Liverpool–Manchester lines

Liverpool to Manchester routes
A Northern Trains Class 156 leaving Mossley Hill station on the southern route
Overview
StatusOperational
OwnerNetwork Rail
LocaleCheshire
Greater Manchester
Merseyside
North West England
Termini
Stations38
Service
TypeHeavy rail
SystemNational Rail
Operator(s)East Midlands Railway
West Midlands Trains (London Northwestern Railway)
Northern Trains
Merseyrail
TransPennine Express
Transport for Wales
Avanti West Coast
Rolling stockClass 150 Sprinter
Class 156 Super Sprinter
Class 158 Express Sprinter
Class 185 Desiro
Class 195 Civity
Class 197 Civity
Class 222 Meridian (Limited)
Class 323
Class 331 Civity
Class 350 Desiro
Class 390 Pendolino
Class 397 Civity
Class 802
Technical
Number of tracksDouble-track
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
ElectrificationMk1/Mk3/UK1 and Series 2 25 kV 50 Hz AC OHLE Lime Street - Liverpool South Parkway. Lime Street - Manchester Piccadilly Northern Route and also Manchester Victoria
Route map

(Click to expand)
Liverpool Lime Street station, the terminus for both the northern and southern routes to Manchester.
Manchester Victoria station, the terminus for the northern Liverpool to Manchester route.
Manchester Piccadilly station, the terminus of both the northern and southern Liverpool to Manchester route.

There once were four direct railway routes between Liverpool and Manchester in the North West of England; only two remain, the two centre routes of the four. The most northerly and the most southerly of the four routes are no longer direct lines. Of the remaining two direct routes, the northern route of the two is fully electric, while the now southern route is a diesel-only line. The most northerly of the four has been split into two routes: the western section operated by Merseyrail electric trains and the eastern section by diesel trains, requiring passengers to change trains between the two cities. The fourth route, the most southerly of the four, has been largely abandoned east of Warrington; the remaining section caters mainly for freight trains.

The remaining two direct routes are:

Northern route (Chat Moss line)

1869 map showing the northern route

The northern route runs from Liverpool Lime Street station, via Earlestown and Newton-le-Willows, and continues to either Manchester Victoria or Manchester Piccadilly. The line follows George Stephenson's original 32-mile (51.5 km) Liverpool and Manchester Railway of 1830, which was the world's first inter-city passenger railway and the first to have run 'scheduled' services. Many early steam locomotives were initially used on this line including Stephenson's Rocket, which won the Rainhill Trials in 1829 (see List of Liverpool and Manchester Railway locomotives). The line also includes a number of listed structures including stations and bridges, particularly the Rainhill Skew Bridge and the nine-arch Sankey Viaduct.

Current services

Following completion of electrification in May 2015, services to Manchester Airport and Manchester Victoria are operated by Class 323 3-car electric multiple units and Class 331 3-car and 4-car electric multiple units.

Northern operate two trains per hour on the Chat Moss line, an hourly all-stops service from Liverpool Lime Street to Manchester Airport operated by Class 323 and 331 EMUs and an hourly service from Chester to Leeds via Bradford Interchange which calls at Earlestown and Newton-le-Willows, operated by Class 195 diesel multiple units.

During weekday peak times, two daily return trains operate between Liverpool Lime Street and Manchester Victoria, one service in the morning and one in the evening, calling at all stations. Six daily return trains also operate between Manchester Victoria and Wigan North Western, three services in the morning and three in the evening at hourly frequency via Eccles, although only morning services towards Manchester and evening services towards Wigan call at the station.

A parliamentary service operates between Ellesmere Port and Liverpool via the western section of the Chat Moss route, calling at all stations between Earlestown and Lime Street.

Between Earlestown and Manchester Airport, there are additional hourly services operated by Transport for Wales, which originate from Llandudno via the North Wales Coast Line and Chester.[1]

Northern Trains is the dominant operator on the route, and its services are operated with Class 323 3-car electric multiple units, Class 331 3-car or 4-car electric multiple units or Class 195 2-car or 3-car diesel multiple units. Transport for Wales services between Earlestown and Manchester Piccadilly are usually operated by Class 197 diesel multiple units, but Class 158 units may be substituted on occasions.

