Wind power generation capacity in India has significantly increased in recent years. As of 31 March 2024, the total installed wind power capacity was 45.887 gigawatts (GW). India has the fourth largest installed wind power capacity in the world.[2] Wind power capacity is mainly spread across the southern, western, and northwestern states.[3] The onshore wind power potential of India was assessed at 132 GW with minimum 32% CUF at 120 m above the local ground level (agl).[4] Whereas, the estimated potential at minimum 25% CUF is 695 GW at 120 agl.

Wind power costs in India are decreasing rapidly.[5] The levelised tariff of wind power reached a record low of 2.43 (2.9¢ US) per kWh (without any direct or indirect subsidies) during auctions for wind projects in December 2017.[6][7][8] However, the levelised tariff increased to 3.17 (3.8¢ US) per kWh in May 2023.[9][10] In December 2017, union government announced the applicable guidelines for tariff-based wind power auctions to bring more clarity and minimise the risk to the developers.[11] Wind power installations occupy only 2% of the wind farm area facilitating rest of the area for agriculture, plantations, etc.[12] Wind power plants are also capable to provide fast frequency response in ramping up falling grid frequency.[13]

Installed capacity

The table below shows India's year on year installed wind power, annual wind power generation and annual growth in wind power generation since 2006.[14] Wind power generation in India ranks fifth globally in 2021.

Installed wind power capacity and generation in India since 2006[15]
Financial year 6-07 7-08 8-09 09-10 10–11 11–12 12–13 13–14 14–15 15–16 16–17 17–18 18–19[16] 19–20 20–21 21–22[17] 22-23 23-24
Installed capacity (MW) 7,850 9,587 10,925 13,064 16,084 18,421 20,150 22,465 23,447 26,777 32,280 34,046 35,626 37,669 38,785 40,355 42,633 45,887
Generation (GWh) 28,214 28,604 46,011 52,666 62,036 64,485 59,824 68,640 71,814 83,385

History

Installed wind power capacity
Fiscal year, cumulative capacity (MW)
2005
6,270
2010
16,084
2014
23,354
2015
26,769
2016
32,280
2017
34,046
2018
35,626
2019
37,669
2020
38,785
2021
40,355
2022
42,633
Wind farms in paddy fields in India

Development of wind power in India began in December 1952, when Maneklal Sankalchand Thacker, a distinguished power engineer, initiated a project with the Indian Council of Scientific and Industrial Research (CSIR) to explore the possibilities of harnessing wind power in the country.[18] The CSIR established a Wind Power Sub-Committee under P. Nilakantan, which was assigned the task of investigating the available resources that could be practically utilised, along with researching the economic possibilities of wind energy.[19] With assistance from the Indian Meteorological Department, the Sub-Committee extensively reviewed available data on surface winds in India and their velocity duration, and began detailed surveys of promising sites for harnessing the optimum amount of wind energy; it also successfully developed and tested large wood-and-bamboo windmills.

In September 1954, a Symposium on Solar Energy and Wind Power organised by the CSIR and UNESCO was held in New Delhi; among the attendees was E. W. Golding, a British power engineer and authority on wind energy generation.[18] Convinced of the potential of wind power in India, he recommended continued and extensive wind velocity surveys in different regions of India, the full-time assignment of staff to experimental wind power studies, the establishment of a dedicated research laboratory and development of small to medium-sized wind-powered electrical generators. Golding's recommendations were adopted by the CSIR in 1957.[18] By this time, regions of Saurashtra and around Coimbatore had been identified as promising sites for generating electricity from wind power, and the Wind Power Sub-Committee had begun to erect 20 wind velocity survey stations across India, in addition to testing its indigenously designed windmills and obtaining a 6 kW. Allgaier wind turbine, which was presented to India by the West German government; experiments at Porbandar with the latter had commenced by 1961.[19][18] The Indian government also considered a proposal to erect over 20,000 small to medium-sized wind-powered electrical generators in rural districts, to be used for powering water pumps and supplying electricity for remotely situated structures such as lighthouses.[19]

