In 2011, the consortium Cross London Trains (XLT) consisting of Siemens Project Ventures, 3i Infrastructure, and Innisfree was announced as preferred bidder with Siemens Mobility to manufacture the trains. The decision was politically controversial as the trains were to be built in Germany, while the competing consortium led by Bombardier Transportation had a UK train factory. Both the procurement process and final close of contract were significantly delayed, resulting in the expected first delivery date moving from 2012 to 2016. The £1.6 billion contract to manufacture and provide service depots for the trains was finalised in June 2013. The first train was delivered in late July 2015.
A fleet of 60 eight-car and 55 twelve-car trains[3] entered service between Spring 2016 and 2019. Having replaced Class 319s, 377s, and 387s, Class 700s are the only trains operated on the Thameslink network.[7][8] Each train is able to reach 100 mph (160 km/h) and carry 1,146 passengers in an 8-car train, and 1,754 passengers in a 12-car train. Maintenance depots have been built at Hornsey and Three Bridges.
Procurement
Announcement
The Department for Transport began its procurement process (Thameslink Rolling Stock Project, or Thameslink Rolling stock Programme) on 9 April 2008, with the aim of introducing more passenger capacity on Thameslink lines to match expected demand. In addition, the bidders were to provide depots for vehicle maintenance and storage and finance for the rolling-stock project whereby revenues would be generated from the long-term leasing of rolling stock to the train operating company and associated maintenance payments.[9]
The general specifications included: high reliability, short station dwell times, integrated information technology including passenger information and information for vehicle maintenance, a top speed of 100 mph (160 km/h), and high acceleration and deceleration performance in line with a high-frequency timetable.[note 1] The trains were to be designed for low weight, low track forces, and high energy efficiency. A standard 12-car train was to be about 240 metres (790 ft) long and shorter 8-car trains were limited to 162 metres (531 ft).[9]
The passenger accommodation was to include versions for both "metro" and "commuter" trains,[note 2] based around a 2+2 seating arrangement, with fold-up seats and designed for high levels of standing passengers.[9] Ride quality and noise levels were expected to equal or be better than those of current vehicles and climate control (air-conditioning) was to be fitted.[11] The vehicles were to be fitted for driver-only operation, and to include GSM-R communications radio, as well as AWS, TPWS, and ERTMS level 2 safety systems. The ability to be used in 'Automatic train operation' (ATO) mode, where an on-board computer controls the motors and brakes, was also specified.[11]
Vehicles were to operate on 750 V DC and 25 kV AC electrification systems, with regenerative brakes. Maintenance time was to be reduced by the use of modular components, remote diagnostics, and the avoidance of over-complicated systems.[11] The Department for Transport gave a target of 384 tonnes (378 long tons; 423 short tons) when empty for a 243 m (797 ft) train.[11]
Hitachi exited the bidding process in April 2009.[13]
In July 2009, Siemens unveiled the Desiro City, a development of design and technology used in its Desiro UK range and the Desiro Mainline range.[14] Development of the design had begun in 2007, with an investment of about £45 million.[2][15]
In September 2009, Alstom unveiled the X'trapolis UK, unusually an articulated vehicle, using 15.6 metre (51 ft) cars, with individual carriages proposed to be supported at one end by a bogie and at the opposite end by a linkage to the next carriage. The shorter vehicle allowed a slightly wider design; the smaller number of bogies was to have resulted in a train approximately 40 tonnes lighter than a conventional design.[16] However, the design would have resulted in a higher axle load. The bid was rejected in October 2009.[17]
Bombardier Transportation offered the Aventra, a design incorporating a development of the FLEXX Eco inside frame bogie with bogie-mounted traction motors.[18]