TransPennine Express operate an hourly service between Liverpool Lime Street and Newcastle Central via Manchester Victoria and York, calling at Lea Green and Newton-le-Willows, operated by Class 802 bi-mode units.

A similar service operates on a Sunday, however the Liverpool Lime Street to Manchester Airport service is extended to Wilmslow and the Llandudno service terminates at Chester.[2]

The northern Liverpool to Manchester route is also used by East Midlands Railway for empty coaching stock (ECS) movements, and as a diversionary route when the southern route is closed.

In past years, the line has been used by many express services which included through trains to Leeds, York and Newcastle (via Huddersfield), and to Preston, Glasgow Central and Edinburgh (diverging on to the West Coast Main Line at Newton-le-Willows). Local trains also ran to Manchester via Leigh, but these services ceased in 1969 when the Eccles-Tyldesley-Leigh-Kenyon branch was closed as a result of the Beeching Axe. The northern Liverpool to Manchester line has also seen regular use over the years for diverted services from the West Coast Main Line when parts of the latter have been closed for engineering work, but diversions via Manchester instead have now become more common as they do not involve the train reversing, as would be necessary at Edge Hill, following the electrification of the route.

Work to four-track the line between Huyton and Roby was completed in October 2017.[3]

Technical details

The key junctions on this route are:

  • Edge Hill West Jn (to CLC line via Warrington Central)
  • Edge Hill East Jn (to Edge Hill CS)
  • Bootle Branch Jn (to Canada Dock Branch, leading to the docks)
  • Olive Mount Jn (Olive Mount Jn Chat Moss to Regent Rd)
  • Huyton Jn (to Wigan line)
  • Earlestown West Jn (West Coast Main Line Southbound via Warrington Bank Quay)
  • Earlestown East Jn (West Coast Main Line Southbound via Warrington Bank Quay)
  • Newton-le-Willows Jn (for daily Wigan via Golborne Junction services)
  • Parkside Jn (for daily Wigan via Golborne Junction services)
  • Eccles Station Jn (to the Weaste branch towards the Manchester Ship Canal)
  • Ordsall Lane Jn (separates Chat Moss line (to Victoria) from Bolton lines (to Piccadilly) [4]

During a journey trains are controlled by:

  • Lime Street control (LS) (Lime Street and the Lime Street tunnels) - now dedicated desk at new Manchester Rail Operating Centre (LL)
  • Edge Hill signal box (LE) (Edge Hill to Edge Hill junction)
  • Sandhills IECC (ML) (Olive Mount Jn To Regent Rd)
  • Huyton signal box (HN) (Edge Hill to Huyton) - now dedicated desk at new Manchester Rail Operating Centre (LL)
  • Warrington signal box (WN)
  • Astley signal box (AY)
  • Eccles signal box (ES)
  • Manchester Piccadilly control (MP)

The above is likely to change in the future as various sections are migrated over to the control of the new Manchester Rail Operating Centre at Ashburys.[5]

Electrification

From 5 March 2015, Class 319 trains started electric operation on this route from Liverpool to Manchester Airport via the Oxford Road viaduct. Manchester Victoria station itself is now electrified and at the new timetable changeover on 17 May 2015 Liverpool to Manchester Victoria stopping services also began electric operation using the same rolling stock.[6]

As a result of completion of the Manchester Castlefield Junction to Newton-le-Willows Junction electrification, TransPennine Express services between Manchester Airport and Glasgow Central/Edinburgh Waverley now use new Class 350 EMUs and are re-routed along a portion of the northern Liverpool to Manchester route before joining the West Coast Main Line at Golborne Junction.[7] TransPennine Express Class 185 DMUs which formerly operated the Manchester Airport - Glasgow/Edinburgh service are now being redeployed to other routes.