In 1960, the CSIR established a Wind Power Division as part of the new National Aeronautical Laboratory (NAL) in Bangalore, which was founded that year.[18] From the 1960s into the 1980s, the NAL and other groups continued to carry out wind velocity surveys and develop improved estimates of India's wind energy capacity.[20] Large-scale development of wind power began in 1985 with the first wind project in Veraval, Gujarat, in the form of a 40-kW Dutch machine (make Polenko) connected to the grid. The project, an initiative of late Dr. K S Rao, the then Director of GEDA (Gujarat Energy Development Agency), was a joint venture between GEDA and J K Synthetics Ltd. Though the performance of this machine was quite poor, it established the technical viability of operating wind turbines in the grid-connected mode in India. Subsequently, the Government of India planned several demonstration wind farms in the coastal regions of the country and simultaneously launched a massive programme to identify sites suitable for wind projects. In 1986, demonstration wind farms were set up in the coastal areas of Maharashtra (Ratnagiri), Gujarat (Okha) and Tamil Nadu (Tirunelveli) with 55 kW Vestas wind turbines. These demonstration projects were supported by the Ministry of New and Renewable Energy (MNRE). The demonstration projects set up in 1985–86 established beyond doubt, both the technical and economic viability of the wind energy projects, while the wind-mapping programme resulted in the identification of many sites suitable for wind power projects (C-WET 2001; Mani 1990, 1992, 1994; Mani and Mooley 1983).

The potential for wind farms in the country was first assessed in 2011 to be more than 2,000 GW by Prof. Jami Hossain of TERI University, New Delhi.[21] This was subsequently re-validated by Lawrence Berkley National Laboratory, US (LBNL) in an independent study in 2012. As a result, the MNRE set up a committee to reassess the potential[22] and through the National Institute of Wind Energy (NIWE, previously C-WET) has announced a revised estimation of the potential wind resource in India from 49,130 MW to 302,000 MW assessed at 100 m hub height.[23] Wind turbines are now being set up at even 120 m hub height and the wind resource at higher hub heights of around 120 m or more that are prevailing is possibly even more.

In 2015, the MNRE set the target for Wind Power generation capacity by 2022 at 60,000 MW.[2][24]

East and Northeast regions have no grid-connected wind power plant as of December 2017.

No offshore wind farm is under implementation as of December 2017.[25] However, an Offshore Wind Policy was announced in 2015 and presently weather stations and Lidars are being set up by NIWE at some locations.[26] The first offshore wind farm is planned near Dhanushkodi in Tamil Nadu.[27]

Electricity generation

Wind power accounts for nearly 10% of India's total installed utility power generation capacity and generated 71.814 TWh in the fiscal year 2022–23, which is nearly 4.43% of total electricity generation.[28] The capacity utilization factor is nearly 18% in the fiscal year 2022–23 (19.33% in 2018–19, 16% in 2017–18, 19.62% in 2016–17 and 14% in 2015–16). 70% of annual wind generation is during the five months duration from May to September coinciding with Southwest monsoon duration. In India, solar power is complementary to wind power as it is generated mostly during the non-monsoon period in the daytime.[29] Nearly 60% of the wind power is generated during the night time which is equal to the stored solar power in terms of pricing.[30]

Monthly electricity generation, April 2022 – March 2023[31]
Month North West South East North East Total (GWh)
April 2022 467.46 2,513.64 1,145.12 0 0 4,126.22
May 2022 1,092.60 4,619.10 4,462.57 0 0 10,174.27
June 2022 1,092.44 3,635.86 4,980.22 0 0 9,708.52
July 2022 532.70 3,942.27 5,791.47 0 0 10,266.44
August 2022 548.23 3,163.02 4,983.71 0 0 8,694.96
September 2022 488.82 2,146.59 4,019.08 0 0 6,654.49
October 2022 243.51 1,531.83 1,646.46 0 0 3,421.80
November 2022 248.47 1,197.48 1,043.55 0 0 2,489.50
December 2022 281.01 2,133.49 1,581.65 0 0 3,996.15
January 2023 471.84 2,733.68 1,808.23 0 0 5,013.74
February 2023 274.53 1,434.89 1,417.57 0 0 3,126.99
March 2023 369.80 1,884.13 1,887.13 0 0 4,141.07
Total (GWh) 6,111.41 30,935.99 34,766.76 0 0 71,814.16

Wind power by state

Muppandal Wind Farm in Tamil Nadu

There is a growing number of wind energy installations in states across India. Gujarat has the highest installed wind power capacity, followed by Tamil Nadu.

