The Indian Government is undertaking several initiatives to upgrade its aging railway infrastructure and enhance its quality of service. The Railway Ministry has announced plans to invest ₹5,400,000 crore (equivalent to ₹57 trillion or US$670 billion in 2023) to upgrade the railways by 2030.[1] Upgrades include 100% electrification of railways, upgrading existing lines with more facilities and higher speeds, expansion of new lines, upgrading railway stations, introducing and eventually developing a large high-speed train network interconnecting major cities in different parts of India and development of various dedicated freight corridors to cut down cargo costs within the country.
A semi-high-speed rail network will be introduced for connecting important routes, including Delhi–Agra, Delhi–Kanpur, Chennai–Hyderabad, Nagpur–Secunderabad, Mumbai–Pune–Solapur–Hyderabad and Mumbai–Goa. Initially, the trains will operate at a maximum speed of 160 km/h, which will be increased to 200 km/h after the rails are strengthened and fenced off. The Gatimaan Express began services on April 5, 2016, after safety clearances were obtained on its first route.[2][3] Currently, Vande Bharat Express is the fastest train running on 66 routes with highest trail speed of 183 km/h, with potential of reaching up to 200 km/h.[4]
Mission Raftaar was announced in the Railway Budget of 2016-17 with the target of increasing the average speed of freight and superfast mail/express trains. The railway is focusing on the New Delhi-Mumbai and New Delhi-Howrah routes as part of the Golden Quadrilateral. Mission Raftar compromises several measures have been taken to achieve the medium- and long-term goals of Mission Raftaar, including the construction of tracks, bridges, rail flyovers, bypasses, right-powering of trains, third and fourth line construction, replacement of conventional loco-hauled trains by MEMUs, changes in timetable, and modification of the 1×25 KV traction system to the 2×25 KV traction system, among others.[5][6]
The country has made target of having 4,500 Vande Bharat trains running across India by 2047.[7] Indian Railways have planned to introduce Vande Bharat trains in inner parts of India such as Ranchi-Puri, Raipur-Ranchi, Indore-Pune, Raipur-Varanasi, Pune-Goa, Goa-Mysore, Gokarna-Bangalore, Agartala-Guwahati, Indore-Lucknow to increase connectivity and economic development.[8][9] Indian Railways will soon start the upgradation of tracks with high strength rails (R-350).The railways has started the work to increase the design speed limit of the next-generation Vande Bharat sleeper trains to 220 kmph and work has also started to improve the Delhi-Mumbai and Delhi-Howrah lines to allow trains to run at 160 km/h.[10]
Dedicated freight corridors(dfc)
Dedicated freight corridors of 3,300 km length will also be completed thus freeing the dual use high demand trunk routes for running more high-speed passenger trains.[11] The project will continue to figure on the high priority list of all the government agencies associated with it. DFCs will help India reduce its high logistics costs from some 13-15 per cent of the GDP and help it move towards the target of 8 per cent.[12]
Till date in the commissioned sections, a total of 4000 trains have been run. Some of the trains in the section are achieving the average speed of 99.38 kmph in EDFC and the average speed is 89.50 kmph in WDFC.[13][14][15] Passenger train such as Vande Bharat Express have already ran on DFC tracks during exigencies.[16][17]
The Indian government conducted joint surveys with a Japanese government team in 2014, finally approving a corridor between Mumbai and Ahmedabad. The new high-speed service will use a Japanese Shinkansen system and rolling stock. The cost of procuring the technology is estimated to be around ₹110,000 crore (US$13 billion). India and Japan signed agreements for the project in December 2015; the Japanese government will fund 81% of the total cost with a soft loan fixed at a nominal interest rate.[18] A special committee has recommended the trains be run on an elevated corridor for an additional cost of ₹10,000 crore (US$1 billion), to avoid the difficulties of acquiring land, building underpasses and constructing protective fencing.[19] Indian Railways will operate the corridor for a five-year period after its commissioning and afterwards will be turned over to a private operator.[20]
