Humber Gas Tunnel

Humber Gas Tunnel
Overview
LocationLincolnshire
East Riding of Yorkshire
Coordinates53°42′04″N 0°14′31″W / 53.701°N 0.242°W / 53.701; -0.242
StatusOpen
CrossesHumber Estuary
StartPaull (northern end)[note 1]
EndGoxhill (southern end)
Operation
Work begun6 April 2018 (2018-04-06)
Constructed6 April 2018–10 September 2019
OpenedDecember 2020
OwnerNational Grid
OperatorNational Grid
TrafficNatural gas
Technical
Design engineerSkanska
A Hak
Porr
Length4.9 kilometres (3 mi)
Depth of tunnel below water level30 metres (98 ft)

The Humber Gas Tunnel is a natural gas-carrying pipeline that runs underneath the Humber Estuary between Paull in the East Riding of Yorkshire, and Goxhill in Lincolnshire, England. The project was started in April 2018, and the pipeline was used to transport gas for the first time in December 2020. It is designed to carry 20% of the gas used in the United Kingdom, and is a crucial feeder pipeline to carry gas to the south of England. It is the longest pipe in a tunnel in Europe, and due to being inserted into the tunnel that was deliberately flooded with water, it is the longest hydraulically inserted gas pipeline in the world.

History

In 2009, underwater surveys revealed that the pipeline carrying natural gas between Easington and the south side of the Humber Estuary was at risk of being damaged. The Humber Estuary is the fourth-largest estuary in Great Britain, and the third busiest in terms of shipping.[1] The former pipeline, which was constructed in 1984, was trench-laid on the floor of the estuary, and whilst it was still safe, it was listed on National Grid's "Vulnerable Infrastructure Register", as it was prone to tidal erosion and "third-party impact, both of which could result in catastrophic failure of the pipeline."[2][3][1] Although remedial work was undertaken in 2010 and 2012, because the pipeline feeds up to 20% of gas into the National Transmission System (NTS), a replacement project was devised to enable security of supply.[4] The River Humber Gas Pipeline Replacement Order 2016, was approved in 2016, which gave authority for the National Grid to build a replacement pipe and all ancillary works.[5]

The new pipeline would be buried underneath the river in a specially constructed tunnel, and would run parallel to the old pipeline from Paull in the north east to Goxhill in the south west.[6] This would then connect to the existing pipeline to Hatton compressor station in Lincolnshire, which in turn supplies gas to the south of England.[7] A 160-metre (520 ft) tunnel boring machine (TBM), christened Mary,[note 2] started running north eastwards from Goxhill in Lincolnshire in April 2018. The TBM reached Paull in the East Riding of Yorkshire, 18 months later.[9] The TBM had a diameter of 4.38 metres (14.4 ft), which allowed for the concrete casing to be inserted on the walls of the new tunnel which consisted of rhomboidal and trapezoidal precast concrete segments 225 millimetres (8.9 in) thick, and 1.2 metres (3 ft 11 in) in length.[10] The chalk slurry dug from the chalk beds underneath the Humber was treated and used to remediate a former chalk quarry at Goxhill.[11] The material excavated as part of the tunnelling process was mostly chalk, having dug through the Burnham Chalk and Flamborough Chalk Formations, but with glacial deposits at the north bank near Paull. The pipe is horizontal below the estuary, but the down gradients at each portal are at an incline of 4% for 450 metres (1,480 ft) at Paull, and 650 metres (2,130 ft) at Goxhill.[12]

The pipe was then fitted out and flushed with 50×103 cubic metres (1.8×106 cu ft) of pure water to make it ready to receive the new pipeline.[13] On 23 June 2020, the first section was pushed into the tunnel and this continued until 9 July 2020.[14] The pipes were delivered in shorter sections, and then welded out of the tunnel into 600-metre (2,000 ft)+ sections.[10] Two hydraulic thrust machines inserted the pipes at a rate of 1 metre per second (3.3 ft/s) into the tunnel, so that the pipe moved into the tunnel, suspended in the water.[10][15] Rollers were used to move the pipes into the tunnel, and each section end was welded to the start of the new 620-metre (2,030 ft) pipe section.[1] The pipe has been designed to last 40 years, whilst the tunnel has been lifed at 120 years.[16] All works above ground will be returned to agricultural use, and aside from the Above Ground Installations (AGIs) at Paull and Goxhill, no evidence of the pipeline or tunnel will be visible on the surface.[17]