Both Bombardier's and Siemens' rolling-stock designs were conventional EMUs incorporating inside frame bogies and modern passenger and rolling stock information systems.[2][14][15][18]
Contract decision and financial close
The contract for the order was originally planned to be signed in Summer 2009, with the first vehicles in service by February 2012, and squadron service by 2015.[9] The award of the contract was delayed by the 2010 general election[19] and the subsequent spending review, following which the procurement was announced to be proceeding in late 2010.[20]
On 16 June 2011, Cross London Trains Ltd, a consortium formed by Siemens Project Ventures GmbH, Innisfree Ltd., and 3i Infrastructure Ltd., was named preferred bidder for the PFI contract, and the targeted entry of trains into service was rescheduled to 2015–2018. The vehicles would be manufactured at Siemens' plant in Krefeld, Germany, and maintenance depots were to be built at Hornsey (London) and Three Bridges (Sussex).[2]
The contract was significantly delayed: initially Siemens had hoped to reach agreement in early 2012;[21] by late 2012 commercial close was hoped for by the end of the year, and financial close in early 2013.[22] Key aspects of the commercial contract were reported to have been finalised by December 2012.[23]
As a result of the delays to the procurement, in late 2012, train operating company Southern began procurement of 116 dual-voltage Class 387 EMUs from Bombardier that would be used temporarily on the Thameslink route until 2015; the order contract was finalised in July 2013.[23][24][25][26]
In mid-2013 the National Audit Office (NAO) reported that the contract delay could negatively impact the delivery of the entire Thameslink Programme.[27]
The £1.6 billion contract to finance, supply, and maintain a 1,140-carriage fleet of passenger rolling stock was eventually finalised between the DfT, the supplier Siemens, and the Cross London Trains consortium on 14 June 2013.[28][29][30]
Development of the new SF7000 bogie began in 2007, with the intention that it would be the UK-market replacement for the preceding Siemens SGP SF5000 model. To reduce energy consumption and track access charges, a key feature of the design was reduced weight: weight-saving design elements included short wheelbase, inboard frames, a bolsterless bogie design, and hollow axles. Total bogie weight is 6.3 tonnes (powered) and 4.4 tonnes (trailer), a reduction of around one third from the SF5000 design.[32][33]
The primary suspension system uses layered rubber, with pneumatic secondary suspension. Motor bogies have a wheelbase of 2,200 mm (87 in), while trailer bogies are 100 mm (3.9 in) shorter. Both variants use wheels of 820 mm (32 in) nominal diameter.[5] Braking is by tread brakes and regenerative braking on motor bogies, and two axle-mounted disc brakes per axle on trailer bogies.[32][34]
Prototypes of the new bogie were completed at Siemens' bogie plant in Graz, Austria in late 2011.[35]
Manufacture of pre-series production trainsets began before formal financial close of the project in mid-2013.[36]
A mock-up of the train was unveiled at the ExCel centre in January 2014, and then displayed at various stations in London and the surrounding area.[37][38]
The first train arrived in the UK by the end of July 2015, and was delivered to the Three Bridges depot.[40] The first test run on the Brighton Main Line took place in December 2015.[41]
The first train in service was unit 700108 forming the 1002 Brighton to London Bridge service on 20 June 2016. By 18 September 2017, Class 700s replaced all Class 319, 377, and 387 units previously in use on the network.[7][8][42] All units were accepted by Thameslink by summer 2018, and by the end of 2019 all were in passenger service.
The Class 700 fleet, at 60 eight-car and 55 twelve-car units, is over double the size of the old Thameslink fleet. This increase has been used not only to enhance capacity, but also to expand the Thameslink network.
On 6 November 2017, Class 700s started on the Great Northern route with the first, 700128, operating the 0656 Peterborough to London Kings Cross service.[43] The Great Northern route has since been partially incorporated in the Thameslink network after through services through the Canal Tunnels began on 26 February 2018.[44] On this route, Class 700s replaced parts of the Class 365 fleet.
