The expressway is officially referred to as the Chūgoku-Ōdan Expressway Himeji Tottori Route. The Chūgoku-Ōdan Expressway Himeji Tottori Route is the official designation for the Sanyō Expressway between Sanyō Himeji-Nishi Interchange and Harima Junction, the Harima Expressway between Harima Junction and Yamazaki Junction, the Chūgoku Expressway between Yamazaki Junction and Sayō Junction, and the Tottori Expressway between Sayō Junction and Tottori Interchange (concurrent with the Chūgoku-Ōdan Expressway Himeji Tottori Route).
Route description
From Sayo Junction to Sayo Toll Gate the expressway is maintained and tolled by the West Nippon Expressway Company. The rest of the expressway is able to be driven without any fees. That section of the expressway is maintained by the Chūgoku branch of the Ministry of Land, Infrastructure, Transport and Tourism.
The entire expressway has only one lane in each direction, except for the section between Sayō Junction and Sayō Toll Gate.
History
The first section of the Tottori Expressway to open was the 2.5 kilometres (1.6 mi) Shidosaka Tunnel section between Sakane Junction in Nishiawakura and Chizu in 1981. The final section of the expressway (8.8 km between Ōhara Interchange and Nishi-Awakura Interchange) was opened on March 23, 2013.
List of interchanges and features
This article contains a bulleted list or table of intersections which should be presented in a properly formatted junction table. Please consult this guideline for information on how to create one. Please improve this article if you can.(November 2021)