RapidRide is a network of limited-stop bus routes with some bus rapid transit features in King County, Washington, operated by King County Metro. The network consists of eight routes totaling 76 miles (122 km) that carried riders on approximately 64,860 trips on an average weekday in 2016, comprising about 17 percent of King County Metro's total daily ridership.[1]
RapidRide lines are faster than typical local bus routes because they service fewer stops (on average, 40% fewer than the routes they replaced),[2] make extensive use of bus priority to preempt traffic lights, and on some lines, use special lanes to bypass traffic.[3] RapidRide lines run no less often than every 10 minutes during peak commuting hours and every 15 minutes on weekends and during most off-peak hours. Most lines (except the B, F and H lines) also have night owl (late night and early morning) service.[3]
History
The creation of the RapidRide network was one of the main elements of King County's "Transit Now" initiative that was proposed in April 2006 and approved by voters in November 2006.[4] Funding for the construction and operation of the lines came from a 0.1% sales tax increase included in Transit Now, contributions from local cities and over $80 million in grants from state and federal agencies.[5] One of the most notable local contributions was from Seattle, which funded traffic signal and roadway improvements with the city's "Bridging the Gap" property tax levy, passed at the same time as Transit Now in November 2006.
Transit Now called for a network of routes that included these bus rapid transit features:
High-frequency operation (defined as 10 minutes or less)
Faster, more reliable trip times through exclusive, HOV or Business Access and Transit (BAT) travel lanes, and/or priority at intersections through transit signal priority and queue jumps
Improved shelter waiting areas with real-time information at major stops
Low emission hybrid diesel-electric buses
Branded buses and facilities with a unique look and feel
These improvements were to be made on five key travel corridors identified in the initiative:[4]
Shoreline/Downtown Seattle via Aurora Avenue North
West Seattle/Downtown Seattle via West Seattle Bridge
Ballard/Seattle Center/south downtown stadium area via 15th Ave Northwest & West Mercer St with service or frequent connections to Ballard High School and the Ballard business district
Federal Way-Tukwila via Pacific Highway South
Bellevue-Redmond via Crossroads and Overlake
Planning and construction began shortly after approval of the measure. Along each of the corridors, fiber-optic cable was utilized to enable a Transit Signal Priority system (to synchronize traffic signals with buses), an automated vehicle location system and the features on "tech pylons" to be installed at certain locations.
Every stop along the line received some level of improvement, with the degree of investment determined by the ridership. All stops were enhanced with new concrete, RapidRide signage, and a new bus stop flag featuring route information, a solar-powered area light, and a stop request strobe light, to signal to drivers that a passenger is waiting. Additionally, moderately busy stops received new shelters, benches and trash cans. The busiest stops were improved into "stations" with large shelters and a "tech pylon" with an electronic real-time arrival sign, audible arrival information, a backlit route map, and an ORCA reader for off-board fare payment.
Shortly after the approval of Transit Now, Metro's revenues sales tax revenues saw a steep and prolonged decline. To combat the loss of income Metro underwent a series of efficiency measures, including restructuring routes to reduce operating costs. The RapidRide system was largely shielded from these cuts because federal and state grant funding helped pay for new buses and infrastructure.[5] Also, in many cases, Metro actively restructured its network to shift riders to the new faster, high-capacity RapidRide routes.
One year later on October 2, 2011, the B Line opened on the Eastside, connecting Redmond, Overlake, and Bellevue. The opening of the RapidRide corridor enabled a major restructure of most of the bus routes serving the Eastside. In addition to the B Line, three new routes were created, 11 routes received new a routing, and 13 routes were deleted.[8]
Next up were the RapidRide corridors in Seattle, but the nationwide economic downturn forced Metro to create a lower cost routing than was proposed in the Transit Now measure. The connection between Ballard and the south downtown stadium area was scrapped in favor of interlining the West Seattle and Ballard lines. Upon reaching downtown, northbound C Line buses would change signs to continue north as the D Line and southbound D Line buses would change signs to continue south as the C Line. For riders, that meant that instead of running to the south downtown stadium area, the Ballard line would only reach the midtown area of Downtown Seattle. The move allowed King County Metro to purchase fewer buses and save on operations expenses. This interline was finally broken in March 2016 after the passage of Proposition 1 in the City of Seattle, dedicating additional tax revenue to support the Metro system.
