Wind power in Croatia has been growing since the first wind farm was installed in the country in 2004.[1] During 2021, the energy produced from wind farms amounted to 1,904 GWh.[2] The total wind power grid-connected capacity in Croatia was 1,143 MW as of 2023.[3]

History

The first wind farm was installed on the island of Pag in 2004.[1] In 2006 another farm opened near Šibenik. On July 1, 2007 the Croatian Government enacted five bylaws on incentives to electricity generation from renewable resources, including feed-in tariffs.[4]

Currently in Croatia there's a total of 364 wind turbines which generate total of 970.15 MW or electric energy, but with new turbines coming on-line all the time, it is expected that by mid 2020s total installed power will reach 3,200 MW,[5] As of early 2020 Croatia generates around 28.3% renewable energy, Government hopes Croatia could generate around 37.5% renewable energy from wind and solar by 2030 and has adopted new strategy to achieve that target.[6] By the end of 2021 renewable energy in Croatia is expected to generate around 1060 MW from Wind and Solar alone or around 32% of all energy consumption from renewable energy source, Croatia exceeded EU's renewable energy targets and exceed that by a wide margin. In 2020 country generated 28.3% of all its energy from the renewable sources of energy, installed capacity at the end of 2020 includes 89 MW Solar farms[7] and these are set to double in 2021 to 184 MW installed capacity,[8] 803.1 MW Wind farm are set to increase to at least 875 MW by end of 2021, and other sources such as biomass and other sources will exceed 2020 figure of total 3,226 MW installed renewable energy generation by significant margin.[9][10] At present rate of growth and planned investments over next 5-7 year period, energy generated from Wind and solar should easily reach 40% of total energy consumption in Croatia with 50% highly probable, achieving targets set by Germany, Sweden, Norway, Denmark, Finland and Austria. Although Croatian Government has set modest targets in terms of renewable energy share of total energy consumption, initially 20% by 2020 and now modest 37.5% by 2030 or 54% by 2050, the country is rapidly approaching targets set for 2050, at current rate of expansion of renewable sources in Croatia, it is quite possible by 2035 Croatia will meet its 2050 targets, some 15 years ahead.

List of wind farms

Wind farm Production capacity
(MW)
Annual
production
(GWh)
Wind turbines Year of commissioning Source
VE Senj 156 530 39 x Shanghai Electric – 4.0 MW 2021 [11]
VE Krš-Pađene 142 480 48 x Nordex 2021
VE Korlat 58 170 18 x Nordex – 3.2 MW 2021 [12]
VE Lukovac 48 110 7 x GE Energy – 2.85 MW
9 x GE Energy – 3.2 MW
2017 [13]
VE Poštak 44.2 100 13 × Siemens – 3.4 MW 2017 [14]
VE Danilo 43.7 100 19 × Enercon – 2.3 MW 2014 [15]
VE Vrataruša 42 125 14 × Vestas – 3 MW 2010 [16]
VE Zelengrad 42 110 14 × Vestas – 3 MW 2014 [17]
VE Ogorje 42 100 14 × Vestas – 3 MW 2015 [18]
VE Kamensko-Voštane 40 114 14 × Siemens – 3 MW 2013 [19]
VE Bruška 36.8 122 16 × Siemens – 2.3 MW 2011 [20]
VE Ponikve 36.8 122 16 × Enercon – 2.3 MW 2012 [21]
VE Rudine 34.2 85 12 × GE Energy – 2.85 MW 2015 [22]
VE Katuni 34.2 95 12 × GE Energy – 2.85 MW 2016 [23]
VE Ljubač 32.4 96 9 x Nordex – 3.6 MW 2022 [24]
VE Jelinak 30 81 20 × Acciona – 1.5 MW 2013 [25]
VE Glunča 20.7 53 9 x Enercon – 2.3 MW 2016 [26]
VE Pometeno brdo 20 50 15 × Končar – 1 MW
2 × Končar – 2.5 MW
2015 [27]
VE Jasenice 11.5 44 5 x Enercon – 2.3 MW 2020 [28]
VE Trtar-Krtolin 11.2 28 14 × Enercon – 0.8 MW 2007 [29]
VE Crno brdo 10.5 27 7 × Leitwind – 1.5 MW 2011 [30]
VE Orlice 9.6 25 3 x Enercon – 0.8 MW
8 x Enercon – 0.9 MW
2009 [31]
VE Velika Popina 9.2 26 4 × Siemens – 2.3 MW 2011 [32]
VE Zadar 4 9.2 30 4 × Siemens – 2.3 MW 2013 [33]
VE Ravne 1 5.95 15 7 × Vestas – 0.85 MW 2004 [34]
In total 970.15 2,838 364 2004–2022