Construction work of the corridor began in 2017 and will be completed by 2028.[21] However, there is uncertainty in other routes as many of the routes have been junked as unfeasible.[22]
In 2015, plans were disclosed for the construction of two locomotive factories with foreign partnerships in the state of Bihar, at Madhepura (electric) and at Marhowra (diesel). The diesel locomotive works will be jointly operated in a partnership with General Electric, which has invested ₹2,052 crore (US$240 million) for its construction and the electric locomotive works with Alstom, which has invested ₹1,293.57 crore (US$151 million). The factories will provide IR with 800 electric locomotives of 12,000 horsepower and a mix of 1,000 diesel locomotives of 4,500 and 6,000 horsepower each.[23] In November 2015, it was announced IR and GE would engage in an 11-year joint venture in which GE would hold a majority stake of 74%. IR would purchase 100 goods locomotives a year for 10 years, beginning in 2017; the locomotives would be modified versions of the GE Evolution series.[24] The diesel locomotive works will be built by 2018; GE will import the first 100 locomotives and manufacture the remaining 900 in India from 2019 onwards, also assuming responsibility for their maintenance over a 13-year period.[25][needs update] In the same month, a ₹20,000 crore (US$2 billion) partnership with Alstom to supply 800 electric locomotives from 2018 to 2028 was announced.[26]
Indian Railways is now moving to manufacturing high-end aluminium self-propelled 160 km/hour indigenous Make in India coaches that require no locomotive and are 10% cheaper than the comparable imports. The first such self-propelled train, Vande Bharat Express, was rolled out in October 2018. It is estimated to be 40% cheaper than foreign-built trains.[27]
Railway coach refurbishment
Railway coach refurbishment project aims for the refurbishment of 12 to 15 years old coaches at Carriage Rehabilitation Workshop in Bhopal to enhance passenger amenities and fire safety measures.[28][29]
Bio-toilets in all trains
In 2014, IR and DRDO developed a bio-toilet to replace direct-discharge toilets, which was the primary type of toilet used in railway coaches.[30] Upgrade of all trains to bio-toilet was completed by the end of FY2018-19 (c. Dec 2017).[31]
The direct discharge of human waste from trains onto the tracks corrodes rails, costing IR tens of millions of rupees a year in rail-replacement work. Flushing a bio-toilet discharges human waste into an underfloor holding tank where anaerobic bacteria remove harmful pathogens and break the waste down into neutral water and methane, which can then be harmlessly discharged onto the tracks.[30] IR plans to completely phase out direct-discharge toilets by 2020 or 2021. All-new coaches were installed in 2016, with older rolling stock to gradually becoming retrofitted. After Comptroller and Auditor General of India found 200,000 complaints related to the foul smelling and blocked bio-toilets, IR announced that it will add 80,000 bio-toilets (each costing INR 1 lakh) in FY2018-2019 and will start installing much improved "vacuum bio-toilets" (each costing INR 2.5 lakh) as well.[32] By Feb 2018, over 100,000 biotoilets have been installed and the project is on target to have 100% biotoilets by 31 March 2019.[33]
Hyperloop
Mumbai–Pune hyperloop
Mumbai–Pune hyperloop is a proposed 1000 km/h Hyperloop system that will take 14 minutes compared to current 3 hours to commute between these two cities while carrying 10,000 commuters per hour (5,000 in each direction). The route is found feasible and can be made operational by 2026 as per the Detailed Project Report (DPR) submitted to "Pune Metropolitan Region Development Authority" (PMRDA) by "Virgin Hyperloop company" in January 2018. Commuters and cargo will travel in pods traveling in the near-vacuum tubes at the speed of 1,000 km/h. DPR provided three feasible terminal end-points options in Mumbai, namely Dadar, Santacruz and the international airport. Currently, 300,000 people commute between these two cities daily in 110,000 vehicles (including 80,000 cars and 6,000 buses).[34] (as of Jan 2018)
On December 2024, India's First Hyperloop Test track was completed successfully at Thaiyur near Chennai and soon trials are about to start on this test track.[35]
There are 2 under implementation and 4 approved DFCs with many more planned. DFC will convert existing and implement new DFC as High-speed rail corridors of India.