The pipeline was commissioned and gas started flowing through for the first time in December 2020.[18] It is designed to carry up to 20% of the United Kingdom's gas supply, during peak winter demand.[1] The pipe is the longest pipeline in a tunnel in Europe and is also the longest hydraulically inserted gas pipeline in the world, for which it was awarded a Guinness World Record in November 2020.[18][19][20] The project was costed at around the £100 million mark in 2016, but on opening, full works, remediation and the installation of the AGIs (above ground installations), meant the cost was £150 million.[18] Initially, Ofgem refused National Grid the authority to pass the cost of the project onto consumers, with Ofgem citing that there was no need to carry out the work, "despite National Grid’s claim that the 3km-long pipeline was at risk of catastrophic failure." By this point in August 2018, National Grid had already spent £90 million on the then estimated £140 million project. Ofgem responded by saying that "National Grid has not demonstrated that the benefits of replacing the pipe outweigh the costs".[21] However, in September 2018, Ofgem changed their view and allowed the National Grid to charge £111 million of the cost to consumers. Initially, National Grid had asked for £140 million, but Ofgem argued that "...the project could have been delivered more efficiently."[22]

Details of pipeline and tunnel

  • Length (of tunnel) – 4,860 metres (15,940 ft)
  • Diameter of TBM – 4.38 metres (14.4 ft)
  • Diameter of concrete tunnel – 3.65 metres (12 ft)
  • Average depth – 30 metres (98 ft)[23]
  • Length of pipes (x 8) – 620 metres (2,030 ft)
  • Diameter of pipes – 1.05 metres (3 ft 5 in)[8]
  • Weight of individual pipe sections – 850 tonnes (940 tons)[14]
  • Gas delivery capacity of pipeline – 70×106–100×106 cubic metres (2.5×109–3.5×109 cu ft) per day.[note 3]

See also

Notes

  1. ^ Start and end defined by direction in which the gas flows.
  2. ^ The TBM is named after Mary Fergusson, the first female president of the Institution of Civil Engineers (ICE).[8]
  3. ^ This represents 20% of the UK peak winter demand for gas.

References

  1. ^ a b c d Casci, Mark (14 July 2020). "Work to complete the world's largest hydraulically inserted gas pipe completes under Humber Estuary". The Yorkshire Post. Retrieved 15 December 2020.
  2. ^ Chambers 2018, p. 1.
  3. ^ HGPRP 2018, p. 6.
  4. ^ HGPRP 2018, pp. 3–4.
  5. ^ "The River Humber Gas Pipeline Replacement Order 2016". legislation.gov.uk. Retrieved 15 December 2020.
  6. ^ HGPRP 2018, p. 3.
  7. ^ HGPRP 2018, p. 7.
  8. ^ a b "Drilling work starts on £100m River Humber gas tunnel". BBC News. 9 April 2018. Retrieved 15 December 2020.
  9. ^ Winter, Phil (12 September 2019). "There is now a 5km tunnel running under the River Humber". Hull Live. Retrieved 15 December 2020.
  10. ^ a b c Assenmacher 2018, p. 1.
  11. ^ "Humber estuary gas tunnel drilling work finishes". BBC News. 13 September 2019. Retrieved 15 December 2020.
  12. ^ Assenmacher 2018, p. 2.
  13. ^ Laister, David (14 July 2020). "Record-breaking under Humber gas pipeline installation completes". Business Live. Retrieved 15 December 2020.
  14. ^ a b Morby, Aaron (16 July 2020). "World record engineering feat for Humber gas pipeline – video". Construction Enquirer News. Retrieved 15 December 2020.
  15. ^ Hancock, Michaila (16 July 2020). "Record breaking pipeline insertion for River Humber gas project". New Civil Engineer. Retrieved 15 December 2020.
  16. ^ Waller, Jamie (9 November 2020). "5km long gas pipeline beneath the River Humber enters record books". Grimsby Live. Retrieved 15 December 2020.
  17. ^ Jukes, S (2020). "The Feeder 9, River Humber Replacement Pipeline Project, United Kingdom". Tunnels and underground cities : engineering and innovation meet archaeology, architecture and art. Volume 7, Long and deep tunnels. London: Taylor & Francis. p. 3,893. ISBN 978-0-367-46872-9.
  18. ^ a b c Mitchinson, James, ed. (15 December 2020). "Gas pipe under the Humber is a record breaker". The Yorkshire Post. p. 10. ISSN 0963-1496.
  19. ^ HGPRP 2018, p. 4.
  20. ^ "[9 November] River Humber gas pipeline – officially world record breaking". The National Grid. 9 November 2020. Retrieved 15 December 2020.
  21. ^ Gosden, Emily (9 August 2018). "Humber pipe 'catastrophe' warning falls on deaf ears". The Times. No. 72,623. p. 36. ISSN 0140-0460.
  22. ^ "A £111m cost to consumers of new Humber gas pipeline". The Yorkshire Post. 28 September 2018. Retrieved 15 December 2020.
  23. ^ Vaisanen, Ida (25 January 2020). "Key gas pipeline tunnel has been completed in Humber". The Icon. Retrieved 15 December 2020.