On 11 December 2017, Class 700s took over peak-time services from London Bridge to Littlehampton and weekday-only services from London Bridge to Horsham from Southern with the former starting from Bedford instead of London Bridge.[45][46]
Class 700s are still due to enter service on a planned new service between Cambridge and Maidstone East but a date for this has not yet been confirmed.[48]
Criticism
Procurement
Because the trains were to be built outside the UK, the decision to award the contract to Siemens proved controversial: there was widespread criticism of the UK government's bidding process and perceived lack of support for British manufacturing,[49][50] which in turn led to a review of governmental procurement mechanisms.[51][52][53][54] Additionally, the decision to procure a train with a new bogie design untested in the UK was challenged by several observers at a parliamentary investigation into the train procurement; rival bidder Bombardier already had a proven low-weight bogie.[55]
In 2014, the NAO reported on the Department for Transport's handling of Intercity Express and Thameslink rolling-stock procurement projects. The report questioned the DfT's attempt to take leadership in the project, contrary to general policy, without any prior experience of large-scale rolling stock procurement; the NAO also said the DfT had handled communications with bidders poorly, increasing the likelihood of a legal challenge to its decisions.[56][57]
Interior design
The Class 700 units have been criticised for having fewer seats than those they replaced.[58] There are 666 seats on the twelve-car versions of the Class 700, compared to 714 on a twelve-car formation of a Thameslink Class 377/5 and 807 on a twelve car formation of a Great Northern Class 365. The reduction in the number of seats is intended to provide more standing room on busy trains into Central London, but has been criticised by those who use the trains for longer journeys. There will, however, be more seats overall, as the services will run more frequently.
Additionally, the seats themselves have been criticised for being an uncomfortable shape and having insufficient padding. They are also narrow and positioned close together – another design intended to increase standing space. These poor levels of comfort, along with their tall, thin, tapered appearance, have led them to sometimes be nicknamed "ironing boards";[59] they have also been likened to sitting on concrete.[60]
Thameslink have claimed that the lack of padding was required to meet fire regulations; however, the Rail Safety and Standards Board have claimed that this is untrue, and that it was simply a measure by the DfT to reduce costs.[61]
Upon delivery, the trains were also missing various amenities which were considered standard, including seatback tables and Wi-Fi, which are now being retrofitted to some units.[61] As of April 2023[update], 58% of Class 700/1 (12 coach) and 23% of Class 700/0 (8 coach) are fitted with Wi-Fi with no plans to extend this further across the fleet.[62]
Fleet and formation details
The new fleet were allocated TOPS classification '700' in 2013.[3] This was divided into subclasses 700/0 for eight-car units and 700/1 for twelve-car units.[23][63]
The first class compartment at the rear of each unit is declassified at all times.[64][65]
In July 2013 Eversholt Rail entered into an agreement with Cross London Trains to provide long-term (22-year) asset management for the fleet of trains.[66]
There are 60 eight-car units and 55 twelve-car units.[67] Each is a fixed length continuously gangwayed vehicle.[3] The initial livery is "light grey with pastel blue doors and a white diagonal flash at the carriage ends".[3]
As of April 2020, unit 700111, alongside Southern unit 377111 and Great Northern unit 717011, has been wrapped with a special NHS appreciation livery to show support for the NHS and the 200,000 essential commuters travelling on Govia Thameslink Railway's network each week during the nationwide lockdown caused by the COVID-19 pandemic.[70]
Named units
Unit 700124 is named Driver Phill Marchant Keeping us moving for more than 12 years[71]
In 2008, the Department for Transport commissioned a study into the location of depots for the future Thameslink rolling stock: Network Rail preferred two depots based on an expectation that at times the central area of the Thameslink route would be closed for maintenance outside commercial operational hours, with no workable alternative electrified routes available; as a result, depots on either side of the central Thameslink area were required, enabling trains to reach a depot on a nightly basis without passing through central London. A single-depot solution was also investigated, but no suitably large sites were identified for such a facility.[72] Sites were considered at: Wellingborough;[note 3]Hornsey;[note 4]Cricklewood;[note 5]Selhurst;[note 6]Three Bridges;[note 7] and Tonbridge.[73] By late 2008, the sites had been narrowed to Hornsey, Three Bridges and Tonbridge; finally Hornsey and Three Bridges were selected as a two-depot solution.[74]
