On 19 April 2022, the Ministry of Transportation carry out the physical work of the skybridge construction project after signing the work contract for the construction of the overpass that connects this station with the Bojong Gede type C bus terminal which is located 400 meters northwest of this station.[3][4]
Station layout
This station has two railway tracks. In 2015, the station platform was extended to accommodate 12 carriages of a single KRL train series.[5]
B23
G
Main building
Platform floor
Side platform, the doors are opened on the right side
On 21 November 2012, landslides caused the railway line to be cut between Bojong Gede Station and Cilebut Station. Bojon Gede Station automatically becomes the last station for KRL trips to Bogor. The rail track that was hit by the landslide was successfully repaired within 8 days.[7]
^ as of now only serves intercity trains, not serving Commuterline yet. † for northbound train only (to Kampung Bandan). Southbound (to Jatinegara) trains does not stop here. Strikethrough: closed for all services