Installed wind capacity by state as of 31 May 2023[32]
State Total capacity (MW)
Gujarat 10,415.82
Tamil Nadu 10,124.52
Karnataka 5,303.05
Rajasthan 5,193.42
Maharashtra 5,026.33
Andhra Pradesh 4,096.65
Madhya Pradesh 2,844.29
Telangana 128.10
Kerala 62.50
Others 4.30
Total 43,198.98

Gujarat

Gujarat government's focus on tapping renewable energy has led to a sharp rise in the wind power capacity in the last few years. [33] According to official data, wind power generation capacity in the state has increased a staggering ten times in the last six years. Gujarat has the highest share (around 23.9%) of the total installed wind power capacity of the country. Renewable energy projects worth a massive Rs 1 trillion (short scale) of memorandums of understanding (MoUs) in the Vibrant Gujarat Summit in 2017.[34] The single largest wind turbine of 5.2 MW capacity at 120 meters hub height was installed in the state as of November 2022.[35][33] The tallest wind turbine (3 MW) is located at Gondal in Gujarat with 160 m hub height.[36]

Tamil Nadu's total wind capacity was 9608 MW by the end of March 2021, while Gujarat's capacity was approximately 1,000 MW lower, at 8562 MW. However, by the end of January 2023, Gujarat's total wind power capacity had risen to 9,919 MW, while Tamil Nadu's installed wind energy capacity was at 9964 MW. Gujarat gained 710 MW in the current fiscal year, whereas Tamil Nadu added only 99 MW. By mid-2023, Gujarat had surpassed Tamil Nadu in installed capacity.[37][38]

Tamil Nadu

Tamil Nadu's wind production capacity was second highest (around 23% share) after Gujarat as of 31 May 2023. The Government of Tamil Nadu realized the importance and need for renewable energy, and set up a separate Agency, as a registered society, called the Tamil Nadu Energy Development Agency (TEDA) as early as 1985. Tamil Nadu was a leader in Wind Power in India, before being surpassed by Gujarat in 2023. The largest capacity wind turbine of 4.2 MW is installed in Tamil Nadu state as of October 2022.[39] It was surpassed in the next month by a wind turbine of 5.2 MW capacity at 120 meters hub height installed in Mundra, Gujarat in November 2022.[35] In Muppandal windfarm, the total capacity is 1500 MW with nearly 3000 wind turbines, the largest wind power plant in India. The total wind installed capacity in Tamil Nadu is 7633 MW.[40] During the fiscal year 2014–15, the electricity generation is 9.521 GWh, with about a 15% capacity utilisation factor.[41]

Madhya Pradesh

In consideration of a unique concept, Govt. of Madhya Pradesh has sanctioned another 15 MW project to Madhya Pradesh Windfarms Ltd. MPWL, Bhopal at Nagda Hills near Dewas under consultation from Consolidated Energy Consultants Ltd. CECL Bhopal. All 25 WEGs have been commissioned on 31 March 2008 and are under successful operation.[42]

Odisha

Odisha a coastal state has a higher potential for wind energy. The current installed capacity stands at 2.0 MW. Odisha has a wind power potential of 1700MW. The Govt of Odisha is actively pursuing to boost Wind power generation. However, it has not progressed like other states primarily because Odisha having a huge coal reserve and a number of existing and upcoming thermal power plants, is a power surplus state.[43]

Ladakh

The union territory of Ladakh and its Kargil district are potential wind energy areas, which are yet to be exploited.[23]

Projects

India's largest wind power production facilities (20 MW and greater)[44][45]

Windmills on the Tirumala hills in Andhra Pradesh
A wind farm in Rajasthan
Wind turbines in India's agricultural farms
Power plant Location State MWe Producer Ref
Kutch Wind Farm (Gujarat Hybrid Renewable Energy Park) Kutch Gujarat 11,500 (wind)