[11]
Ministry of Defence (MoD) a list of at least 15 new geostrategic rail lines to be constructed. In 2012, MoD had identified following 14 geostrategic new rail lines to be built near China, Pakistan and Nepal border for the rapid and easier deployment of troops while simultaneously undertaking development of 73 similar geostrategic India-China Border Roads (ICBR) roads as border rail and road transport development in India is lagging much behind China:[38][39] China has built lines up to Shigatse in Tibet, with plans to connect it to Nepal and further to India.[39] After these lines proposed by MoD in 2013, GoI approved the initial surveys of all 14 lines in 2014,[40] of which at least 12 surveys had been already completed by 2014.[38] Later additional "Bilaspur–Manali–Leh line" was also added to the list of strategic lines.[41]
In 2016, the "Final Location Survey" (FLS) at the cost of INR345 crore for 4 lines to be taken up in the first phase was approved by the Cabinet, funding has been already provided by MoD and railway is undertaking survey of Missamari–Tenga–Tawang, Bilaspur–Manali–Leh, Pasighat–Tezu–Rupai and Lakhimpur–Bame–Silapathar lines.[41][42] Undulating terrain of young Himalayas and difficult geological conditions affect the pace of survey.[43][39]
As of July 2020, Cabinet approval for the funding for construction of any of these lines has not been granted yet.
Following projects along the LAC with China are also of relevance, only one of these is included in the MoD's list of strategically important defence projects, however all of these have been declared projects of strategic national importance.
Char Dham Railway in Uttrakhand
Dehradun–Uttarkashi–Maneri Gangotri Railway, included in the MoD list, will serve the disputed Nelang-Pulam Sumda area of LAC.
Indian Railways is converting its entire network to 1,676 mm (5 ft 6 in) broad gauge to enhance viability. New and converted broad gauge tracks are being introduced at the rate of 7.7 km per day. IR has projected completion date of the same till 2022.[48][49][50][51]
Track electrification
Electrification of all routes to save on the imported fuel costs and improve running speed, IR launched "Mission Electrification" in 2017 to electrify 100% or the remaining 38,000 km of the broad gauge network in five years from fy2017-18 to fy2022-23,[52] Railways annual fuel bill is ₹32,000 crore (US$3.75 billion or €3.92 billion), including ₹20,000 crore (US$2.34 billion or €2.45 billion) on diesel and converting to 100% electricity will save ₹10,000 crore (US$1.17 billion or €1.23 billion) by bringing the total fuel bill to ₹22,000 crore (US$2.57 billion or €2.70 billion) (c. Dec 2017).[53][52] Completion of electrification at the end of March 2024 was 45,881 km (28,509 mi) or 94.44%.[54]
Doubling of tracks
Doubling of tracks to reduce congestion and delays while improving safety. 15,000 km double tracks already exist by 2016 and funding for 12,500 km more track doubling was approved in 2016.[51] In fy2018-19 budget, 18,000 km of broad gauge track doubling and conversion was approved along with 36,000 km of track renewal for safety.[55]
Track renewal
In FY 2018-19 budget, 36,000 km of broad gauge renewal was approved to enhance the safety.[55]
Power and fuel
Off-the-grid solar-powered trains
Off-the-grid solar powered trains by installing 1 gigawatt of solar and 130 megawatts of wind power between 2017 and 2022.[56][57] India introduced world's first solar powered train in June 2017 as well as 50 coaches with rooftop solar farms.[58] In July 2017, IR rolled out its first DEMU train with rooftop solar panels that power the lights, fans and information display systems inside passenger coaches.[59]
In 2017, first train with solar rooftop panels started. Increasingly more trains will be operated with renewal onboard solar electricity generation.