In August 2009, planning applications for both sites were submitted by Arup acting on behalf of Network Rail.[75][76] However, in December, the Hornsey application was blocked by Secretary of State for Communities and Local GovernmentJohn Denham on grounds of its scale.[77][78] Potential sites for the northern depot were reassessed and possible options reduced to three: a main depot at Coronation Sidings Hornsey; a main depot adjacent to the existing depot at Hornsey; and a site at Chesterton, Cambridge – a depot reduced in size on the site of the original plan was chosen as the best option for Network Rail.[79] In 2011 revised plans were submitted for both the Hornsey and Three Bridges schemes, with the Hornsey scheme reduced in size and the Three Bridges scheme expanded.[80] In mid-2013, VolkerFitzpatrick was awarded the approximately £150 million contract to build the two depots.[81][82]
The Three Bridges and the Hornsey depots were officially opened in October 2015 and December 2016 respectively.[83][84]
Sixty Thameslink Class 700 and 717 trains failed during disturbances to the National Grid on 9 August 2019 during which the grid frequency fell to 48.914 Hz. Govia Thameslink Railway reported that their Class 700 and Class 717 trains that were operating on AC power were affected by the frequency deviation below 49 Hz. Half were restarted by the drivers but the others required a technician to come out to the train to restart it. Thousands of passengers had their journeys delayed with 371 trains cancelled, 220 part cancelled, and 873 trains delayed. London St Pancras and King's Cross stations had to close for several hours due to overcrowding.[93] The DNOs confirmed that no track supplies were lost due to the DNO's Low Frequency Demand Disconnection (LFDD) protection operation.[94] The problem was identified as the recent "Desiro City" software update from Siemens Mobility. Desiro City is the software that enables the train to operate. Siemens Technical Specification for the train states that the train will continue to operate with supply frequency drops down to 48.5 Hz for short periods of time, but that the train drives are permitted to disconnected at or below 49 Hz. However Siemens also state that all trains should have been recoverable via Battery Reset. Instead a Permanent Lockout on the trains followed the protective shutdown caused by a supply voltage frequency drop. Siemens confirmed this lock out should not have occurred and "This was not the intended behaviour of the train."[95] This permanent lock out was due to the recent software update. The trains where the driver recovered them with a battery restart and thus were not affected by the permanent lock out did not yet have the latest version of the software.[citation needed]Two large power stations, Hornsea One Ltd (co-owned by Orsted) and Little Barford (operated by RWE) which did not remain connected after the lightning strike have agreed to make a voluntary payment of £4.5 million each into Ofgem's redress fund.[96]
On 18 February 2022, during Storm Eunice, unit 700153 collided with a tree obstructing the line at Ifield, West Sussex and was derailed.[97]
On 9 June 2023, unit 700042 was derailed at Plumstead.[98]
^The 240 m long trains were expected to be of "outer-suburban" or "commuter" type, while the 162 m trains were expected to have both "metro" and "suburban" passenger accommodation types.[10]
^Located in the 'fork' between the Brighton Main Line (L&BR 1841), the Arun Valley line (LB&SCR 1848), and the now-closed Three Bridges–Tunbridge Wells line (EGR 1855),[85] the site had historically been used for railway use, having been unbuilt on prior to railway developments; by 1910 sidings had been built east of the Brighton Main Line, as well as an engine shed and turntable adjacent west of the site;[86] in 2008 the western development area comprised underused sidings and hardstanding with the site east of the mainline including operation sidings, as well as offices; tenants included English Welsh & Scottish Railway, BAM Nuttall, Colas Rail and Balfour Beatty.[87][88]
^The northern site, in which the main maintenance building is located, is on rail sidings ('Coronation sidings'/'Hornsey sidings') which had been developed on made embankments from the later 19th century to early 20th century; the southern stabling area was on land that had been extensively developed as railway sidings since the early 20th century.[90][91][92]
References
^Scrimshaw, Steve (2 August 2013). "Thameslink on track". The Rail Engineer. Archived from the original on 12 November 2013. Retrieved 8 November 2013.
^"Alstom unveils X'trapolis UK". Railway Gazette International. London. 16 September 2009. Archived from the original on 24 October 2020. Retrieved 12 July 2011.
Wordsworth, Nigel (October 2009). "Weight loss drives step change". The Rail Engineer. No. 60. pp. 18–19. Archived from the original on 13 October 2012. Retrieved 12 July 2011.
^New timetables available to download hereArchived 22 July 2018 at the Wayback Machine (London and East Grinstead, Horsham, Brighton and Littlehampton timetable)
^Thameslink rolling stock procurement: eleventh report of session 2010–12 (Report). Vol. 1: Report, together with formal minutes, oral and written evidence. The Stationery Office. 2011. "The bogie", pp.15–16; Ev 6, Q33; Ev 13, Q98.