+ 11,500 (solar + wind)

Adani Group[46] Suzlon[47] [48][49]
Muppandal Wind Farm Kanyakumari Tamil Nadu 1500 Muppandal Wind [50]
Jaisalmer Wind Park Jaisalmer Rajasthan 1064 Suzlon Energy [51]
Brahmanvel windfarm Dhule Maharashtra 528 Parakh Agro Industries [52]
Kayathar Tutcorin Tamilnadu 300 Siemens Gamesa, ReNew Power
Dhalgaon windfarm Sangli Maharashtra 278 Gadre Marine Exports [53]
Vankusawade Wind Park Satara district Maharashtra 259 Suzlon Energy Ltd. [54]
Vaspet Vaspet Maharashtra 144 ReNew Power
Tuljapur Osmanabad Maharashtra 126 Siemens Gamesa, ReNew Power
Sipla Jaisalmer Rajasthan 102 CLP Wind Farms (India) Private Ltd [55]
Saeame Jamnagar Gujarat 101 CLP Wind Farms (India) Private Ltd [56]
Beluguppa Wind Park Beluguppa Andhra Pradesh 100.8 Orange Renewable
Mamatkheda Wind Park Mamatkheda Madhya Pradesh 100.5 Orange Renewable
Anantapur Wind Park Nimbagallu Andhra Pradesh 100 Orange Renewable
Damanjodi Wind Power Plant Damanjodi Odisha 99 Suzlon Energy Ltd.
Theni Tamil Nadu 99 CLP Wind Farms (India) Private Ltd [57]
Saundatti Belgaum Karnataka 84 CLP Wind Farms (India) Private Ltd [58]
Jath Jath Maharashtra 84 ReNew Power
Welturi Welturi Maharashtra 75 ReNew Power
Acciona Tuppadahalli Chitradurga District Karnataka 56.1 Tuppadahalli Energy India Pvt Ltd
Dangiri Wind Farm Jaiselmer Rajasthan 54 Oil India Ltd.
Nuziveedu Seeds Bhimasamudra Karnataka 50.4 NSL Renewable Power Pvt Ltd.
Khandke Ahmednagar Maharashtra 50 CLP Wind Farms (India) Private Ltd [59]
Narmada Nallakonda Andhra Pradesh 50 CLP Wind Farms (India) Private Ltd [60]
Bercha Wind Park Ratlam Madhya Pradesh 50 Orange Renewable
Harapanahalli Davanagere Karnataka 40 CLP Wind Farms (India) Private Ltd. [61]
Cape Comorin Kanyakumari Tamil Nadu 33 Aban Loyd Chiles Offshore Ltd.
Kayathar Subhash Kayathar Tamil Nadu 30 Subhash Ltd.
Dedan Rajula (Sawarkundla) Gujarat 30 IB Vogt Solar India Pvt Ltd.
Jasdan Jasdan Gujarat 25.0 NTPC LTD.
Ramakkalmedu Ramakkalmedu Kerala 25 Subhash Ltd.
Gudimangalam Gudimangalam Tamil Nadu 21 Gudimangalam Wind Farm
Shalivahana Wind Tirupur Tamil Nadu 20.4[62] Shalivahana Green Energy. Ltd.
Puthlur RCI Puthlur Andhra Pradesh 20 Wescare (India) Ltd.

Repowering wind power projects

The union government has released a policy for the repowering of wind power projects which states that the repowering potential is nearly 25,406 MW.[63] The policy includes the installation of additional wind turbines, of minimum 3 MW capacity each with hub heights above 120 meters, located in between the existing wind turbines in place of few existing turbines without any effect on one another's performance.[64][65][66][67] Increasing the hub height also enhances the average wind speed captured by the turbine, thanks to the wind profile power law.[68][69] Spacing between wind turbines in a wind farm can be optimized by yaw control minimizing the wake effect to enhance the capacity density (MW per square km).[70][71] With the advent of towers made of wood up to 100 meters tall, the top half of the tower can be of light weight wood structure to locate wind turbines above 200 m height.[72]

