present only in the City Loop, with the majority of elevated and lowered stations being constructed as part of level crossing removals or line extension projects.[52] From 2025, Keon Park station will be elevated as part of level crossing removal works.[31]
The Mernda line uses X'Trapolis 100electric multiple unit (EMU) trains operating in a two three-car configuration, with three doors per side on each carriage, and can accommodate up to 432 seated passengers in each six-car configuration.[56] The trains were originally built between 2002 and 2004 as well as between 2009 and 2020 with a total of 212 three-car sets constructed. The trains are shared with 7 other metropolitan train lines and have been in service since 2003.[56]
Alongside the passenger trains, Mernda line tracks and equipment are maintained by a fleet of engineering trains. The four types of engineering trains are: the shunting train; designed for moving trains along non-electrified corridors and for transporting other maintenance locomotives, for track evaluation; designed for evaluating track and its condition, the overhead inspection train; designed for overhead wiring inspection, and the infrastructure evaluation carriage designed for general infrastructure evaluation.[57] Most of these trains are repurposed locomotives previously used by V/Line, Metro Trains, and the Southern Shorthaul Railroad.[57]
Accessibility
In compliance with the Disability Discrimination Act of 1992, all stations that are new-built or rebuilt are fully accessible and comply with these guidelines.[58] Just over half of the stations on the corridor are fully accessible, however, some stations haven't been upgraded to meet these guidelines.[59] These stations do feature ramps, however, they have a gradient greater than 1 in 14.[59] Stations that are fully accessible feature ramps that have a gradient less than 1 in 14, have at-grade paths, or feature lifts.[59] These stations typically also feature tactile boarding indicators, independent boarding ramps, wheelchair accessible myki barriers, hearing loops, and widened paths.[59][60]
Projects improving station accessibility have included the Level Crossing Removal Project, which involves station rebuilds and upgrades, and individual station upgrade projects.[61][62] These works have made significant strides in improving network accessibility, with more than 67% of Mernda line stations classed as fully accessible. Future station upgrade projects will continue to increase the number of fully accessible stations overtime.
Signalling
The Mernda line uses three-position signalling which is widely used across the Melbourne train network.[63] Three-position signalling was first introduced on the line in 1921, with the final section of the line converted to the new type of signalling during the extension of the line to Mernda in 2018.[23]
^ abcJack McLean (November 1995). "Reservoir – Whittlesea: Signalling and Safeworking". Newsrail. Australian Railway Historical Society (Victorian Division). pp. 333–337.
^Victoria’s Big Build (17 October 2022). "Urban design framework". Victoria’s Big Build. Archived from the original on 3 January 2023. Retrieved 3 January 2023.
Robert Aquilina (1999). The Whittlesea Railway – A brief history of the Fitzroy and Whittlesea railway 1889–1959 including current day operations. Self published.
DerailedPoster resmiSutradaraMikael HåfströmProduserLorenzo di BonaventuraSkenarioStuart BeattieBerdasarkanNovel Derailed oleh James SiegelPemeranClive OwenJennifer AnistonVincent CasselMelissa GeorgeAddison TimlinXzibitRZAPenata musikEd ShearmurSinematograferPeter BiziouPenyuntingPeter BoylePerusahaanproduksiMiramax FilmsDi Bonaventura Pictures[1]DistributorBuena Vista International (Britania Raya)The Weinstein Company (Amerika Serikat)Tanggal rilis11 November 2005 (2005...
Basilika Santo FransiskusBasilika Minor Santo FransiskusSpanyol: Basílica Menor de San Francisco en La Pazcode: es is deprecated Basilika Santo Fransiskus16°29′47″S 68°08′14″W / 16.4965°S 68.1373°W / -16.4965; -68.1373Koordinat: 16°29′47″S 68°08′14″W / 16.4965°S 68.1373°W / -16.4965; -68.1373LokasiLa PazNegaraBoliviaDenominasiGereja Katolik RomaSitus webwww.museosanfranciscobolivia.comSejarahDidirikan1549DedikasiSanto Fr...