LED lighting
SustainableLED lighting on all stations by March 2018 to cut electricity costs (Dec 2017).[61]
Safety
Elimination of unmanned level crossings on broad gauge network
Target completion date for this is March 2020.[55] Fy2017-18 has allocated funds to eliminate remaining 4,267 unmanned railway crossings on broad gauge routes in the next two years by March 2020.[55] A ₹100,000 crore (US$12 billion) "National Rail Safety Fund," for a complete safety upgrade by 2022, was announced in the 2017 Union Budget; among other improvements, the program would eliminate unmanned level crossings by March 2020.[62]Elimination of Unmanned Level Crossings at an average of 1217 per year by building an average of 1066 Road Over Bridges (ROB) and Road Under Bridges (RUB) per year (May 2016).[63][51]
Automated fire alarm system project started from 2013 when improved automated fire alarm System in Rajdhani Express trains were installed, these will be installed in the AC coaches of all regular trains.[65]
CCTV camera on stations
963 stations will have CCTV camera by the end of 2018.[31] Progressively CCTV cameras and wifi will be installed on all trains and stations.[55]
CCTV camera inside trains
IR has started to install cameras in some of the trains from fy2017-18 under the Nirbhaya fund. Progressively CCTV cameras will be installed in all trains.[55]
On 7 August 2019, IRCTC launched a payment wallet named iMudra.[66][67] On 11 August 2021, IRCTC introduced a smart card system through which unreserved train tickets which can be bought either at railway stations or online.[68]
Digital India driven digitalisation of railway to improvement efficiency and reduce cost. ₹3,500,000 million (equivalent to ₹4.9 trillion or US$57 billion in 2023) funding was approved in 2016.[51]
Select passengers with confirmed tickets will now be allowed to transfer tickets to someone else. Indian Railway Catering and Tourism Corporation (IRCTC) is now offering a pay-on-delivery option for train tickets on its website and app, where the customers can book their tickets and pay on delivery.
Escalators
Progressively escalators will be installed on all stations with a footfall of more than 25,000 per day.[55]
Station upgrades
600 stations will be upgraded, including 400 to be redeveloped, progressively to enhance services, safety and security.[55]
Kawasan Hauran. Keterangan dalam bahasa Inggris. Hauran (Arab: حورانcode: ar is deprecated / ALA-LC: Ḥawrān) juga disebut Hawran atau Houran) adalah sebuah wilayah yang terbentang di selatan Suriah dan utara Yordania. Wilayah tersebut bersebelahan di bagian utara dengan oasis Ghouta, di timur oleh lapangan Ash-Shafa, di selatan dengan gurun stepa Yordania dan di barat dengan Dataran Tinggi Golan. Daftar pustaka Wikimedia Commons memiliki media mengenai Hauran. Aalund, Flemming (June 1...
Basilika Lama GuadalupeBasilika Minor Bunda dari GuadalupeBasilika Lama GuadalupeLokasiKota MeksikoNegaraMeksikoDenominasiGereja Katolik RomaArsitekturStatusBasilika minorStatus fungsionalAktif Basilika Lama Guadalupe adalah sebuah gereja basilika minor Katolik yang terletak di Kota Meksiko, Meksiko. Basilika ini didedikasikan kepada Gelar Maria yaitu Bunda dari Guadalupe. Basilika ini diberikan statusnya pada tahun 1709.[1] Lihat juga Gereja Katolik Roma Gereja Katolik di Meksiko Daf...
Japanese animation Not to be confused with Amine. Part of a series onAnime and manga Anime History Voice acting Companies Studios Original video animation Original net animation Fansub Fandub Lists Longest series Longest franchises Manga History Publishers International market Manga artist Doujinshi Alternative Gekiga Yonkoma Iconography Scanlation Lists Best-selling series Longest series Demographic groups Children Shōnen Shōjo Seinen Josei Genres Bara Cooking Harem Isekai Iyashikei Lolico...