After several months of outreach by the Seattle Department of Transportation, it was decided that the C Line would serve the Alaska Junction (a major transfer point for buses), the Fauntleroy ferry terminal and Westwood Village. For the D Line, the decision was made to serve Ballard High School and the Crown Hill neighborhood and offer frequent connecting service to the Ballard business district via Route 44 on NW Market Street and the new Route 40 on Leary Ave NW. In the years since the change, both Route 40 and 44 have become so popular that they are now scheduled to be converted into RapidRide corridors.
RapidRide service from Downtown Seattle to Ballard and West Seattle began on September 29, 2012. The opening of the new lines (along with budget cuts forced by the economic downturn) prompted a substantial restructuring of Metro's system in Seattle. Five new routes were created, dozens were revised, and 15 were deleted (including several routes that dated back to the streetcar-era).[9]
The third line to open in Seattle, was the E Line along Aurora Avenue North. It replaced one of the busiest and most infamous routes in Metro's system, the 358 Express.[10][11][12] While the implementation of the E Line did not trigger another major restructuring of routes, it did require a major improvement project along Aurora Avenue. As part of the project, the cities of Seattle and Shoreline implemented BAT (Business Access and Transit) lanes along most of the corridor, reserving the outside lanes for buses and right-turning vehicles. The cities also made major improvements to pedestrian facilities along the corridor.[13][14] The E Line opened on February 15, 2014 after several months of delays.[15]
In late 2009, the construction of a sixth line was added to the system that would run between Burien and Renton in South King County. The King County Executive had initially dropped the line from the Transit Now initiative, but higher than expected tax revenue and lower than expected costs from the five initial lines, allowed the line to be funded. The F Line connects several major South King County transportation hubs including the Burien Transit Center, the Tukwila International Boulevard Link station (also served by the A Line), the transit center at Southcenter Mall, the Tukwila Sounder station, and the Renton Transit Center. The F Line was initially slated to replace Route 140, but an extension to the Boeing Renton Factory and the Renton Landing also allowed Metro to eliminate Route 110. The F Line began operation on June 7, 2014, after several months of delays.[3]
In June 2015, midday frequencies were improved on the RapidRide C, D, and E Lines, bringing up Monday-Saturday daytime frequency from every 15 minutes to every 10–12 minutes to accommodate increased ridership. Following those changes, in March 2016, the RapidRide C and D Line were disconnected from one another. The D Line was extended to its original planned terminus in Pioneer Square, connecting riders better to South Downtown employment sites and visitors attractions. The C Line was extended into the vastly growing Denny Triangle and South Lake Union areas using new transit priority lanes on Westlake Avenue. The H Line began operation on March 18, 2023, replacing Route 120.
In the late 2010s, plans were made to construct and open 13 new RapidRide corridors by 2025.[18][19] The city of Seattle plans to pay for seven of the routes located primarily within its borders, while King County will locate the funding for the six routes in suburban areas outside of Seattle. The improvements are expected to be funded by federal and state grants. Additionally, the improvements in the city of Seattle will be partially funded by the "Move Seattle" property tax levy passed in November 2015.[20][21][22] The network will create a grid of frequent bus lines connecting the major population centers in King County. In many cases, the opening of the routes is timed to coincide with the expansion of Sound Transit's Link light rail system.
On September 23, 2020, King County Metro announced delays to the I, J, K, and R lines. Work on the I and J lines will proceed while the R and K lines have been put on hold.[23]
The table below details the routing, project status, and expected opening of each RapidRide line expected to open before 2025.[24]
King County also plans to add a further seven RapidRide routes between 2025 and 2040.