Personalized fictional characters representing a consumer or user category Here, the illustration person called Femi is a persona used online A persona (also user persona, user personality, customer persona, buyer persona) in user-centered design and marketing is a personalized fictional character created to represent a user type that might use a site, brand, or product in a similar way.[1] Personas represent the similarities of consumer groups or segments. They are based on demograph...
Президентский штандарт на катере во время парада, Санкт-Петербург, 2020 год.Копия штандарта президента на Aurus Senat Limousine (41231SB). Символы президентской власти — предметы, которые являются официальными символами власти президента Российской Федерации. Символы президентско�...
Un même œuf de tortue peut donner un mâle ou une femelle en fonction de la température. La détermination du sexe, l'utilisation des gènes codant soit l'un soit l'autre, dépend donc d'un phénomène épigénétique[1]. L'épigénétique (mot-valise de épigenèse et génétique[2]) est la discipline de la biologie qui étudie la nature des mécanismes modifiant de manière réversible, transmissible (lors des divisions cellulaires) et adaptative l'expression des gènes sans en changer l...
European Parliament election in Sweden of 2014 2014 European Parliament election in Sweden ← 2009 25 May 2014 2019 → All 20 Swedish seats to the European ParliamentTurnout51.07% ( 5.54 pp)[1] First party Second party Third party Leader Marita Ulvskog Isabella Lövin Gunnar Hökmark Party Social Democrats Green Moderate Alliance S&D Greens/EFA EPP Last election 6 seats, 24.4% 2 seats, 11.0% 4 seats, 18.8% Seats won 5 4 3 Seat chang...
Dutton is a civil parish in Ribble Valley, Lancashire, England, located to the northeast of Ribchester. The parish is rural, with the River Ribble running to the south. It contains 15 buildings that are recorded in the National Heritage List for England as designated listed buildings. These mainly consist of houses with related structures, or farm buildings, but there are also a church, a bridge and two cross bases. Key Map all coordinates using OpenStreetMap Download coordinates as: KM...
The United Nations Educational, Scientific and Cultural Organization (UNESCO) World Heritage Sites are places of importance to cultural or natural heritage as described in the UNESCO World Heritage Convention, established in 1972.[1] Haiti accepted the convention on January 18, 1980, making its historical sites eligible for inclusion on the list. As of 2023, Haiti has only one World Heritage Site, National History Park – Citadel, Sans Souci, Ramiers, which was inscribed in 1982. ...
Climate chart for Anchorage Anchorage, Alaska (Dena'ina: Dgheyay Kaq'; Dgheyaytnu)[1] has a subarctic climate with the code Dsc according to the Köppen climate classification due to its short, cool summers.[2] The weather on any given day is very unpredictable. Some winters feature several feet of snow and cold temperatures, while the summers are typically mild but are cool compared to the contiguous US and interior Alaska. Because of Anchorage's high latitude, summer days a...
هذه المقالة يتيمة إذ تصل إليها مقالات أخرى قليلة جدًا. فضلًا، ساعد بإضافة وصلة إليها في مقالات متعلقة بها. (سبتمبر 2018) مارسيلو دوس سانتوس معلومات شخصية الميلاد 17 مارس 1979 (45 سنة)[1] جي بارانا مركز اللعب مهاجم الجنسية البرازيل معلومات النادي النادي الحالي سانت...
American politician (1833–1895) For the businessman Charles Sherwood, see Camillus Cutlery Company. Charles Daniel SherwoodDetail of an 1865 photo of the Minnesota State Senate showing Charles D. Sherwood.4th Lieutenant Governor of MinnesotaIn officeJanuary 11, 1864 – January 8, 1866GovernorStephen MillerPreceded byHenry Adoniram SwiftSucceeded byThomas H. Armstrong5th Speaker of the Minnesota House of RepresentativesIn office1863–1863Preceded byJared BensonSucceeded by...
High School in Bellville, Western Cape, South Africa Die Hoërskool D.F. MalanHoërskool D.F. Malan todayAddressFrans Conradie Drive, BostonBellville, Western CapeSouth AfricaCoordinates33°53′37″S 18°37′35″E / 33.8936°S 18.6265°E / -33.8936; 18.6265InformationSchool typePublic Semi-PrivateMottoVir jou Suid-Afrika(For you South Africa)Religious affiliation(s)ChristianityEstablished1954; 70 years ago (1954)School districtDistrict 4PrincipalS...