The Department for Transport initially announced in July 2009 that the northern route of the Manchester to Liverpool line was to be electrified[8] with 25 kV, 50 Hz AC, overhead line.[7] The electrification process was originally due to be completed by 2013[7] however, following a change of government in 2010, the work was delayed by the government meaning that, while the Manchester to Newton-le-Willows section was completed by December 2013 to enable Manchester - Scotland electric services, the remaining section to Liverpool was not completed until 5 March 2015.[9][10] Now that the electrification of the line is complete and electric services are running, the journey time between Liverpool and Manchester has been reduced from around 45 minutes to 30 minutes due to the greater acceleration achieved by electric trains and the raising of the speed limit along the line from 75 to 90 mph.[7] Class 319 EMUs have been fully refurbished and transferred from the Thameslink route to operate between Liverpool and Manchester,[7] while Thameslink services will be operated by new energy-efficient trains, which were originally due to be delivered between 2011 and 2013.[11] Electrification also offers electric haulage options for freight trains, giving a secondary route to the West Coast Main Line from Liverpool.

Southern route (CLC line)

The original Manchester Central terminus station
1899 map showing the southern route
A First TransPennine Express Class 185 passing Hough Green station on the Southern route in 2014 before TPE services were diverted via Newton-le-Willows

The southern route is the old Cheshire Lines Committee line running from Liverpool Lime Street via Warrington Central to Manchester Piccadilly. There are three passenger trains per hour (tph) in each direction between Liverpool and Manchester, which are usually operated by a variety of Class 150, Class 156 and Class 158 Diesel Multiple Units. TransPennine Express used to use modern Class 185 trains, before their services were diverted via the northern route. These services are run by a number of rail companies and the time intervals are not evenly spaced out; there are large gaps between some services, and at other times trains leave within minutes of each other. While East Midland Railway's once per hour service generally take 50 minutes to reach Manchester from Liverpool Lime Street, some Northern services take an hour and ten minutes to cover the 35 miles. This route is less busy than the northern route in terms of service frequency (1 express & 2 stopping trains per hour each way over the entire route.)

The line's newest station is Warrington West, which opened in December 2019.[12] Liverpool South Parkway station opened in June 2006 after its estimated construction cost of £16 million had doubled to £32 million by the time it was completed. This station replaced Allerton and Garston stations and has frequent bus links to Liverpool John Lennon Airport.

Originally this line ran from Liverpool Central High Level terminus station to Manchester Central terminus station built by the Cheshire Lines Committee (CLC) in 1873. Liverpool Central High Level station was demolished in 1973 due to all the long-haul distance services on Merseyside being concentrated at Liverpool Lime Street with Merseyrail operating the local urban services with underground stations in Liverpool and Birkenhead centres. Manchester Central closed in 1969 and is now the Manchester Central Convention Complex.

At the Liverpool end, the line from Hunts Cross to Central High Level station—which accessed the station via a tunnel—was given over to the Northern Line of the electric Merseyrail services and the line from Hunts Cross diverted in 1966 onto the short section of the West Coast Main Line to Lime Street station. The divergence is at Allerton Junction to the immediate south east of Liverpool South Parkway.

In 1977-8 the original line in the tunnel approaching Liverpool Central High Level terminus was dropped into a new lower level tunnel immediately south of the station to enter Liverpool Central underground station becoming a through line continuing underground to the north of Liverpool and onto Southport. The Low Level underground station and tunnel was built in 1890 to align with the approach tunnel to the High Level station if in the future the need was there. Victorian foresight was utilised nearly 80 years later.

At the Manchester end the line was diverted to Manchester Oxford Road and Manchester Piccadilly after Manchester Central was closed.

The Liverpool to Warrington section of this line was initially scheduled to be on the Merseyrail electric urban network. The Strategic Plan for the North West, the SPNW, in 1973 envisaged that the Outer Loop which was to be an orbital line circling the city of Liverpool, the Edge Hill Spur which is a tunnel connecting the east of Liverpool to the central underground sections, and the lines to St. Helens, Wigan and Warrington would be electrified and all integrated into Merseyrail by 1991.[13] This meant that trains from Warrington would access Liverpool city centre's underground stations via the Northern Line and Liverpool Central underground station, giving access to Liverpool's shopping and business quarters. This never transpired; however, it is a long-term aspiration of Merseytravel.