See also

References

  1. ^ a b "Supply: Energy Sources". Archived from the original on 2019-03-23. Retrieved 2008-11-01.
  2. ^ Ivanković, Igor (2022). "Godišnje izvješće 2021" [Annual report 2021] (PDF). HOPS (in Croatian). Zagreb: Hrvatski operator prijenosnog sustava. Retrieved 16 June 2022.
  3. ^ "Renewable Capacity Statistics 2024" (PDF). www.developmentaid.org.
  4. ^ Ognjan, Diana; Stanić, Zoran; Tomšić, Željko (13 March 2008). "Isplativost poticajne otkupne cijene za projekte vjetroelektrana u Republici Hrvatskoj" [Profitability of Incentive Purchase Prices for Wind farm Projects in Croatia]. Energija. 57 (2). Zagreb, Croatia: 178–199 – via Hrčak.
  5. ^ "Aktivne 204 elektrane koje koriste obnovljive izvore energije" [204 active power plants using renewable energy sources]. Večernji list (in Croatian). 4 May 2013. Retrieved 15 June 2022.
  6. ^ "Government adopts national action plan for renewables". 2013-10-17. Archived from the original on 2013-12-21.
  7. ^ "National Energy and Climate Plan Croatia". Archived from the original on 2021-05-22.
  8. ^ "Product". WindEurope.
  9. ^ "CROATIA RENEWABLE ENERGY". International Trade Administration. 23 March 2022. Retrieved 16 August 2022.
  10. ^ Renewable capacity statistics 2021 (PDF). Abu Dhabi: International Renewable Energy Agency (IRENA). 2021. ISBN 978-92-9260-342-7.
  11. ^ "VE Senj: ususret montaži vjetroagregata" [VE Senj: towards the installation of wind turbines]. energetika-net (in Croatian). 21 September 2020. Retrieved 24 November 2021.
  12. ^ "U rad puštena Vjetroelektrana Korlat" [Korlat Wind Farm was put into operation]. HRT (in Croatian). 28 April 2021. Retrieved 26 October 2021.
  13. ^ "Lukovac(Croatia)". The Wind Power. 26 October 2021. Retrieved 26 October 2021.
  14. ^ Vjetroelektrana Poštak. Porzana. 16 March 2018. Archived from the original on 28 October 2021. Retrieved 17 April 2022 – via YouTube.
  15. ^ Jerkić, Leo (7 June 2014). "Službeno završeno testiranje pogona vjetroelektrane Danilo" [Officially completed testing of the Danilo wind farm]. vjetroelektrane.com (in Croatian). Retrieved 15 June 2022.
  16. ^ Jerkić, Edo (8 April 2011). "Vjetroelektrana Vrataruša" [Wind farm Vrataruša]. vjetroelektane.com (in Croatian). Retrieved 16 June 2022.
  17. ^ "Danas se otvara vjetroelektrana Zelengrad – Obrovac". www.vecernji.hr (in Croatian). Retrieved 2023-10-07.
  18. ^ "Litvanska tvrtka kupila vjetropark u Ogorju i infrastrukturu za buduću gradnju kraj Zadra". www.direktno.hr (in Croatian). Archived from the original on 2018-09-29. Retrieved 2023-10-07.
  19. ^ "U Trilju otvorena vjetroelektrana". www.poslovni.hr (in Croatian). Retrieved 2023-10-07.
  20. ^ "Vjetroelektrana Bruška" [Wind farm Bruška]. vjetroelektrane.com (in Croatian). 3 April 2012. Retrieved 16 June 2022.
  21. ^ Zelenko, Iva (23 May 2013). "Otvorena vjetroelektrana Ponikve" [Wind farm Ponikve opened]. vjetroelektrane.com (in Croatian). Retrieved 16 June 2022.
  22. ^ Jerkić, Leo (29 April 2016). "Puštena u rad vjetroelektrana Rudine vrijedna 400 milijuna-kuna" [The Rudine wind farm worth HRK 400 million was put into operation]. vjetroelektrane.com (in Croatian). Retrieved 16 June 2022.
  23. ^ "Web Server's Default Page". katuni.wpd-group.com.
  24. ^ "VE Ljubač: Petrol otvorio svoj drugi vjetropark u Hrvatskoj" [WPP Ljubač: Petrol opened its second wind farm in Croatia]. Ekovjesnik (in Croatian). 10 May 2022. Retrieved 16 June 2022.
  25. ^ "Vjetroelektrana Jelinak u probnom pogonu". www.vjetroelektrane.com (in Croatian). Retrieved 2023-10-07.
  26. ^ "Projekti vjetroelektrana". www.tecoi.hr (in Croatian). Retrieved 2023-10-07.
  27. ^ Zelenko, Iva (3 April 2012). "Dovršena prva faza izgradnje VE Pometeno brdo" [The first phase of construction of WPP Pometeno brdo has been completed]. vjetroelektrane.com (in Croatian). Retrieved 16 June 2022.
  28. ^ Jasenice (Croatia) - Wind farms - Online access - The Wind Power pristupljeno 13. travnja 2021.
  29. ^ Jerkić, Edo (28 March 2011). "Vjetroelektrana Trtar-Krtolin" [Wind farm Trtar-Krtolin]. vjetroelektrane.com (in Croatian). Retrieved 16 June 2022.
  30. ^ Jerkić, Edo (13 September 2012). "Vjetroelektrana Crno Brdo" [Wind farm Crno Brdo]. vjetroelektrane.com (in Croatian). Retrieved 16 June 2022.
  31. ^ Jerkić, Edo (1 April 2011). "Vjetroelektrana Orlice" [Wind farm Orlice]. vjetroelektrane.com (in Croatian). Retrieved 16 June 2022.
  32. ^ Jerkić, Edo (25 November 2010). "Vjetroelektrana Velika Popina" [Wind farm Velika Popina]. vjetroelektrane.com (in Croatian). Retrieved 16 June 2022.
  33. ^ "Eko Zadar Dva gradi vjetroelektranu u Bukovici". www.energetika-net.com (in Croatian). 2013-04-16. Retrieved 2023-10-07.
  34. ^ Jerkić, Nives (7 December 2010). "Vjetroelektrana Ravne 1, Pag" [Wind farm Ravne 1, Pag]. vjetroelektrane.com (in Croatian). Retrieved 16 June 2022.

