This station did not open at the same time as the rest of the Harbourfront line it served, due to disputes regarding direct access to nearby businesses that eventually fell through.[2] Additionally, after the station did open, the "FERRY DOCKS" subtitle was not yet present.[3]
Design
Queens Quay is a unique station in Toronto because it is served by streetcars rather than subways. It is the only station to have a pedestrian crossing between platforms at track level, as there is no electrified third rail to contend with. Streetcars crossing the pedestrian walkway must stop and sound their gong before proceeding; Union-bound streetcars stop immediately after rounding a sharp curve, ring their gong, and proceed into the stopping zone to load and unload passengers. Exhibition- and Spadina-bound streetcars enter the station, load and unload passengers, ring their gong, then proceed out of the station.
Originally there was to have been an underground station in front of the Westin Harbour Castle Hotel and the Jack Layton Ferry Terminal. Patrons of the hotel were to have had underground access to the station. Plans for the station were cancelled when the hotel changed its mind about sharing in the station's cost. This meant that the fallback location on Bay would require ferry passengers to cross a busy street on foot.[4]
Queens Quay is also the only station in Toronto that does not have permanent staff or faregates, as the streetcar platform is not a fare-paid zone. Passengers pay their fare upon boarding streetcars.
The station was closed from July 2012 to October 2014 due to Waterfront Toronto's project to rebuild Queens Quay West and reconstruction of the Harbourfront streetcar line, during which time there was a replacement bus service.[5] As of the station's reopening on October 12, 2014 a proof-of-payment ticket vending machine is present on the northbound platform.
Streetcar infrastructure in the vicinity
North of this station, the lines enter an underground loop at Union subway station, below Union Station, the city's main railway station; to the south, they emerge from the tunnel onto Queens Quay, where they run west in a dedicated right-of-way as far as Spadina Avenue, where the two routes diverge; the 509 continues west to Exhibition Place, while the 510 turns north towards Spadina station.
Tunnel intrusions
Between 2014 and 2018, 26 motorists inadvertently drove through the Queens Quay tunnel portal via the streetcar ramp on Queens Quay West between York and Bay streets and became trapped in the tunnel.[6] It took the TTC anywhere from 15 minutes to 5 hours to extract trapped vehicles. In 2016, one automobile reached Union station despite the tunnel having no provision for rubber-tire vehicles, with streetcar tracks protruding from a shallow trench. In April 2017, to prevent motorist invasions, the TTC made changes at the tunnel entrance by lowering warning lights closer to driver eye level, by placing a flashing light on a pole between the tracks, by adding rumble strips and by adding signs on posts that also narrow the passage to the tunnel.[7] However, despite these efforts, another motorist drove down the ramp on October 18, 2017, and became trapped in the trench at the bottom.[8] The 24th incident of automobile intrusion occurred on March 17, 2018, spurring the TTC to take further precautions.[9] On April 22, 2018, the TTC added 6 new bollards at the east side of the intersection of Queens Quay West and York Street to obstruct drivers from driving onto the right-of-way and into the tunnel.[10] Further, in late July 2018, the TTC installed two gates at the top of the ramp to the tunnel which can be opened in 3 seconds by a transponder on an approaching streetcar.[11]
On January 22, 2020, a 27th motorist bypassed all the barriers at the tunnel entrance and travelled all the way to Union station before becoming stuck. The intruding SUV passed through the bollards and went past the lights and gates installed in 2018.[12] On December 11, 2023, another motorist tailed a streetcar before the gates were lowered, also getting stuck in the tunnel.[13]
Future expansion
An expansion of Queens Quay station is planned as part of the East Bayfront LRT project, which plans to bring streetcar service in a dedicated right-of-way along Queens Quay East to serve the developing districts of the Portlands, West Don Lands, and East Bayfront. A new entrance and exit on the south side of Queens Quay is planned, along with improvements to the existing entrance. Additionally, a tunnel under the streetcar tracks for passengers to move between the two platforms, replacing the current level crossing, is also planned.[14]
^
Peter Howell (March 12, 1990). "TTC fighting on two fronts Province, Toronto give it rough ride". Toronto Star. p. A.15. Archived from the original on January 31, 2013. Retrieved March 13, 2012. The constant bickering between the TTC and Toronto over serving the ferry dock led to the recent decision by the owners of the Harbour Castle Westin to withdraw their $2.5 million share of the $4 million cost. The TTC now plans to build a smaller stop on the north side of Queens Quay, which means thousands of people will have to cross the busy street to take the ferries.