^@TLRailUK (4 April 2023). "Tweet from Thameslink confirming wi-fi status on trains" (Tweet). Retrieved 3 October 2023 – via Twitter. ...just as a correction to this information. 58% of class 700/1 (12 coach) are fitted with Wi-Fi and 23% of class 700/0 (8 coach) are fitted with Wi-Fi.
^"Rail depot plans thrown out". Hampstead & Highgate Express. 10 December 2009. Archived from the original on 21 February 2014. Retrieved 18 February 2014.
^Network Rail & ARUP 2011a, (REP-PL-HOR-001A) Planning Statement (Part C) Northern Depot Site Assessment Study.
Artikel ini bukan mengenai Harry Caray. Harry CareyHarry Carey in 1919LahirHenry DeWitt Carey II(1878-01-16)16 Januari 1878The Bronx, New York, U.S.Meninggal21 September 1947(1947-09-21) (umur 69)Brentwood, California, U.S.PekerjaanActorTahun aktif1909–1947Suami/istriOlive Carey (1920–1947; his death) 2 childrenFern Foster (actress) Harry Carey (16 Januari 1878 – 21 September 1947) adalah aktor berkebangsaan Amerika Serikat dan merupakan salah satu dari aktor pad...
2023 Japanese animated television series Pokémon ConciergePromotional posterGenre Adventure Fantasy Comedy Based onPokémonby The Pokémon CompanyWritten byDoki HarumiDirected byOgawa IkuStarring Rena Nōnen Karen Fukuhara Theme music composerMariya TakeuchiCountry of originJapanUnited StatesOriginal languageJapaneseNo. of seasons1No. of episodes4ProductionRunning time15-20 minutesProduction companies The Pokémon Company Dwarf Studio Netflix Animation Original releaseNetworkNetflixReleaseDe...
Artikel ini tidak memiliki referensi atau sumber tepercaya sehingga isinya tidak bisa dipastikan. Tolong bantu perbaiki artikel ini dengan menambahkan referensi yang layak. Tulisan tanpa sumber dapat dipertanyakan dan dihapus sewaktu-waktu.Cari sumber: Politeknik Keuangan Negara STAN – berita · surat kabar · buku · cendekiawan · JSTOR Politeknik Keuangan Negara Sekolah Tinggi Akuntansi NegaraJenisPerguruan Tinggi KedinasanDidirikan1952Lembaga indukKeme...
2015 single by Ladies' CodeI'll Smile, Even if it HurtsSingle by Ladies' CodeReleasedSeptember 7, 2015 (2015-09-07) (South Korea)Recorded2015Genre K-pop ballad Length7:36Label Polaris LOEN Songwriter(s)Lee SojungLadies' Code singles chronology Kiss Kiss (2014) I'll Smile, Even if it Hurts (2015) Myst3ry (2016) I'll Smile, Even if it Hurts is a song recorded by South Korean girl group Ladies' Code. It is the group's first release following the deaths of members EunB and RiSe in ...
Cet article est une ébauche concernant une personnalité moldave et une chanteuse. Vous pouvez partager vos connaissances en l’améliorant (comment ?) selon les recommandations des projets correspondants. Geta BurlacuGeta Burlacu au Concours Eurovision en 2008.BiographieNaissance 22 juillet 1974 (49 ans)BălțiNationalité moldaveActivités Chanteuse, musicienne de jazzPériode d'activité depuis 1993Autres informationsTessiture ContraltoInstrument ViolonGenre artistique JazzSit...
Сельское поселение России (МО 2-го уровня)Новотитаровское сельское поселение Флаг[d] Герб 45°14′09″ с. ш. 38°58′16″ в. д.HGЯO Страна Россия Субъект РФ Краснодарский край Район Динской Включает 4 населённых пункта Адм. центр Новотитаровская Глава сельского пос�...
This article includes a list of general references, but it lacks sufficient corresponding inline citations. Please help to improve this article by introducing more precise citations. (January 2024) (Learn how and when to remove this message) This article handles air-to-surface special attack units by Action Order only and does not cover air-to-air suicide attack groups like the Shinten Air Superiority Group (Shinten Seikūtai [ja])m Type 4 suicide boat group the Army Maritime As...