The Liverpool City Region Combined Authority announced in July 2021 that trials of battery-electric Class 777 trains had been successful with the new units able to travel up to 20 miles on batteries. This opens up the possibilities of the trains being used to serve Warrington from Liverpool on this line, conforming to the original Merseyrail plan.[14]

Planned electrification

Trains run on electrified track between the cities of Liverpool and Manchester on the Northern route (Chat Moss route), however only diesel engine propulsion can be used on the Southern route (Cheshire Lines route). This line has been prioritised for full electrification between the two cities, however no date has been set for the commencement of works.[15]

Current services

Northern operate two trains per hour on the southern route between Liverpool Lime Street and Warrington Central, with one train per hour extending to Manchester Oxford Road. The Manchester service is semi-fast until Warrington, and the service terminating at Warrington calls at all stations (except Sankey for Penketh which receives a limited service). Northern operates a mixture of Class 195, Class 156 and Class 150 units along the line.

East Midlands Railway operate an hourly fast service between Liverpool Lime Street and Norwich calling at Liverpool South Parkway, Widnes, Warrington Central, Manchester Oxford Road and Manchester Piccadilly. EMR mainly use Class 158s along the line, although Class 170s are used sometimes.

TransPennine Express also operate a fast hourly service using this line from Liverpool Lime Street to Cleethorpes - this was extended from Manchester Piccadilly in December 2022. All services call at Liverpool South Parkway, Warrington Central and Birchwood, most services call at Irlam and Urmston and a few services in the morning and evening peaks call at Warrington West. All TransPennine services on this route use Class 185 units.

In the past, the CLC route was used by a variety of local services in addition to limited-stop expresses between the two cities. These included trains between Warrington Central and Stockport Tiviot Dale, Liverpool and Manchester to Wigan Central. and Liverpool to Southport Lord Street via Aintree Central. The latter route was closed as long ago as 1952. The diversion of Liverpool-bound trains to Lime Street in 1966 and the closure of Manchester Central in 1969 (all trains subsequently running to Oxford Road and Piccadilly) saw the route downgraded in importance and from then until the mid-1980s it was operated as a self-contained route due to congestion issues at the Manchester end. The service frequency was also lower than at present, for example the British Rail 1985 timetable showed one semi-fast and one stopping train per hour in each direction on weekdays (excluding the weekday peak periods). Through running to destinations east of Manchester via this route began on a regular basis only in 1986, when the opening of a new connection at Hazel Grove allowed trains from the Sheffield direction to run via Stockport and thus avoid conflicting movements across the station throat at Piccadilly.

The route from Liverpool to Manchester via Newton le Willows has been popular in recent years with steam locomotive-worked excursion trains. The second route from Liverpool through Hunts Cross and Warrington Central to Manchester rarely sees steam-worked excursion trains, the most recent being in 2013 for the 45th anniversary special run of the Fifteen Guinea Special. The original route through Newton-le-Willows was closed for electrification work.

Technical details

The key junctions on this route are:

  • Lime Street (used to move trains onto appropriate platform)
  • Edge Hill East Junction (for the Huyton line)
  • Allerton West Junction (to West Coast Main Line, known as Allerton junction)
  • Hunts Cross Junction (to Merseyrail Northern Line)
  • Glazebrook East Junction (formerly for Warrington-Stockport services, but now used as a passing point)
  • Trafford Park Junction (for Euroterminal freight terminal)
  • Castlefield Junction (where lines to Manchester converge).[4]

During a journey trains are controlled by:

  • Lime Street control (LS) (Lime Street and the Lime Street tunnels) - now dedicated desk at new Manchester Rail Operating Centre (LL)
  • Edge Hill signal box (LE) (Edge Hill to Edge Hill junction)
  • Allerton signal box (AN) (Edge Hill junction to Liverpool South Parkway)
  • Hunts Cross signal box (HC) (Allerton junction to Widnes Station)
  • Warrington Central signal box (WC) (Widnes station to Padgate station)
  • Glazebrook East signal box (GE) (Birchwood station to Urmston)
  • Manchester Piccadilly control (MP) (Urmston to route terminus)

The above is likely to change in the future as various sections are migrated over to the control of the new Manchester Rail Operating Centre at Ashburys.[5]

Former direct routes

Map of all four routes in 1960
  Via Kirkby and Wigan (Route no longer direct; passengers must change at Headbolt Lane near Kirkby)
  Northern route (Chat Moss)
  Southern route (Cheshire Lines Committee) (Route within Liverpool now follows the black route.)
  Via Ditton Junction (Tracks no longer exist between Warrington and Altrincham.)
  Other lines

Via Wigan

It is possible to travel between Liverpool Central and Manchester Victoria via Wigan Wallgate. However, since 1977, this route requires a change (from 2023 at Headbolt Lane, previously at Kirkby), from the Merseyrail electric Northern Line hybrid battery trains to the Northern diesel trains. Sections of this route were built by the Lancashire and Yorkshire Railway and their acquired railways, such as the Liverpool and Bury Railway and the Manchester and Southport Railway.