Musée Boijmans Van BeuningenLe musée Boijmans Van Beuningen situé au parc des MuséesInformations généralesNom local Museum Boijmans Van BeuningenType Musée d'artOuverture 3 juillet 1849 (174 ans)Surface 23 sallesVisiteurs par an 200 000Site web www.boijmans.nlCollectionsCollections Peintures anciennes et modernesNombre d'objets 126 000BâtimentArchitectes Ad van der Steur (en), Alexander Bodon (en), Hubert-Jan HenketLocalisationPays Pays-BasDivision administrative ...
Olimpiade ILogo Olimpiade Musim Panas 1896[a]Tuan rumahAthena, YunaniJumlah negara14[1]Jumlah atlet241 (semuanya laki-laki)[2]Jumlah disiplin43 dari 9 cabang olahragaPembukaan6 AprilPenutupan15 AprilDibuka olehRaja George I[3]StadionStadion Panathenaic Paris 1900 → Olimpiade Musim Panas 1896 (Greek: Θερινοί 1896, translit: Therinoí Olympiakoí Agónes 1896code: el is deprecated ), secara resmi dikenal sebagai Games of the I Olympiad (Greek: �...
Запоро́жский марш (укр. Запорозький марш) — музыкальное произведение на основе народной мелодии, которое записал, дополнил и воспроизвел бандурист Евгений Адамцевич. В настоящее время наиболее известно в обработке Виктора Гуцала, объединившего марш с песней о Дороше...
هذه المقالة عن جزر المملكة الهولندية الكاريبية. للأراضي المتممة لهولندا، طالع الجزر الكاريبية الهولندية. جزر المملكة الهولندية الكاريبية الأرض والسكان اللغة الرسمية الهولندية، والإنجليزية، وبابيامنتو الحكم التأسيس والسيادة التاريخ المنطقة الزمنية...
Shinkansen E6Shinkansen E6 bernomor induk Z14 pada Mei 2022Beroperasi16 Maret 2013; 11 tahun lalu (2013-03-16) – saat iniPembuatHitachi, Kawasaki Heavy IndustriesDigantikan olehShinkansen E3Tahun pembuatan2010–2014Jumlah sudah diproduksi168 kereta (24 rangkaian)Jumlah beroperasi168 kereta (24 rangkaian)Formasi7 kereta per rangkaianNomor armadaZ1–Z24Kapasitas338 (315 kelas Standar + 23 Hijau)Operator JR EastDepoAkitaJalurTōhoku Shinkansen, Akita ShinkansenData teknisBodi keretaAlum...
Daily newspaper in Atlanta, Georgia Not to be confused with American Jewish Committee or American Jewish Congress. This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: The Atlanta Journal-Constitution – news · newspapers · books · scholar · JSTOR (September 2023) (Learn how and when to remove this template messag...
2005 television film directed by Brett Leonard This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Man-Thing film – news · newspapers · books · scholar · JSTOR (November 2017) (Learn how and when to remove this message) Man-ThingDVD coverDirected byBrett LeonardWritten byHans RodionoffBased onMan-Thingby St...
Quadrilateral whose vertices can all fall on a single circle Examples of cyclic quadrilaterals In Euclidean geometry, a cyclic quadrilateral or inscribed quadrilateral is a quadrilateral whose vertices all lie on a single circle. This circle is called the circumcircle or circumscribed circle, and the vertices are said to be concyclic. The center of the circle and its radius are called the circumcenter and the circumradius respectively. Other names for these quadrilaterals are concyclic quadr...
Nidaros, Niðarós atau Niðaróss merupakan nama abad pertengahan dari Trondheim di Norwegia ketika ibu kota raja-raja Kristen pertama di negara ini. Itu dinamai untuk posisinya di mulut (bahasa Norse Kuno: óss) dari Sungai Nid (hari ini Nidelva). Meskipun ibu kota itu kemudian dipindahkan ke Oslo, Nidaros tetap menjadi pusat kehidupan spiritual Norwegia sampai Reformasi Protestan. Keuskupan Agung Nidaros dipisahkan dari Lund di Scania oleh wakil kepausan Nicholas Breakspear pada tahun 1152...