Tightly packed group of stars within a larger formation For the center of the Milky Way galaxy, see Galactic Center. Artist's impression of the central bulge of the Milky Way[1] In astronomy, a galactic bulge (or simply bulge) is a tightly packed group of stars within a larger star formation. The term almost exclusively refers to the central group of stars found in most spiral galaxies (see galactic spheroid). Bulges were historically thought to be elliptical galaxies that happened to...
Artikel bertopik sepak bola ini perlu dikembangkan agar dapat memenuhi kriteria sebagai entri Wikipedia.Bantulah untuk mengembangkan artikel ini. Jika tidak dikembangkan, artikel ini akan dihapus. Beşiktaş JKNama lengkapBeşiktaş Jimnastik KulübüJulukanKara Kartallar(Elang Hitam)Berdiri19 Maret 1903; 121 tahun lalu (1903-03-19)StadionVodafone Park, Beşiktaş, Istanbul(Kapasitas: 42,590)PresidenAhmet Nur Çebi[1][2]Head coachÖnder KaraveliLigaLiga Super2022–2...
Crmnica numbered 16–22 in this map of Old Montenegro Crmnica (Serbian and Montenegrin: Црмница, pronounced [tsr̩mnitsa]) is one of the local communities (mjesne zajednice) of the municipality of Bar and a historical region in southern Montenegro. It was one of the four sub-regions of Old Montenegro, where it was known as Crmnička nahija (the nahija of Crmnica). Geography and demographics Crmnica is located in south-western Montenegro, between the historical area of the Paš...
Army Contracting CommandACC's distinctive unit insigniaCountryUnited StatesAllegianceUnited States ArmyTypeContracting CommandRoleArranging ContractsPart of U.S. Army Materiel CommandGarrison/HQRedstone Arsenal, ALMotto(s)COMPARATOR, ARMATI, CUSTOS (Soldier, Emptor, Guardian)[1]Websitewww.army.mil/info/organization/unitsandcommands/commandstructure/accCommandersCurrentcommanderMG Douglas S. LowreyMilitary unit The Army Contracting Command (ACC) is a contracting services command o...
يفتقر محتوى هذه المقالة إلى الاستشهاد بمصادر. فضلاً، ساهم في تطوير هذه المقالة من خلال إضافة مصادر موثوق بها. أي معلومات غير موثقة يمكن التشكيك بها وإزالتها. (مارس 2016) 46°48′46″N 71°12′54″W / 46.812749°N 71.215096°W / 46.812749; -71.215096 كيبك مقسمة إلى ست دوائر هي : البحيرات سانت فوي...
Canton Ticinocantone(IT) Repubblica e Cantone Ticino (DE) Republik und Kanton Tessin (FR) République et Canton du Tessin (RM) Republica e Chantun Tessin Canton Ticino – VedutaCastelgrande a Bellinzona LocalizzazioneStato Svizzera AmministrazioneCapoluogo Bellinzona GovernoConsiglio di Stato (5) LegislatoreGran Consiglio (90) Lingue ufficialiitaliano Data di istituzione1803 TerritorioCoordinatedel capoluogo46°12′N 9°01′E46°12′N, 9°01′E (Canton Ticino) Altitudine238 ...
Public communication of science-related topics to non-experts Not to be confused with Scientific literature, Scientific communication, or Scholarly communication. For the academic journal, see Science Communication. Schematic overview of the field and the actors of science communication according to Carsten Könneker Science communication encompasses a wide range of activities that connect science and society.[1] Common goals of science communication include informing non-experts abou...
Book by Richard Bradley Rock Art and the Prehistory of Atlantic Europe: Signing the Land The first English-language edition of the book, featuring a reconstruction of the rock art at Roughting Linn.AuthorRichard BradleyLanguageEnglishSubjectArchaeologyPublisherRoutledgePublication date1997Publication placeUnited KingdomMedia typePrint (Hardback and paperback)Pages238ISBN978-0415165365 Rock Art and the Prehistory of Atlantic Europe: Signing the Land is an archaeological book authored by t...