Additional electricity can be produced by covering the south-facing façade area of the wind turbine towers/masts with solar panels up to the rotor bottom tip height at an economical price.[73][74]

Offshore wind power plants

India has an offshore wind energy potential of around 70 GW in parts along the coast of Gujarat and Tamil Nadu.[75][76] As of May 2022, there is no offshore wind project under construction or operation.[77] India has announced tentative schedule for calling request for quotation (RfQ) to establish off shore wind power projects.[78]

India started planning in 2010 to enter into offshore wind power,[79] and a 100 MW demonstration plant located off the Gujarat coast began planning in 2014.[80] In 2013, a consortium (instead of a group of organisations), led by Global Wind Energy Council (GWEC) started project FOWIND (Facilitating Offshore Wind in India) to identify potential zones for development of offshore wind power in India and to stimulate R & D activities in this area.[81] The other consortium partners include the Centre for Study of Science, Technology and Policy (CSTEP), DNV GL, the Gujarat Power Corporation Limited (GPCL) and the World Institute of Sustainable Energy (WISE). The consortium was awarded a grant of €4.0 million by the delegation of the European Union to India in 2013 besides co-funding support from GPCL. The project activities will be implemented from December 2013 to March 2018.

The project focuses on the States of Gujarat and Tamil Nadu for the identification of potential zones for development through techno-commercial analysis and preliminary resource assessment. It will also establish a platform for structural collaboration and knowledge sharing between stakeholders from European Union and India, on offshore wind technology, policy, regulation, industry, and human resource development. FOWIND activities will also help facilitate a platform to stimulate offshore wind-related R&D activities in the country. The consortium published initial pre-feasibility assessment reports for offshore wind farm development in Gujarat and Tamil Nadu on 16 June 2015.[82][83] In September 2015, India's cabinet has approved the National Offshore Wind Energy Policy. With this, the Ministry of New & Renewable Energy (MNRE) has been authorised as the Nodal Ministry for use of offshore areas within the Exclusive Economic Zone (EEZ).[84]

India seems pacing up rapidly towards offshore wind energy development as the Nodal Ministry (MNRE) & Nodal Agency (NIWE) calls with the Expression of Interest (EoI)[85] inviting the bidders for development of first 1000MW commercial-scale offshore wind farm in India, near the coast of Gujarat. The EoI published on 16 April 2018, specifies the proposed area identified under the FOWIND & FOWPI study funded by European Union. The proposed location of the offshore wind farm could be 23–40 km off the coast from the Pipavav port, Gulf of Khambhat. The proposed area covers about 400sq km. The wind measurements & other data collection are in progress under the supervision of NIWE.