Read other articles:

Liga 3 Lampung 2023Negara IndonesiaTanggal penyelenggaraan3 Januari 2024Tempat penyelenggaraan1 stadionJumlah peserta6 tim sepak bolaJuara bertahanAD Sport FCJuaraTS Saiburai Lampung(gelar ke-1)Tempat keduaPSBL Bandar LampungTempat ketigaSS Lampung FCKualifikasi untukLiga 3 2023 Putaran Nasional← 2022 (ditiadakan) 2024 → Liga 3 Lampung 2023 adalah edisi keenam dari Liga 3 Lampung yang diselenggarakan oleh Asprov PSSI Lampung.[1] Diikuti oleh 6 klub. Juara kompetisi ini akan l...

 

This article has multiple issues. Please help improve it or discuss these issues on the talk page. (Learn how and when to remove these template messages) This article contains content that is written like an advertisement. Please help improve it by removing promotional content and inappropriate external links, and by adding encyclopedic content written from a neutral point of view. (June 2015) (Learn how and when to remove this template message) This article relies excessively on references t...

 

VimpelCom beralih ke halaman ini. Untuk perusahaan Rusia yang didirikan pada tahun 1992, lihat PJSC VimpelCom. VEON Ltd.SebelumnyaVimpelCom Ltd. (2009–2017)JenisPublikKode emitenNasdaq: VEONEuronext: VEONIndustriTelekomunikasiPendahuluPJSC VimpelCom dan KyivstarDidirikan2009; 15 tahun lalu (2009)PendiriDmitry Zimin Augie K. FabelaKantorpusatAmsterdam, BelandaWilayah operasiSeluruh duniaTokohkunciGennady Gazin (ketua) Kaan Terzioğlu dan Sergi Herrero (CEO)ProdukTelepon selule...

UppsalaUpsal La cathédrale d'Uppsala, achevée au XVe siècle. Administration Pays Suède Province historique Uppland Comté Uppsala Commune Uppsala Paroisse Danmark (sv), Gamla Uppsala (sv), Gottsunda (sv), Helga Trefaldighet (sv), Vaksala (sv) Statut de ville 1286 Démographie Population 168 096 hab. (2017) Densité 3 447 hab./km2 Géographie Coordonnées 59° 50′ 00″ nord, 17° 40′ 00″ est Superficie ...

