The new London Overground line names and colours were introduced across the London rail network in November 2024
History
The original station was opened on 1 October 1868 by the North London Railway. Services ceased on 15 May 1944 with a substitute bus service provided until official closure on 23 April 1945. Other than a partial section of wall to the north of the bridge over Barnabas Road, the original 1868 station has been demolished. Although of reduced size, the original station building would have been similar to buildings remaining at Hackney Central and Camden Road.
The present basic station was opened on 13 May 1985,[3] to coincide with the introduction of the North London Link service between Richmond and North Woolwich.
In February 2010, as part of the programme to introduce four-car trains on the London Overground network, the North London line between Gospel Oak and Stratford closed to enable the installation of a new signalling system and the extension of 30 platforms along the route. Engineering work continued until May 2011, during which reduced services operated and Sunday services were suspended. The line reopened on 1 June 2010.[4]
Services
The typical service at the station is four trains per hour westbound to Richmond via Hackney Central, Highbury, Camden Road and Willesden Junction, alternating with four trains per hour westbound to Clapham Junction. There are eight trains per hour eastbound to Stratford.[5] These extra services which were introduced following maintenance work on the North London line have replaced the additional shuttle train running between Camden Road and Stratford in the morning and evening peaks.