See also

References

  1. ^ "Global Wind Atlas". Archived from the original on 18 January 2019. Retrieved 4 December 2018.
  2. ^ a b "Physical Progress (Achievements)". Ministry of New and Renewable Energy, GoI. Archived from the original on 12 April 2020. Retrieved 15 April 2020.
  3. ^ "Installed capacity of wind power projects in India". indianwindpower.com. Indian Wind Turbine Manufacturers Association. Archived from the original on 19 May 2019. Retrieved 7 April 2018.
  4. ^ "India's Wind Potential Atlas at 120m agl" (PDF). National Institute Of Wind Energy. Retrieved 16 May 2024.
  5. ^ "Wind power installations will cross 8,000 MW next year: Tulsi Tanti". 6 March 2019. Archived from the original on 5 December 2019. Retrieved 9 March 2019.
  6. ^ "Wind power tariffs in Gujarat auctions fall to Rs 2.43 per unit". The Economic Times. Archived from the original on 22 July 2018. Retrieved 22 December 2017.
  7. ^ "Wind energy tariffs do not fall further in latest auction for 2,000 Mw". The Economic Times. Archived from the original on 22 July 2018. Retrieved 15 February 2018.
  8. ^ "SECI's 1.2 GW Wind Auction Sees Lowest Tariff of ₹2.82/kWh". 15 February 2019. Archived from the original on 30 June 2019. Retrieved 15 February 2019.
  9. ^ "Juniper, EDF Renewables, ACME, and Solarcraft Win GUVNL's 300 MW Wind Auction". Retrieved 7 May 2023.
  10. ^ "Lowest Tariff of ₹2.77/kWh Quoted in SECI's 1.2 GW Wind Auction". Archived from the original on 16 March 2021. Retrieved 19 February 2021.
  11. ^ "Govt issues guidelines for tariff-based wind power auction". 12 December 2017. Retrieved 12 December 2017.
  12. ^ "How Much Land Would It Require To Get Most Of Our Electricity From Wind & Solar?". NREL. 25 February 2023. Retrieved 27 February 2023.
  13. ^ "Inertia and the Power Grid: A Guide Without the Spin" (PDF). NREL. Retrieved 25 March 2023.
  14. ^ "Monthly wind generation" (PDF). Archived (PDF) from the original on 19 June 2018. Retrieved 16 September 2017.
  15. ^ "Overview of renewable power generation, CEA". Archived from the original on 21 April 2021. Retrieved 23 April 2021.
  16. ^ "All India installed capacity of power stations" (PDF). March 2019. Archived (PDF) from the original on 18 April 2019. Retrieved 26 April 2019.
  17. ^ "Monthly Renewable Energy Generation Report, March 2012" (PDF). CEA. Retrieved 29 June 2022.
  18. ^ a b c d e "Wind as a Source of Energy in India" (PDF). Current Science. 30 (3): 95. January 1961. Archived (PDF) from the original on 5 December 2019. Retrieved 1 April 2018.
  19. ^ a b c "Utilization of Wind Power in India" (PDF). Current Science. 25 (6): 180–181. June 1956. Archived (PDF) from the original on 5 December 2019. Retrieved 1 April 2018.
  20. ^ Mani, Anna (1995). Wind Energy Resource Survey in India – I. New Delhi: Allied Publishers Limited. p. 185. ISBN 81-7023-297-X.
  21. ^ Hossain, Jami; Sinha, Vinay; Kishore, V.V.N. (2011). "A GIS based assessment of potential for windfarms in India". Renewable Energy. 36 (12): 3257–3267. doi:10.1016/j.renene.2011.04.017. S2CID 109144288.
  22. ^ Hossain, Jami; Mr. Neelu Kumar Mishra; Ansari, Mohammad Ziaulhaq; Deepthi Swamy; Bhardwaj, Anshu; Pareexit Chauhan; Disha Agarwal; Gupta, Deepak; Sharma, Deepshikha (2015). "India Wind Power Potential". doi:10.13140/RG.2.1.2193.0967. {{cite journal}}: Cite journal requires |journal= (help)
  23. ^ a b "Estimation of Installable Wind Power Potential at 80 m level in India". Archived from the original on 2 April 2019. Retrieved 16 May 2015.
  24. ^ "Tentative State-wise break-up of Renewable Power target to be achieved by 2022 So that cumulative achievement is 1,75,000 MW" (PDF). mnre.gov.in. Archived (PDF) from the original on 2 July 2019. Retrieved 7 May 2015.
  25. ^ "Offshore Wind Costs Fall Below New Nuclear Plants in U.K." 11 September 2017. Archived from the original on 15 September 2017. Retrieved 17 September 2017.
