Ice blockage in the third stage engine caused a performance shortfall, leaving the payload in a lower-than-planned orbit. The satellite maneuvered with its own propulsion system, reaching geosynchronous transfer orbit on 3 September 2009, and geostationary orbit on 9 September 2009.[55][56]