 

Kerajaan Portugal [nb 1]Regnum Portugalliae Reino de Portugal1139–1910 Bendera tahun 1826-1830 (atas), Bendera 1830–1910 (bawah) Lambang 1640–1910 Lagu kebangsaan: Hymno Patriotico (1809-1834)Hino da Carta (1834-1910)Kerajaan Portugal dan imperiumnya (1800)Ibu kotaCoimbra(1139–1255)Lisbon[a](1255–1808)Rio de Janeiro(1808–21)Lisbon(1821–1910)Bahasa yang umum digunakanPortugis[nb 2]Latin[nb 3]Agama Katolik RomaPemerintahanMonarki absolut(1139–18...

 

Species of flounder found in the North Pacific Ocean This article is about the Pacific Dover sole. It is not to be confused with the common sole. Microstomus pacificus Conservation status Least Concern  (IUCN 3.1)[1] Scientific classification Domain: Eukaryota Kingdom: Animalia Phylum: Chordata Class: Actinopterygii Order: Pleuronectiformes Family: Pleuronectidae Genus: Microstomus Species: M. pacificus Binomial name Microstomus pacificus(Lockington, 1879) Synonyms Glyptocep...

Artikel atau sebagian dari artikel ini mungkin diterjemahkan dari Andaman and Nicobar Islands di en.wikipedia.org. Isinya masih belum akurat, karena bagian yang diterjemahkan masih perlu diperhalus dan disempurnakan. Jika Anda menguasai bahasa aslinya, harap pertimbangkan untuk menelusuri referensinya dan menyempurnakan terjemahan ini. Anda juga dapat ikut bergotong royong pada ProyekWiki Perbaikan Terjemahan. (Pesan ini dapat dihapus jika terjemahan dirasa sudah cukup tepat. Lihat pula: pand...

 

Danau QiandaoDanau Qiandao dilihat dari atas menara loncengLetakCounty Chun'an, ZhejiangKoordinat29°36′33″N 118°59′24″E / 29.60917°N 118.99000°E / 29.60917; 118.99000Koordinat: 29°36′33″N 118°59′24″E / 29.60917°N 118.99000°E / 29.60917; 118.99000Jenis perairanWadukTerletak di negaraTiongkokArea permukaan573 km2 (221 sq mi)Kedalaman rata-rata26 m (85 ft).Kedalaman maksimal120 m (394 ft).V...

 

Ini adalah nama Korea; marganya adalah Kwon. Loco권혁우Loco pada tahun 2022Informasi latar belakangNama lahirKwon Hyuk-wooLahir25 Desember 1989 (umur 34)Seoul, Korea SelatanGenreHip hop KoreaPekerjaanRapperTahun aktif2012–sekarangLabelAOMGArtis terkaitJay Park, Crush, Gray, Zion.T, Woo Won-jae, HwasaNama KoreaHangul권혁우 Alih AksaraGwon Hyeok-uMcCune–ReischauerKwŏn Hyŏku Kwon Hyuk-woo (Hangul: 권혁우; lahir 25 Desember 1989), lebih dikenal dengan nama panggungnya Loco (Ha...

Town in Slovakia Town in SlovakiaKremnicaTownWinter in Kremnica Coat of armsKremnicaLocation of Kremnica in the Banská Bystrica RegionShow map of Banská Bystrica RegionKremnicaKremnica (Slovakia)Show map of SlovakiaCoordinates: 48°41′59″N 18°54′57″E / 48.69972°N 18.91583°E / 48.69972; 18.91583Country SlovakiaRegionBanská BystricaDistrictŽiar nad HronomFirst mentioned1328Government • MayorMartin Novodomec (KDH)Area[1] •...

 

River AlexanderLahirRiver Alexander Aguirre29 November 1999 (umur 24)[1] Southwest Ranches, Florida, Amerika SerikatTahun aktif2009 - sekarang River Alexander (lahir 29 November 1999) adalah aktor berkebangsaan Amerika Serikat. Kehidupan dan karier Alexander lahir di Southwest Ranches, Florida. Dia memulai karier akting profesional pada 2010 dengan produksi Caroline, or Change. Dalam produksi ini ia tampil sebagai Joe Thibodeaux.[2] Tak lama setelah menyelesaikan Ca...