  26. ^ "Offshore Wind Costs Fall Below New Nuclear Plants in U.K." Bloomberg.com. 11 September 2017. Archived from the original on 1 May 2018. Retrieved 7 January 2018.
  27. ^ "Arichamunai to get India's first offshore wind turbines". The Hindu. 18 March 2018. Archived from the original on 5 December 2019. Retrieved 20 March 2018.
  28. ^ "CEA monthly utility electricity generation" (PDF). Archived (PDF) from the original on 3 May 2019. Retrieved 3 May 2019.
  29. ^ "ReGen enters solar power with hybrid solution". Business Standard India. Indo-Asian News Service. 18 July 2015. Archived from the original on 5 March 2016. Retrieved 16 October 2015.
  30. ^ Nyenah, Emmanuel; Sterl, Sebastian; Thiery, Wim (1 May 2022). "Pieces of a puzzle: solar-wind power synergies on seasonal and diurnal timescales tend to be excellent worldwide" (PDF). Environmental Research Communications. 4 (5): 055011. Bibcode:2022ERCom...4e5011N. doi:10.1088/2515-7620/ac71fb.
  31. ^ "Monthly Renewable Energy Generation Report, CEA". Retrieved 30 April 2023.
  32. ^ "State-wise installed capacity of Renewable Power as on 31.05.2023".
  33. ^ a b "Gujarat pips TN in installed wind energy capacity". The Times of India. 23 June 2023. ISSN 0971-8257. Retrieved 23 June 2023.
  34. ^ "Vibrant Gujarat Summit: Rs 1 lakh crore fuel to fire up renewable energy". The Times of India. Archived from the original on 20 May 2017. Retrieved 17 January 2017.
  35. ^ a b "Adani New Industries installs India's largest wind turbine, taller than Statue of Unity". Retrieved 4 November 2022.
  36. ^ "Suzlon's S144-3 MW series gets RLMM listing by MNRE". Retrieved 19 November 2023.
  37. ^ Balachandar, G. (24 February 2023). "Gujarat closes in on Tamil Nadu's leadership position in wind power race". BusinessLine. Retrieved 28 August 2023.
  38. ^ Balachandar, G. (11 June 2023). "Gujarat pips Tamil Nadu as the leader in wind energy capacity". BusinessLine. Retrieved 28 August 2023.
  39. ^ Sudhakar, P. (5 October 2022). "India's first 4.20-MW wind turbine generator to be commissioned soon in Tirunelveli district". The Hindu. Retrieved 31 October 2022.
  40. ^ [1] Archived 27 May 2019 at the Wayback Machine, Tamil Nadu Energy Development Agency – Site.
  41. ^ "SRLDC monthly report, March 2015" (PDF). Archived (PDF) from the original on 4 March 2016. Retrieved 8 May 2015.
  42. ^ "Developer of Wind Power Estate". Wind Power India. Archived from the original on 7 December 2009. Retrieved 27 November 2010.
  43. ^ "Wind power and solar energy in Odisha". REVE. 4 April 2012. Retrieved 4 April 2012.
  44. ^ "Plant wise details of Renewable Energy Installed Capacity" (PDF). Archived (PDF) from the original on 25 March 2020. Retrieved 21 March 2020.
  45. ^ "Indian Wind Energy – Projects, Companies, Research, Data, Statistics – Energy Alternatives India". EAI.in. Archived from the original on 20 October 2010. Retrieved 27 November 2010.
  46. ^ www.ETEnergyworld.com. "Adani New Industries installs India's largest wind turbine, taller than Statue of Unity - ET EnergyWorld". ETEnergyworld.com. Retrieved 28 August 2023.
  47. ^ "Suzlon surpasses 1100 MW milestone at Asia's largest wind farm in Kutch, Gujarat". Suzlon.
  48. ^ "Kutch (India) - Wind farms - Online access - The Wind Power". www.thewindpower.net. Retrieved 28 August 2023.
  49. ^ "Explained: A look at India's sprawling renewable energy park, coming up on its border with Pakistan". The Indian Express. 5 December 2020. Retrieved 28 August 2023.
  50. ^ "Muppandal windfarm". Archived from the original on 3 February 2014. Retrieved 2 February 2014.
  51. ^ "Jaisalmer windfarm". Archived from the original on 3 February 2014. Retrieved 2 February 2014.
  52. ^ "Brahmanvel windfarm (India)". Archived from the original on 3 February 2014. Retrieved 2 February 2014.
  53. ^ "Dhalgaon windfarm". Archived from the original on 3 February 2014. Retrieved 2 February 2014.