Loyal Heights – Greenwood – Greenlake – U District via N 85th St
45
(none)
Planned
TBD
Shoreline CC – Bitter Lake – Greenwood – Phinney – Fremont – Downtown Seattle via Greenwood Ave N
5
Stations and stops
Stops are farther apart than typical Metro service in order to increase speed and reliability,[3] and create "stations"[3] that are akin to what is found on light rail lines. The stations look different from normal bus stops and have "tech pylons" that feature ORCA card readers for off-board fare payment, real time information signs[3][28] and automated voice announcements to communicate estimated arrival times of RapidRide buses. To increase security, stations are lit[28] and are patrolled by transit police. Because of the frequent headways, riders do not have to wait as long at stations as they do at normal bus stops.
Equipment
RapidRide uses low-floor, diesel-electric hybridarticulated buses that are equipped three doors and painted with an identifiable look (a red and yellow livery) distinct from the buses used on other Metro routes.[3]
RapidRide uses a proof-of-payment system: passengers who have a valid transfer or who tap their ORCA Card at an off-board validator (located at most "station" stops) can board any of the three doors on the bus; those who do not must board through the front door, pay their fare, and get a transfer, which serves as proof-of-payment.[29] Fares are enforced through random spot checks by contracted fare inspectors who are assisted by Metro's transit police.[2] Coaches feature racks for 3 bikes, Wi-Fi,[28] and security cameras.[2] RapidRide buses have fewer seats than similar articulated buses in Metro's fleet, allowing for more room for standing riders, which increases the total number of passengers the bus can carry.
Coaches were the first to feature on-board automated announcements and signage that inform riders of the next available stop as the vehicle approaches. Metro has since deployed the same technology to all buses in the fleet.[28]
In 2010, New Flyer discontinued the "Advanced BRT" styling (DE60LFA) that was purchased for the coaches running the A Line. Later coaches were ordered with New Flyer's "Restyled" package (DE60LFR) and include one passive restraint for wheelchair users.[30]
In 2023, buses on the A and E lines were equipped with monitoring pumps to detect fumes from narcotics, including fentanyl, to study its effects onboard buses.[31]
^"Chapter 3: Corridors"(PDF). Transit Master Plan: Final Summary Report (Report). Seattle Department of Transportation. February 1, 2016. pp. 3–25. Retrieved April 13, 2016.
Artikel ini perlu diwikifikasi agar memenuhi standar kualitas Wikipedia. Anda dapat memberikan bantuan berupa penambahan pranala dalam, atau dengan merapikan tata letak dari artikel ini. Untuk keterangan lebih lanjut, klik [tampil] di bagian kanan. Mengganti markah HTML dengan markah wiki bila dimungkinkan. Tambahkan pranala wiki. Bila dirasa perlu, buatlah pautan ke artikel wiki lainnya dengan cara menambahkan [[ dan ]] pada kata yang bersangkutan (lihat WP:LINK untuk keterangan lebih lanjut...
Artikel ini bukan mengenai Pemimpin Partai Konservatif (Britania Raya). Ketua Partai KonservatifChairman of theConservative PartyLogo Partai KonservatifPetahanaGreg Handssejak 7 Februari 2023Ditunjuk olehPemimpin Partai KonservatifMasa jabatanSesuai kehendak Pemimpin Partai KonservatifPejabat perdanaArthur Steel-MaitlandDibentuk1911WakilSara Britcliffe (Pemuda) Saqib Bhatti (Bisnis) Alexander Stafford (Kebijakan) Ketua Partai Konservatif (Inggris: Chairman of the Conservative Partycode: ...
Wild ChildPoster resmiSutradaraNick MooreProduser Tim Bevan Eric Fellner Diana Phillips Ditulis olehLucy DahlPemeran Emma Roberts Alex Pettyfer Georgia King Natasha Richardson Penata musikMichael PriceSinematograferChris SeagerPenyuntingSimon CozensPerusahaanproduksi StudioCanal Relativity Media Working Title Films DistributorUniversal PicturesTanggal rilis 15 Agustus 2008 (2008-08-15) (Inggris) Durasi97 menitNegara Inggris Amerika Serikat Prancis BahasaInggrisAnggaran$20 jutaP...