This line was partially built by the Liverpool and Bury Railway, opening in 1848, which later merged into the Lancashire and Yorkshire Railway who on acquisition owned the Manchester and Southport Railway which formed the complete continuous line from Liverpool into Manchester. The route was continuous from Liverpool Exchange terminus to Manchester Victoria. With the creation of the electric Merseyrail urban network the line was effectively cut into two with two different modes of traction. The Liverpool half is fast third rail electric and the Manchester side slower diesel traction. The point at which the two modes meet is Headbolt Lane which functions as a terminus for the electric and diesel services. As Headbolt Lane station is on the formerly diesel end of the Kirkby branch, the Merseyrail services change power from third rail to batteries at Kirkby and continue the journey using battery power.

The Merseyrail terminus at the Liverpool end of the line was extended from Liverpool Exchange to underground Liverpool Central. With the closure of Liverpool Exchange terminus station in 1977, the terminus at the Liverpool end of the diesel service was cut back to Kirkby station. Passengers from Manchester alight at Headbolt Lane and walk down from platform 3 to platform 1 or 2, boarding a Liverpool bound electric train terminating at Liverpool's underground Central station. The diesel train from Manchester is scheduled to meet a Merseyrail electric train from Liverpool at Headbolt Lane (albeit a tight connection) for ease of passenger transfers. A new underground through station was built at Moorfields replacing some of the services of nearby Liverpool Exchange terminus station.

At 37 miles (59.5 km) this route is longer than either of the two direct routes. According to National Rail Enquires website the travelling time from end to end would be 1 hour 38 minutes, including the change, compared with around 30 minutes from Lime Street to Manchester Piccadilly. However, for passengers who live near to the stations in the middle section of the line it may prove a quicker journey into Liverpool or Manchester.

Via Ditton Junction

A further southerly route, using what was St Helens and Runcorn Gap Railway and Warrington and Stockport Railway, connected Liverpool Lime Street with Manchester Oxford Road via Ditton Junction (south west of Widnes), Warrington Bank Quay (low level platforms) and Timperley (north of Altrincham). East of Warrington the line has been abandoned and now forms part of the Trans Pennine Trail, and from Timperley into Manchester is now the Altrincham Line of the Manchester Metrolink tram system. Fiddlers Ferry Power station was decommissioned on 31 March 2020, leaving the line rarely used.[16][17] What will become of the line between Widnes and Warrington is uncertain. Northern Powerhouse Rail have suggested the line be used to access Liverpool for both NPR.

Timings and line speeds

As of 2016, the fastest journey times are around half an hour, which is little better than over a century earlier. The fastest recorded run was from Manchester Exchange to Liverpool Lime St in 30 minutes 46 seconds by a 1936 built Jubilee 5707 with 7 coaches. An 1882-built compound steam locomotive was timed on the same route in 38 minutes 18 seconds. Until 1968 trains from Liverpool to Manchester by all 3 routes were scheduled to take 40 minutes and often took less. The southern route via Warrington is now restricted to 85 mph and the northern route via Earlestown to 90 mph, with 75 mph over Chat Moss peat bog.[18]