  54. ^ "Vankusawade Wind Farm". Global Energy Observatory. Retrieved 10 May 2014.
  55. ^ "Sipla Wind Farm". CLP Group. Archived from the original on 29 July 2012. Retrieved 6 September 2012.
  56. ^ "Samana Wind Farm". CLP Group. Archived from the original on 15 June 2012. Retrieved 6 September 2012.
  57. ^ "Theni Wind Farm". CLP Group. Archived from the original on 15 June 2012. Retrieved 6 September 2012.
  58. ^ "Saundatti Wind Farm". CLP Group. Archived from the original on 29 July 2012. Retrieved 6 September 2012.
  59. ^ "Khandke Wind Farm". CLP Group. Archived from the original on 29 July 2012. Retrieved 6 September 2012.
  60. ^ "Narmada Wind Farm". CLP Group. Archived from the original on 15 June 2012. Retrieved 6 September 2012.
  61. ^ "Harapanahalli Wind Farm". CLP Group. Archived from the original on 15 June 2012. Retrieved 6 September 2012.
  62. ^ "Shalivahana Green Energy | Hydel Energy". Shalivahanagroup.com. Archived from the original on 17 August 2018. Retrieved 17 September 2012.
  63. ^ "National Policy for Repowering of the Wind Power Projects" (PDF). Retrieved 9 December 2023.
  64. ^ "Construction of world's tallest wind turbine starts in German lignite region". 25 September 2024. Retrieved 27 September 2024.
  65. ^ "Wind power basics". Danish Wind Power Association. Retrieved 19 October 2022.
  66. ^ "Danish Company To Build World's Tallest Onshore Wind Turbine". Retrieved 19 October 2022.
  67. ^ "300-metre wind power testing mast in Germany hoped to herald new turbine generation". 8 May 2023. Retrieved 9 May 2023.
  68. ^ Hoen, Ben; Darlow, Ryan; Haac, Ryan; Rand, Joseph; Kaliski, Ken (2023). "Effects of land-based wind turbine upsizing on community sound levels and power and energy density". Applied Energy. 338: 120856. doi:10.1016/j.apenergy.2023.120856. S2CID 257590321.
  69. ^ "How windy does it have to be?". Retrieved 27 December 2022.
  70. ^ "Tweaking turbine angles squeezes more power out of wind farms". 15 December 2022. Retrieved 27 December 2022.
  71. ^ "Technology Advanceents Could Unlock 80% More Wind Energy Potential During This Decade". NREL. 2023. Retrieved 23 September 2023.
  72. ^ "The World's Tallest Wooden Wind Turbine Is Now Online". Retrieved 31 December 2023.
  73. ^ "Solar tower of power shows benefits of vertical installations". 2 March 2023. Retrieved 5 March 2023.
  74. ^ "Agrivoltaics in India: Fertile Ground?" (PDF). Retrieved 29 January 2023.
  75. ^ "Gujarat and Tamil Nadu Have Offshore Wind Energy Potential of 70 GW: MNRE". Archived from the original on 8 January 2020. Retrieved 8 January 2020.
  76. ^ "Offshore wind potential map of India" (PDF). Retrieved 28 August 2022.
  77. ^ "Winds of Change: Learnings for the Indian Offshore Wind Energy Sector" (PDF). WRII. Retrieved 29 June 2022.
  78. ^ "Strategy for Establishment of Offshore Wind Energy Projects" (PDF). Retrieved 29 September 2023.
  79. ^ Chadha, Mridul (15 November 2010). "Offshore Wind Energy Coming to India Soon?". cleantechnica.com. Archived from the original on 29 October 2018. Retrieved 25 December 2017.
  80. ^ "MOU Signed for First-Ever Offshore Wind Power Project in India". Press Information Bureau, Government of India. 1 October 2014. Archived from the original on 5 October 2017. Retrieved 30 April 2015.
  81. ^ "FOWIND Project". Archived from the original on 3 June 2019. Retrieved 13 August 2015.
  82. ^ "FOWIND Project". Retrieved 13 August 2015.
  83. ^ R. Srikanth; Sangeetha Kandavel (29 January 2015). "Tapping the offshore wind". The Hindu. Archived from the original on 23 January 2019. Retrieved 30 April 2015.
  84. ^ "National Offshore Wind Power Policy 2015". GKToday. 3 November 2015. Archived from the original on 2 June 2017. Retrieved 3 November 2015.
  85. ^ "EoI- First 1000MW commercial scale Offshore Wind farm in India" (PDF). Archived (PDF) from the original on 19 April 2018. Retrieved 19 April 2018.