 

Archaeological culture of Mesopotamia Early Dynastic Periodc. 2900 – c. 2350 BCGeographical rangeMesopotamiaPeriodBronze AgeDatesfl. c. 2900 – c. 2350 BC (middle)Type siteTell Khafajah, Tell Agrab, Tell AsmarMajor sitesTell Abu Shahrain, Tell al-Madain, Tell as-Senkereh, Tell Abu Habbah, Tell Fara, Tell Uheimir, Tell al-Muqayyar, Tell Bismaya, Tell HaririPreceded byJemdet Nasr PeriodFollowed byAkkadian Period, Early Assyrian Period Man carrying a box, pos...

Series of presidential nominating conventions 1860 Democratic National Convention1860 presidential electionNominees Douglas and Johnson (Official) Breckinridge and Lane (Southern)ConventionsDate(s)April 23–May 3, 1860 & June 18–23, 1860CityCharleston, South Carolina & Baltimore, MarylandVenueSouth Carolina Institute Hall, Front Street Theater & Maryland Institute (Southern)CandidatesPresidential nomineeStephen A. Douglas of Illinois (Official) John C. Breckinridge of Kentucky ...

 

This article has multiple issues. Please help improve it or discuss these issues on the talk page. (Learn how and when to remove these template messages) The topic of this article may not meet Wikipedia's notability guidelines for products and services. Please help to demonstrate the notability of the topic by citing reliable secondary sources that are independent of the topic and provide significant coverage of it beyond a mere trivial mention. If notability cannot be shown, the article is ...

 

Ираклеониты — ученики гностика Ираклеона (II век). Упоминаются как особая секта Епифанием и Августином; при крещении и миропомазании они соблюдали обряд помазания елеем и при этом произносили воззвания на арамейском языке, которые должны были освободить душу от власт�...

Maria SanfordSanford, in c.1910BornDecember 19, 1836Saybrook, Connecticut, USDiedApril 21, 1920Washington, D.C., USOccupationCollege professor Maria Louise Sanford (December 19, 1836 – April 21, 1920) was an American educator. She was a professor of history at Swarthmore College from 1871 to 1880 and a professor of rhetoric and elocution at the University of Minnesota from 1880 to 1909. Early life and education Maria Sanford was born in Saybrook, Connecticut. Her love for education began ea...

 

Seanad Éireann constituency Industrial and Commercial PanelSeanad Éireann constituencyCurrent constituencyCreated1938Seats9Senators  Catherine Ardagh (FF)  Frances Black (Ind)  Micheál Carrigy (FG)  Ollie Crowe (FF)  Aidan Davitt (FF)  Gerry Horkan (FF)  Sharon Keogan (Ind)  Mark Wall (Lab)  Barry Ward (FG) The Industrial and Commercial Panel (Irish: An Rolla Tionscail Agus Tráchtála) is one of five vocational panels which together elect 43 of...

 

American baseball player Baseball player Rocky GaleGale with the Portland Beavers in 2010CatcherBorn: (1988-02-22) February 22, 1988 (age 36)Portland, OregonBatted: RightThrew: RightMLB debutSeptember 6, 2015, for the San Diego PadresLast MLB appearanceMay 12, 2019, for the Los Angeles DodgersMLB statisticsBatting average.108Home runs1Runs batted in2 Teams San Diego Padres (2015, 2017) Los Angeles Dodgers (2018–2019) Rocky Michael Gale (born February 22, 1...

This article includes a list of references, related reading, or external links, but its sources remain unclear because it lacks inline citations. Please help improve this article by introducing more precise citations. (February 2013) (Learn how and when to remove this message) Torre dei ContiThe remaining lower portion of the Torre dei Conti.Click on the map for a fullscreen viewCoordinates41°53′37″N 12°29′17″E / 41.89361°N 12.48806°E / 41.89361; 12.48806 T...

 

Trade organization in Canada Music CanadaAbbreviationMCFormationApril 9, 1963; 61 years ago (1963-04-09)TypeLicensing and royalties, technical standardsHeadquartersToronto, Ontario, CanadaWebsitemusiccanada.com Music Canada is a non-profit trade organization that was founded 9 April 1963 in Toronto to represent the interests of companies that record, manufacture, produce, and distribute music in Canada. It also offers benefits to some of Canada's leading independent record l...