See also

References

  1. ^ "4 - North Wales and Chester to Crewe, Warrington and Manchester" (PDF). Arriva Trains Wales Train Times. Arriva Trains Wales Limited. 17 May 2009. Retrieved 25 August 2009.[permanent dead link]
  2. ^ "N15 - Liverpool to Manchester Airport and Warrington Bank Quay via Earlestown (includes Helsby to Ellesmere Port)" (PDF). Northern Trains. Northern Trains Limited. 10 December 2023. Retrieved 23 December 2023.
  3. ^ "Two platforms reopen at Liverpool Lime Street".
  4. ^ a b "Appendix B North West Route Utilisation Strategy" (PDF). Network Rail. Retrieved 27 November 2015.. With assistance from: "Help re the Liverpool-Manchester lines". Northern Railways forum. Archived from the original on 3 October 2011.
  5. ^ a b "Manchester rail operating centre opens". Network Rail. 21 July 2014. Retrieved 13 May 2016.
  6. ^ "Better rail services become a reality between Liverpool Lime Street and Manchester Airport station". Network Rail Media Centre. Network Rail. 5 March 2015. Archived from the original on 9 March 2015. Retrieved 5 March 2015.
  7. ^ a b c d e "Britain's Transport Infrastructure - Rail Electrification" (PDF). DfT. 22 July 2009. pp. 22–24. Archived from the original (PDF) on 5 August 2009. Retrieved 25 August 2009.
  8. ^ "£100m plan to electrify Manchester to Liverpool railway" (Press release). DfT. 23 July 2009. Archived from the original on 25 August 2009. Retrieved 25 August 2009.
  9. ^ "NR completes NW bridge work". Rail. Peterborough. 10 August 2011. p. 13.
  10. ^ "Better rail services become a reality between Liverpool Lime Street and Manchester Airport station". Network Rail Media Centre. Network Rail. 5 March 2015. Archived from the original on 9 March 2015. Retrieved 17 November 2016.
  11. ^ "Thameslink gets 14,500 more seats". BBC News. 9 April 2008. Retrieved 25 August 2009.
  12. ^ Laversuch, Chloe (28 July 2017). "Goverment [sic] to pay £4.2 million towards cost of building £17.2 million Warrington West Station". Warrington Guardian. Retrieved 28 July 2017.
  13. ^ Couch, Chris (2003). City of change and challenge: urban planning and regeneration in Liverpool. Aldershot: Ashgate. ISBN 978-1-84014-857-2.
  14. ^ "Battery breakthrough will see Merseyrail network extended". 15 July 2021.
  15. ^ "Electrification priorities in northern England". Railway Gazette. 5 March 2015.
  16. ^ Ambrose, Jillian (13 June 2019). "UK to be left with five coal power stations after latest closure". The Guardian. Retrieved 30 June 2021.
  17. ^ "SSE announces proposed closure of Fiddler's Ferry coal-fired power station". SSE. Archived from the original on 2 June 2020. Retrieved 19 November 2019.
  18. ^ Heaton, John (March 2013). Pigott, Nick (ed.). "On the Mersey Beat". Practice & Performance. The Railway Magazine. Vol. 159, no. 1343. pp. 23–27. ISSN 0033-8923.

Further reading

  • Butt, R.V.J. (1995). The Directory of Railway Stations. Patrick Stephens Ltd. ISBN 1-85260-508-1.

Read other articles:

Mayor of the City of IndianapolisSeal of the Office of the Mayor of the City of IndianapolisIncumbentJoe Hogsettsince January 1, 2016Term lengthFour yearsInaugural holderSamuel HendersonFormation1847Salary$95,317.60 annually[1]WebsiteOffice of the Mayor The Mayor of Indianapolis is the head of the executive branch of the consolidated city-county government of Indianapolis and Marion County. As the chief executive, the mayor has the duty to oversee city-county government's variou...

 

 

本條目存在以下問題,請協助改善本條目或在討論頁針對議題發表看法。 此條目需要补充更多来源。 (2018年3月17日)请协助補充多方面可靠来源以改善这篇条目,无法查证的内容可能會因為异议提出而被移除。致使用者:请搜索一下条目的标题(来源搜索:羅生門 (電影) — 网页、新闻、书籍、学术、图像),以检查网络上是否存在该主题的更多可靠来源(判定指引)。 �...

 

 

Canadian TV channel This article is about the Canadian channel that was formerly branded as Teletoon. For the channel that operated as Cartoon Network from 2012 to 2023, see Boomerang (Canadian TV channel). Teletoon redirects here. For its French-language companion channel, see Télétoon. Television channel Cartoon NetworkLogo used since 2023CountryCanadaBroadcast areaNationwideHeadquartersToronto, OntarioProgrammingLanguage(s)EnglishPicture format1080i HDTV(downscaled to 480i letterbox for ...