Bethlehem RecordsStato Stati Uniti Fondazione1953 a New York Fondata daGus Wildi Chiusura2015 Sede principaleNew York SettoreEtichetta discografica ProdottiJazz Modifica dati su Wikidata · Manuale La Bethlehem Records è stata un'etichetta discografica statunitense indipendente fondata da Gus Wildi nel 1953.[1] Indice 1 Storia 1.1 Acquisizioni selezionate 2 Discografia 2.1 Serie BCP 1000 2.2 Serie 'Deluxe' 12 pollici BCP 2.3 Serie 5000 2.4 Serie 6000 3 Note 4 Collegamen...
26°21′17″N 80°05′07″W / 26.354651°N 80.085233°W / 26.354651; -80.085233 Shopping mallMizner ParkView of Plaza Real, c. 2005Address327 Plaza RealBoca Raton, Florida 33432-3944Opening dateJanuary 11, 1991; 33 years ago (1991-01-11)DeveloperCrocker PartnersManagementBrookfield PropertiesOwnerBrookfield Properties[1]ArchitectCooper Carry & Associates, Inc.No. of stores and services44[1]No. of anchor tenants2 (1 open, ...
Parliamentary constituency in the United Kingdom, 1955 onwards AshfieldCounty constituencyfor the House of CommonsBoundary of Ashfield in NottinghamshireLocation of Nottinghamshire within EnglandCountyNottinghamshirePopulation101,914 (2011 census)[1]Electorate77,049 (December 2010)[2]Major settlementsSutton in Ashfield, Kirkby in Ashfield and EastwoodCurrent constituencyCreated1955Member of ParliamentLee Anderson (Reform UK)SeatsOneCreated fromBroxtowe Ashfield is a constituen...
烏克蘭總理Прем'єр-міністр України烏克蘭國徽現任杰尼斯·什米加尔自2020年3月4日任命者烏克蘭總統任期總統任命首任維托爾德·福金设立1991年11月后继职位無网站www.kmu.gov.ua/control/en/(英文) 乌克兰 乌克兰政府与政治系列条目 宪法 政府 总统 弗拉基米尔·泽连斯基 總統辦公室 国家安全与国防事务委员会 总统代表(英语:Representatives of the President of Ukraine) 总...
Legislative elections to the State Senate of Minnesota 2016 Minnesota Senate election ← 2012 November 8, 2016 (2016-11-08) 2020 → All 67 seats in the Minnesota Senate34 seats needed for a majority Majority party Minority party Leader David Hann(lost re-election) Tom Bakk Party Republican Democratic (DFL) Leader since November 9, 2012 November 4, 2010 Leader's seat 48th–Eden Prairie 3rd–Cook Last election 28 seats, 43.49% 39...
British-bred Thoroughbred racehorse Night HawkNight Hawk in 1913.SireGallinuleGrandsireIsonomyDamJean's FollyDamsireAyrshireSexStallionFoaled1910[1]CountryUnited Kingdom of Great Britain and IrelandColourBayBreederWilliam Hall WalkerOwnerWilliam Hall WalkerTrainerWilliam Jack RobinsonRecord10: 1-2-1Earnings£6,450[2]Major winsSt Leger (1913) Night Hawk (1910 – after 1924) was an Irish-bred, British-trained Thoroughbred racehorse and sire. He was unraced as a juvenile and...
Founder of the Afghan Durrani Empire (r. 1747–1772) Ahmed Shah Durrani redirects here. For the cricket umpire, see Ahmed Shah Durrani (umpire). Ahmad Shah Durraniاحمد شاه درانيPadishahGhazi Shāh Durr-i-Durrān (King, Pearl of Pearls)Portrait of Ahmad Shah Durrani, c. 1757, Bibliothèque nationale de France1st Emir of the Durrani EmpireReign1747–1772CoronationJune 1747[1]PredecessorPosition establishedSuccessorTimur Shah DurraniBornAhmad Khan Abdali1720–1722[2 ...