2006 film by Zack Snyder This article is about the 2006 film. For the 2014 sequel, see 300: Rise of an Empire. 300Theatrical release posterDirected byZack SnyderScreenplay by Zack Snyder Kurt Johnstad Michael B. Gordon Based on300by Frank MillerLynn VarleyProduced by Gianni Nunnari Mark Canton Bernie Goldmann Jeffrey Silver Starring Gerard Butler Lena Headey David Wenham Dominic West CinematographyLarry FongEdited byWilliam HoyMusic byTyler BatesProductioncompanies Legendary Pictures Virtual ...
Caliph of the Islamic StateJihadist flagIncumbentAbu Hafs al-Hashimi al-Qurashisince 3 August 2023Inaugural holderAbu Bakr al-BaghdadiFormation7 April 2013This is a list of leaders of the Islamic State since the establishment of the Islamic State of Iraq. List of leaders Emirs of the Islamic State of Iraq No. Portrait Name (Birth–Death) Time of Leadership Note(s) Announced Left office Time in office 1 Abu Omar al-Baghdadi حَمِيدُ دَاوُدَ مُحَمَّدُ خَلِيلِ...
2009 single by OneRepublicAll the Right MovesSingle by OneRepublicfrom the album Waking Up ReleasedSeptember 29, 2009 (2009-09-29)GenrePop rockLength3:58[1]Label Mosley Interscope Songwriter(s)Ryan TedderProducer(s) Ryan Tedder Andy Prickett Brent Kutzle OneRepublic singles chronology Come Home (2009) All the Right Moves (2009) Secrets (2009) Audio samplefilehelpMusic videoAll The Right Moves on YouTube All the Right Moves is the lead single by American band OneRepubli...
American baseball player (born 1949) Baseball player Enos CabellCabell in 2014Third baseman / First basemanBorn: (1949-10-08) October 8, 1949 (age 74)Fort Riley, Kansas, U.S.Batted: RightThrew: RightMLB debutSeptember 17, 1972, for the Baltimore OriolesLast MLB appearanceSeptember 29, 1986, for the Los Angeles DodgersMLB statisticsBatting average.277Home runs60Runs batted in596 Teams Baltimore Orioles (1972–1974) Houston Astros (1975–1980) San Francisco ...
Private college in Manhattan, New York Marymount Manhattan CollegeMottoTua Luce DirigeMotto in EnglishDirect Us By Thy LightTypePrivate collegeEstablished1936; 88 years ago (1936)Religious affiliationFormerly CatholicEndowment$18.1 million[1]PresidentPeter Naccarato (interim)Academic staff92 full-time facultyUndergraduates2,069 (2017)[2]LocationNew York, New York, U.S.40°46′7″N 73°57′35″W / 40.76861°N 73.95972°W / 40....
Questa voce sull'argomento centri abitati dell'Alta Francia è solo un abbozzo. Contribuisci a migliorarla secondo le convenzioni di Wikipedia. CourteuilcomuneCourteuil – Veduta LocalizzazioneStato Francia RegioneAlta Francia Dipartimento Oise ArrondissementSenlis CantoneSenlis TerritorioCoordinate49°12′N 2°32′E49°12′N, 2°32′E (Courteuil) Altitudine42 e 84 m s.l.m. Superficie5,31 km² Abitanti674[1] (2009) Densità126,93 ab./km² Altre inf...
Equation for fixed point of functional composition Not to be confused with Schrödinger's equation. Ernst Schröder (1841–1902) in 1870 formulated his eponymous equation. Schröder's equation,[1][2][3] named after Ernst Schröder, is a functional equation with one independent variable: given the function h, find the function Ψ such that ∀ x Ψ ( h ( x ) ) = s Ψ ( x ) . {\displaystyle \forall x\;\;\;\Psi {\big (}h(x){\big )}=s\Psi (x).} Schröder'...