The contract to build Woodrow Wilson was awarded to Mare Island Naval Shipyard at Vallejo, California, on 9 February 1961 and her keel was laid down there on 13 September 1961. She was launched on 22 February 1963 sponsored by Miss Eleanor Axson Sayre (Wilson's granddaughter), and commissioned on 27 December 1963, with Commander Cleo N. Mitchell in command of the Blue Crew and Commander Walter N. Dietzen in command of the Gold Crew.
Operational history
Woodrow Wilson departed Mare Island Naval Shipyard on 9 January 1964, bound for the United States East Coast. After stopping briefly at San Diego, she proceeded on to the Panama Canal, arriving on 19 January 1964 at its western end. Violent anti-American demonstrations and riots over a recent flag-displaying incident had resulted in an extremely tense atmosphere. As a result, she transited the canal in a record seven hours ten minutes while combat-ready United States Marines and United States Army soldiers guarded the locks.
Making port at Charleston, South Carolina, on 5 February 1964, Woodrow Wilson conducted a shakedown cruise off the lower U.S. East Coast into March 1964 and underwent post-shakedown repairs and alterations into April 1964. She put to sea at the end of May 1964 upon the conclusion of these repairs and alterations and commenced her first deterrent patrol out of Charleston in June 1964.
In 1972, Woodrow Wilson shifted back to the Atlantic and another overhaul and conversion to the Poseidon C3 missile at Newport News Shipbuilding. She was then home-ported at Charleston for operations with the United States Atlantic Fleet.
On 4 June 1979, Woodrow Wilson ran aground in heavy fog at Race Rock while en route to New London, Connecticut. The submarine was able to free itself and proceed to port for inspection of the damage.
After several overhauls in the Charleston Naval Shipyard and 40 more deterrent patrols, Woodrow Wilson entered the Charleston Naval Shipyard for its final refueling overhaul in 1988. CDR Charles Peterson was relieved of both crews by CDR Glen Dilgren in August 1989. Hurricane Hugo struck on 21 September 1989 and resulted in a one-month shipyard shutdown. During the shutdown, crew members were assigned to help with recovery operations in the Charleston area, for which the ship was awarded the Humanitarian Service Medal. During Alfa sea trials in June 1990 and as a result of the Strategic Arms Reduction Treaty, Woodrow Wilson was directed to condense the crew, deactivate the missile systems and convert to an SSN. The ship was delivered for SSN Shakedown three months ahead of schedule.
During shakedown, the ship went 11-for-11 during AUTEC, WSAT and open ocean exercise torpedo firings against maneuvering targets.
The missile compartment was configured for support of Naval Special Warfare, and the ship passed its initial SSN Tactical Readiness Evaluation. Following shakedown, the ship was assigned to Submarine Squadron Four at Charleston, SC and won the White "A" for excellence in Anti-Submarine Warfare. Woodrow Wilson was assigned missions in Fleet and NATO Exercises, Atlantic SSN Operations and a primary tasking in the development of new submarine and Naval Special Warfare tactics. In September 1991, the ship was a key participant in Exercise Phantom Shadow, the largest ever Navy and Special Warfare exercise, which lasted a month in the Western Atlantic and Caribbean. In the spring of 1992, Woodrow Wilson conducted a successful MK 48 warshot SINKEX during her 30th underway since completion of overhaul two years before. CDR Glen Dilgren was relieved by CDR Marshall Page in April 1992. During her final years of service, the ship continued SSN operations in the Atlantic, Mediterranean, and Caribbean.
This article includes information collected from the Naval Vessel Register, which, as a U.S. government publication, is in the public domain. The entry can be found here.