Monumen Patung Dirgantara atau lebih dikenal dengan nama Patung Pancoran adalah salah satu monumen patung yang terdapat di Jakarta. Letak monumen ini berada di kawasan Pancoran, Jakarta Selatan.[1] Tepat di depan kompleks perkantoran Wisma Aldiron Dirgantara yang dulunya merupakan Markas Besar TNI Angkatan Udara. Posisinya yang strategis karena merupakan pintu gerbang menuju Jakarta bagi para pendatang yang baru saja mendarat di Bandar Udara Halim Perdanakusuma. Ide pertama pembuatan ...
Eliaquim Mangala Mangala bermain untuk Porto pada 2013Informasi pribadiNama lengkap Eliaquim Hans MangalaTanggal lahir 13 Februari 1991 (umur 33)Tempat lahir Colombes, PrancisTinggi 1,88 m (6 ft 2 in)[1]Posisi bermain BekInformasi klubKlub saat ini Valencia(pinjaman dari Manchester City)Nomor 5Karier junior1996–2002 AC Lustin2002–2004 CS Wépionnais2004–2008 NamurKarier senior*Tahun Tim Tampil (Gol)2008–2011 Standard Liège 77 (2)2011–2014 Porto 51 (6)20...
Species of fungus Lingzhi Scientific classification Domain: Eukaryota Kingdom: Fungi Division: Basidiomycota Class: Agaricomycetes Order: Polyporales Family: Ganodermataceae Genus: Ganoderma Species: G. sichuanense Binomial name Ganoderma sichuanenseJ.D. Zhao & X.Q. Zhang (1983)[1] Synonyms[2][3] Ganoderma lingzhi Sheng H. Wu, Y. Cao & Y.C. Dai (2012) Species of fungus LingzhiMycological characteristicsPores on hymenium Cap is offset or indistinctHymenium ...
МифологияРитуально-мифологическийкомплекс Система ценностей Сакральное Миф Мономиф Теория основного мифа Ритуал Обряд Праздник Жречество Мифологическое сознание Магическое мышление Низшая мифология Модель мира Цикличность Сотворение мира Мировое яйцо Мифическое �...
Artikel atau sebagian dari artikel ini mungkin diterjemahkan dari Peter Gallagher di en.wikipedia.org. Isinya masih belum akurat, karena bagian yang diterjemahkan masih perlu diperhalus dan disempurnakan. Jika Anda menguasai bahasa aslinya, harap pertimbangkan untuk menelusuri referensinya dan menyempurnakan terjemahan ini. Anda juga dapat ikut bergotong royong pada ProyekWiki Perbaikan Terjemahan. (Pesan ini dapat dihapus jika terjemahan dirasa sudah cukup tepat. Lihat pula: panduan penerjem...
The following is a list of characters in the Chinese classical 16th century novel Journey to the West, including those mentioned by name only. Main characters Sun Wukong (Monkey King, 孙悟空) Main article: Sun Wukong Tang Sanzang (Tripitaka, 唐三藏) Main article: Tang Sanzang Zhu Bajie (Pigsy, 豬八戒) Main article: Zhu Bajie Sha Wujing (Sandy, 沙悟淨) Main article: Sha Wujing The White Dragon Horse (白龍馬) Main article: White Dragon Horse Buddhist pantheon The Tathāgata Budd...
Canadian provincial legislature contest 2018 Quebec general election ← 2014 October 1, 2018 (2018-10-01) 2022 → ← outgoing memberselected members →125 seats in the National Assembly of Quebec63 seats needed for a majorityOpinion pollsTurnout66.45% ( 4.98%)[1] Majority party Minority party Leader François Legault Philippe Couillard Party Coalition Avenir Québec Liberal Leader since November 4, 2011 Mar...