Sources

Read other articles:

Айван, єдиний і неповторнийThe One and Only Ivan Жанр фентезійна драмаРежисер Теа ШеррокПродюсер Анджеліна ДжоліЕллісон ШермурБрігем ТейлорСценарист Майк ВайтНа основі «Айван, єдиний і неповторний» Кетрін ЕпплгейтУ головних ролях Браян КренстонРамон РодрігесАріана Грінблат�...

Trabajo colaborativo: producción de conocimiento y solución de problemas El aprendizaje y el trabajo cooperativo es un enfoque que trata de organizar las actividades dentro del aula para convertirlas en una experiencia social y académica de aprendizaje para fortalecer en los estudiantes el trabajo en grupo para realizar las tareas de manera colectiva.[1]​ El aprendizaje, en este enfoque, depende del intercambio de información entre los estudiantes, quienes se motivan tanto para logr...

This article has multiple issues. Please help improve it or discuss these issues on the talk page. (Learn how and when to remove these template messages) This article does not cite any sources. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: This Is Hell Dimension Zero album – news · newspapers · books · scholar · JSTOR (March 2015) (Learn how and when to remo...

يوسف إستس   معلومات شخصية اسم الولادة جوزيف إدوارد إستس الميلاد 1 يناير 1944 (العمر 79 سنة)أوهايو،  الولايات المتحدة الجنسية أمريكي الديانة الإسلام الحياة العملية المهنة داعية إسلامي سبب الشهرة الدعوة إلى الإسلام المواقع الموقع http://yusufestes.com تعديل مصدري - تعديل   يوسف إست

Human settlement in EnglandWeston by WellandChurch of St Mary the Virgin at Weston by Welland photographed in September 2006Weston by WellandLocation within NorthamptonshirePopulation246 (2011)OS grid referenceSP7791Unitary authorityNorth NorthamptonshireCeremonial countyNorthamptonshireRegionEast MidlandsCountryEnglandSovereign stateUnited KingdomPost townMarket HarboroughPostcode districtLE16Dialling code01858PoliceNorthamptonshireFireNorthamptonshire...

此條目需要擴充。 (2015年11月7日)请協助改善这篇條目,更進一步的信息可能會在討論頁或扩充请求中找到。请在擴充條目後將此模板移除。 金海國際機場김해국제공항Gimhae International AirportIATA:PUSICAO:RKPK概览机场类型軍民合用所有者 大韓民國陸軍營運者 大韓民國陸軍  美國空軍韓國機場公社(朝鲜语:한국공항공사)服務城市釜山廣域市地理位置 韩国釜山廣域市�...

Pour les articles homonymes, voir Jorge Aravena et Aravena. Cet article est une ébauche concernant un footballeur chilien. Vous pouvez partager vos connaissances en l’améliorant (comment ?) selon les recommandations des projets correspondants. Jorge Aravena Biographie Nom Jorge Orlando Aravena Plaza Nationalité Chilien Naissance 22 avril 1958 (65 ans) Santiago Taille 1,77 m (5′ 10″) Poste Attaquant Parcours senior1 SaisonsClubsM (B.)1978-1985 CD Universidad C...

2019 Russian filmSerf Son of a RichTheatrical release posterDirected byKlim ShipenkoWritten by Daria Gracevich Anton Morozenko Dmitry Permyakov Produced by Eduard Iloyan (ru) Taimuraz Badziev Vyacheslav Dusmukhametov Vitaly Shlyappo (ru) Denis Zhalinsky (ru) Alexey Trotsyuk (ru) Aleksandr Kushaev Starring Miloš Biković Aleksandra Bortich Aleksandr Samoylenko Ivan Okhlobystin Mariya Mironova Oleg Komarov Olga Dibtseva Kirill Nagiyev CinematographyYuri NikogosovEdited byTim PavelkoMusic by Iv...

Farid Elias Nazhaܦܪܝܕ ܐܠܝܐܣ ܢܙܗܝBorn(1894-01-10)10 January 1894Hama, Ottoman EmpireDied19 October 1970(1970-10-19) (aged 76)Madrid, SpainOccupationJournalistMovementAssyrian nationalism Farid Elias Nazha (Syriac: ܦܪܝܕ ܐܠܝܐܣ ܢܙܗܝ,[1] pronounced [fɑriːd nɑzhe]; 10 January 1894 in Hama, Syria – 19 October 1970)[2] was an Assyrian Nationalist and a journalist. He was known for his criticism of Syriac Christian Clergy, which led to his ex...

This article has multiple issues. Please help improve it or discuss these issues on the talk page. (Learn how and when to remove these template messages) This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: National Assembly Haiti – news · newspapers · books · scholar · JSTOR (August 2010) (Learn how and whe...