Process of developing the design of motor vehicles This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Automotive design – news · newspapers · books · scholar · JSTOR (January 2024) (Learn how and when to remove this template message) Designers at work in 1961. Standing by the scale model's left front fender is ...

 

 

Carpe diemsingolo discograficoArtistaJoker Out Pubblicazione4 febbraio 2023 Durata2:45 GenereRock EtichettaVirgin Records ProduttoreŽarko Pak, Todd Burke FormatiDownload digitale, streaming Joker Out - cronologiaSingolo precedenteKatrina(2022)Singolo successivoNew Wave(2023) Carpe diem è un singolo del gruppo musicale sloveno Joker Out, pubblicato il 4 febbraio 2023. Indice 1 Descrizione 2 Promozione 3 Tracce 4 Classifiche 5 Note 6 Collegamenti esterni Descrizione Il brano è stato scritto ...

 

 

55th season of La Liga Football league seasonLa LigaHércules line-up in a preseason match. The Valencian team would be relegated that year.Dates31 August 1985–20 April 1986ChampionsReal Madrid21st titleRelegatedValenciaHérculesCeltaEuropean CupReal MadridCup Winners' CupZaragozaUEFA CupBarcelonaAthletic BilbaoAtlético MadridMatches played306Goals scored798 (2.61 per match)Top goalscorerHugo Sánchez(22 goals)← 1984–85 1986–87 → The 1985–86 La Liga season, the 55th since it...

Papal Orders and decoration of merit of the Holy See Not to be confused with Holy orders in the Catholic Church. You can help expand this article with text translated from the corresponding article in German. (January 2016) Click [show] for important translation instructions. Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy...

 

 

1958 Japanese filmThe White Snake EnchantressTheatrical posterDirected byTaiji Yabushita [ja]Screenplay byTaiji YabushitaStory byShin UeharaBased onLegend of the White SnakeProduced byHiroshi ÔkawaStarringHisaya MorishigeMariko MiyagiNarrated byHisaya MorishigeCinematographyTakamitsu TsukaharaEdited byShinataro MiyamotoMusic byChuji KinoshitaHajime KaburagiMasayoshi IkedaProductioncompanyToei DogaDistributed byToei CompanyRelease date October 22, 1958 (1958-10-22)...

 

 

Міністерство оборони України (Міноборони) Емблема Міністерства оборони та Прапор Міністерства оборони Будівля Міністерства оборони у КиєвіЗагальна інформаціяКраїна  УкраїнаДата створення 24 серпня 1991Попередні відомства Міністерство оборони СРСР Народний комісарі...

莎拉·阿什頓-西里洛2023年8月,阿什頓-西里洛穿著軍服出生 (1977-07-09) 1977年7月9日(46歲) 美國佛羅里達州国籍 美國别名莎拉·阿什頓(Sarah Ashton)莎拉·西里洛(Sarah Cirillo)金髮女郎(Blonde)职业記者、活動家、政治活動家和候選人、軍醫活跃时期2020年—雇主內華達州共和黨候選人(2020年)《Political.tips》(2020年—)《LGBTQ國度》(2022年3月—2022年10月)烏克蘭媒�...

 

 

Voce principale: Eccellenza 2018-2019. Eccellenza Piemonte-Valle d'Aosta2018-2019 Competizione Eccellenza Piemonte-Valle d'Aosta Sport Calcio Edizione 28ª Organizzatore FIGC - LND Comitato Regionale Piemonte-Valle d'Aosta Date dal 9 settembre 2018al 19 maggio 2019 Luogo  Piemonte Valle d'Aosta Partecipanti 32 Formula 2 gironi all'italiana con play-off e play-out. Risultati Vincitore Fossano(1º titolo) Promozioni Verbania Fossano Retrocessioni LucentoOrizzonti UnitedAronaA...

 

 

Last known person to have been infected with naturally occurring Variola major smallpox Rahima BanuBanu in 1975BornRahima Banu Begum (1972-10-16) October 16, 1972 (age 51)NationalityBangladeshi Rahima Banu Begum (Bengali: রহিমা বানু বেগম; born 16 October 1972)[1] is the last known person to have been infected with naturally occurring Variola major smallpox, the more deadly variety of the disease.[2][3] Biography Smallpox case Rahima Banu'...