Олександрівська сільська рада Основні дані Країна Україна Область Чернігівська область Район Семенівський район Адм. центр с. Олександрівка Утворена у 1918 році Код КОАТУУ 7424780500 Облікова картка Олександрівська сільська рада Склад Кількість членів 12 депутатів Гол...
Type of school providing advanced secondary education in Europe This article is about the European secondary education program. For the variant in Germany, see Gymnasium (Germany). For the variant in Denmark, see Gymnasium (Denmark). Gymnasium Theodorianum in Paderborn, Germany, one of the oldest schools in the world Stiftsgymnasium Melk, the oldest continuously operating school in Austria Gymnasium (and variations of the word; pl. gymnasia[1]) is a term in various European langu...
تشيبمان الإحداثيات 46°10′40″N 65°52′39″W / 46.177777777778°N 65.8775°W / 46.177777777778; -65.8775 تاريخ التأسيس 1966 تقسيم إداري البلد كندا[1] تاريخ الإلغاء 1 يناير 2023 معلومات أخرى رمز جيونيمز 5921527 الموقع الرسمي الموقع الرسمي تعديل مصدري - تعديل تشيبمان (بالإ�...
Nigerian professional wrestler (born 1994) This article is about the professional wrestler. For other uses, see Omo. OmosOmos in 2023Birth nameTolulope OmogbehinBorn (1994-05-16) May 16, 1994 (age 30)Lagos, Nigeria[1]Spouse(s) Cheyenne Quailey (m. 2023)Professional wrestling careerRing name(s)Jordan Omogbehin Omos[2]Billed height7 ft 3 in (221 cm)[2]Billed weight416 lb (189 kg)[2]Trained byWWE Perform...
أسطول غواصات يو الثالث والثلاثون الدولة ألمانيا النازية الإنشاء 21 سبتمبر 1944[1][2] الانحلال 8 مايو 1945[2] جزء من كريغسمارينه الاشتباكات الحرب العالمية الثانية تعديل مصدري - تعديل أسطول الغواصات الثالث والثلاثون (33. Unterseebootsflottille ) كانت وحدة خط الم...
Historic university in Paris, France (1150–1970) University of ParisFrench: Université de ParisCoat of arms Latin: Universitas magistrorum et scholarium Parisiensis[1]MottoHic et ubique terrarum (Latin)Motto in EnglishHere and anywhere on EarthTypeCorporative, then public universityEstablishedOrigin: High Middle Ages at the Parisian cathedral school Founded: 1045–1150Suppressed: 1793Faculties reestablished: 1806University reestablished: 1896Divided: 1970LocationParis, France...
Ташкент. Вид крепости, построенной генералом Черняевым. Фрагмент карты Ташкента 1910 года с подробным планом крепости. Ташкент. Вид крепостных ворот.Ташкент. Вход колонны солдат в крепость через крепостные ворота.1918 год. Командиры Ташкентской крепости. Среди прочих: �...
Musical note with a rhythmic value, but no discernible pitch For other uses, see Ghost note (disambiguation). Illustration of dead note in musical notation and guitar tablature In music, notably in jazz,[1] a ghost note (or a dead, muted, silenced or false note) is a musical note with a rhythmic value, but no discernible pitch when played. In musical notation, this is represented by an X for a note head instead of an oval, or parentheses around the note head.[2] It should not ...
Questa voce sull'argomento stagioni delle società calcistiche italiane è solo un abbozzo. Contribuisci a migliorarla secondo le convenzioni di Wikipedia. Segui i suggerimenti del progetto di riferimento. Voce principale: Valenzana Mado Società Sportiva Dilettantistica. Valenzana CalcioStagione 2004-2005Sport calcio Squadra Valenzana Allenatore Alberto Bollini poi Giovanni Pagliari Presidente Alberto Omodeo Serie C23º posto nel girone A. Maggiori presenzeCampionato: Grillo (33) ...