Anti-democratic, reactionary philosophy founded by Curtis Yarvin in 2007 Not to be confused with Counter-Enlightenment or Intellectual dark web. This article is part of a series onConservatismin the United States Schools Compassionate Fiscal Fusion Libertarian Moderate Movement Neo Paleo Progressive Social Traditionalist Principles American exceptionalism Anti-communism Christian nationalism Classical liberalism Constitutionalism Family values Judeo-Christian values Limited government Militar...

У Вікіпедії є статті про інших людей з таким прізвищем: див. Кононов. Кононов Георгій Олександрович Народження 3 (15) квітня 1896Старикове, Глухівський районСмерть 22 травня 1975(1975-05-22) (79 років)  Львів, Українська РСР, СРСРКраїна  Російська імперія УНР СРСРЖанр пейзаж&...

For the American professor of history and international affairs, see Cyril Edwin Black. British politician Cyril Wilson BlackBlack in 1969Member of Parliament for WimbledonIn office23 February 1950 – 29 May 1970Preceded byArthur PalmerSucceeded byMichael Havers Personal detailsBorn(1902-04-08)8 April 1902Died29 October 1991(1991-10-29) (aged 89)Political partyConservativeAlma materKing's College School A road in Wimbledon has been named after Sir Cyril Black Sir Cyril Wilson B...

1-й сезон Формулы E ◄   нет    Сезон 2014/15    2015/16   ►   Чемпион Формулы E Нельсон Пике (мл.) (China Racing[en]) / (NEXTEV TCR[en]) Командный зачёт e.dams Renault Портал:АвтоспортПроект:Автоспорт Сезон 2014/15 Формулы Е стал первым сезоном новой гоночной серии Формула Е[1]. Он нач�...

Layout of the Eastern Creek Raceway The 2010 Eastern Creek 8 Hour Production Car Race was an endurance motor race for production cars.[1] It was staged on 12 December 2010 at the Eastern Creek International Raceway[2] in New South Wales, Australia. Jim Hunter, Barton Mawer and Gavin Bullas won the race at the wheel of a Subaru Impreza WRX STI; completing 249 laps, one more than the second place team of Barry Morcom, Nathan Morcom and Garry Holt, driving a BMW 335i. Third place...

2016 single by Deadmau5 featuring GrabbitzLet GoSingle by Deadmau5 featuring Grabbitzfrom the album W:/2016Album/ ReleasedNovember 18, 2016GenreProgressive houseLength6:18 11:32 (extended edit)LabelMau5trapSongwriter(s)Joel Zimmerman, Nicholas ChiariProducer(s)Deadmau5Deadmau5 singles chronology Saved (2016) Let Go (2016) Legendary (2017) Grabbitz singles chronology Follow Me(2016) Let Go(2016) In the Winter(2017) Music videoLet Go on YouTube Let Go is a song by Canadian electronic mu...

Comarca in Catalonia, SpainAlt PenedèsComarcaThe Foix ReservoirCountry SpainAutonomous community CataloniaRegionPenedèsProvinceBarcelonaCapitalVilafranca del PenedèsMunicipalities List Avinyonet del Penedès, Les Cabanyes, Castellet i la Gornal, Castellví de la Marca, Font-rubí, Gelida, La Granada, Mediona, Olèrdola, Olesa de Bonesvalls, Pacs del Penedès, El Pla del Penedès, Pontons, Puigdàlber, Sant Cugat Sesgarrigues, Sant Llorenç d'Hortons, Sant Martí Sarroca, Sant Per...

Indian film production house Creative CommercialsTypeFilm and Television ProductionIndustryEntertainmentFounded1973[1]HeadquartersJubilee Hills, Hyderabad, IndiaKey peopleK. S. Rama RaoProductsFilmsOwnerK. S. Rama Rao Creative Commercials is an Indian film production company established by K. S. Rama Rao.[2] History The company was started by K. S. Rama Rao in 1973 as a radio publicity company with the help of his friends Vadde Ramesh (producer), Rangachari (Lakshmi Films) and...

Local list of historic sites in Columbus, Ohio The Columbus Register of Historic Properties is a register for historic buildings and other sites in Columbus, Ohio, United States. The register is maintained by the City of Columbus Historic Resources Commission and Historic Preservation Office, and was established in 1980.[1] Many of these landmarks are also listed on the National Register of Historic Places, providing federal tax support for preservation, and some are further designate...

1986 book by John Lennon This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Skywriting by Word of Mouth – news · newspapers · books · scholar · JSTOR (October 2016) (Learn how and when to remove this template message) Skywriting by Word of Mouth AuthorJohn LennonLanguageEnglishGenreExperimental fictionPublisher...