Maronite Catholic cathedral in France This article is about the Maronite cathedral in Paris. For the Maronite cathedral in Brooklyn, see Our Lady of Lebanon Maronite Cathedral (Brooklyn). Church in Paris, FranceOur Lady of Lebanon of Paris CathedralCathédrale Notre-Dame-du-Liban de ParisLocation15-17 rue d'Ulm5th arrondissentParisCountryFranceDenominationCatholic ChurchSui iuris churchMaronite ChurchHistoryStatusActiveConsecrated13 May 1894ArchitectureFunctional statusCathedralArchitect(s)Ju...

 

 

Public high school in Angeles, Philippines This article does not cite any sources. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Angeles City Science High School – news · newspapers · books · scholar · JSTOR (April 2024) (Learn how and when to remove this message) Angeles City Science High SchoolMataas na Paaralang Pang-Agham ng Lungsod ng Angeles (Filipino)...

 

 

American politician (1922–1995) Bert BandstraMember of the U.S. House of Representativesfrom Iowa's 4th districtIn officeJanuary 3, 1965 – January 3, 1967Preceded byJohn Henry KylSucceeded byJohn Henry Kyl Personal detailsBornJanuary 25, 1922Monroe County, Iowa, U.S.DiedOctober 23, 1995(1995-10-23) (aged 73)Pella, Iowa, U.S.Political partyDemocraticAlma materUniversity of Michigan Law SchoolMilitary serviceAllegianceUnited StatesBranch/serviceUnited States NavyYe...

Minimising distortion artifacts when representing a high-resolution image at a lower resolution This article includes a list of general references, but it lacks sufficient corresponding inline citations. Please help to improve this article by introducing more precise citations. (January 2009) (Learn how and when to remove this message) In digital signal processing, spatial anti-aliasing is a technique for minimizing the distortion artifacts (aliasing) when representing a high-resolution image...

 

 

Honduran Police in San Francisco, Lempira Law enforcement in Honduras is split among three law enforcement organisations. National Police of Honduras Current branches Transit Police (Honduras) (Policia de Transito), a police force in charge of automobile transportation. They take care of car crashes, parking violations and other infringements. DGIC (Dirección General de Investigaciones Criminalisticas), the agency that takes care of forensics and drug enforcement. Cobras (Honduras), armed c...

 

 

Mai 1862 Nombre de jours 31 Premier jour Jeudi 1er mai 18624e jour de la semaine 18 Dernier jour Samedi 31 mai 18626e jour de la semaine 22 Calendrier mai 1862 Sem Lu Ma Me Je Ve Sa Di 18 1er 2 3 4 19 5 6 7 8 9 10 11 20 12 13 14 15 16 17 18 21 19 20 21 22 23 24 25  22 26 27 28 29 30 31 1862 • Années 1860 • XIXe siècle Mois précédent et suivant Avril 1862 Juin 1862 Mai précédent et suivant Mai 1861 Mai 1863 Chronologies par zone géographique Chronologies th...

Harpan 24 och 25, Karlaplan 6–8, 2010. Harpan 24 och 25 är två bostadsfastigheter i kvarteret Harpan vid Karlaplan 6–8 på Östermalm i centrala Stockholm. Fastigheterna uppfördes 1888–1889 och är blåmärkta av Stadsmuseet i Stockholm vilket innebär att bebyggelsen bedöms ha synnerligen höga kulturhistoriska värden.[1] Historik Harpan 24 och 25 Harpan 24 och 25 fasadritningar 1888. Harpan 24 och 25 omkring 1900. De båda sammanbyggda fastigheterna uppfördes 1888–1889 efter ...

 

 

Ethnolinguistic map of Italy in the Iron Age, before the Roman expansion and conquest of Italy This list of ancient peoples living in Italy summarises the many different Italian populations that existed in antiquity. Among them, the Romans succeeded in Romanizing the entire Italian peninsula following the Roman expansion in Italy, which provides the time-window in which the names of the remaining ancient Italian peoples first appear in documentation. Many names are exonyms assigned by the an...