Rail Vikas Nigam Limited (RVNL) is an Indian central public sector enterprise (PSU) which works as the construction arm of the Ministry of Railways for project implementation and transportation infrastructure development. It was incorporated in 2003 to meet the country's surging infrastructural requirements and to implement projects on a fast-track basis as well as for creating a Railway equipment construction company. RVNL is a Navratna PSU in India under the administrative control of the Ministry of Railways, Government of India.
The organization undertakes project execution from concept to commissioning and creates project-specific SPVs. RVNL’s mandate includes the mobilization of extra-budgetary resources (EBRs) through a mix of equity and debts via these SPVs.
History
Rail Vikas Nigam Limited (RVNL) was established to implement the National Rail Vikas Yojana (NRVY), a project to develop railway infrastructure in India. The NRVY was announced by Prime MinisterAtal Bihari Vajpayee from the ramparts of the Red Fort during the Independence Day speech on 15 August 2002. The NRVY was formally launched by Vajpayee on 26 December 2002, and RVNL was incorporated under the Companies Act, 1956 on 24 January 2003. RVNL's two main objectives are to augment the capacity of rail infrastructure and raise extra budgetary resources for special purpose vehicle projects.[4]
RVNL opened its initial public offering (IPO) on 29 March 2019. It was the third railways-related PSU to initiate an IPO, after RITES and IRCON. The company offered a 12% stake at a price range of ₹17-₹19 per share.[5][6] The IPO was subscribed 1.78 times by close on 3 April earning ₹481 crore (US$56 million).[7] RVNL was listed on the Bombay Stock Exchange and the National Stock Exchange on 19 April 2019.[8]
Rail Vikas Nigam Limited successfully commissioned the Rail Coach Naveenikaran Karkhana at Sonipat, Haryana in October 2021. The Rolling Stock Complex is designed for sustainable development with Industry 4.0 compliant assembly line.Vande Bharat Express production to start in the factory in near future.
The Marathwada Rail Coach Factory, a project of RVNL in Latur, Maharashtra produced its first coach shell on Good Governance Day i.e. 25.12.2020. This state-of-the-art factory was set up and commissioned in just two years by RVNL to manufacture self-propelled trains for Indian Railways.[9]Vande Bharat Express production to start in the factory in near future.
Indian Railways is going to set up a railway wagon manufacturing unit in Telangana. The unit will be constructed on 160 acres of land in Kazipet at an estimated cost of `521 crore and is expected to be completed by February 2025. The Rail Vikas Nigam Limited (RVNL) was entrusted with this project.
The High Speed Rail Corporation of India Limited (HSRC) is an SPV which was incorporated in 2012 as a subsidiary of RVNL to implement high-speed rail projects in India.[10]
Kinet Railway Solutions Ltd
RVNL has incorporated a private company Kinet Railway Solutions Ltd which will act as the SPV that will sign the manufacturing-cum-maintenance agreement with the Ministry of Railways.[11]
Kyrgyzindustry-RVNL
RVNL established a 50:50 joint venture company, named Kyrgyzindustry-RVNL, with Kyrgyz company Kyrgyzindustry.[12] The company will develop rail, road, and other infrastructure in Kyrgyzstan.[13] RVNL informed the Securities and Exchange Board of India (SEBI) of the establishment of the joint venture on 10 December 2022.[14]
RVNL owns 50% equity in this project. The project length is 301 km and is for gauge conversion of Palanpur-Gandhidham section. Currently RVNL is doubling Samakhiali-Palanpur (248 km) anticipating increased traffic flow from Mundra and Deendayal Ports.
RVNL is the largest stakeholder in this SPV with 49.76% equity. The project length is 113.2 km and is for construction of new line from Obulaparivalli to Krishnapatnam port. Complete connectivity was provided in June 2019.
Haridaspur Paradip Railway Co Ltd
RVNL is the largest equity shareholder with 30%. This SPV is for a new 82 km line from Haridaspur to Paradip Port. This commercial route became operational on 30.07.2020
RVNL is the largest stakeholder in this SPV with 32.16% equity. This is for a new 102.42 km railway line from Angul-Sukinda. 80% of the project has already been completed and the commercial operation will begin shortly.
New SPVs under formation
Indian Port Rail Corporation Limited (IRPCL)
RVNL is participating in the formation of IRPCL. This is a SPV under the Ministry of Shipping, with the stakeholders being RVNL and 12 major ports. The initial authorised capital of the SPV is Rs 500 crore with RVNL's equity participation being Rs 10 crore only or 10% of the initial subscribed share capital.
The mandate of the SPV is to enhance rail connectivity to the various Ports in the country. This includes maintenance of Port Railways along with up-gradation, modernisation and capacity augmentation as and when required.
Rail connectivity to Rewas Port in Maharashtara
RVNL began as an organisation for executing various projects of railway engineering, to meet the shortfall of rail infrastructure that the existing system of that time could not fulfil. It was important to think out of the box and find a solution as eventually the price would be heavy with respect to the curtailment of opportunities and options available to a developing nation.
From beginning with railway capacity augmentation through track doubling, new railway lines, gauge conversion, railway electrification, RVNL has moved onto working on metro railways, multimodal transport system, port connectivity, turnkey projects i.e. workshops, training institutes, green buildings, high speed rail projects, cable stayed bridges, river and road bridges, vertical lift bridge, mountain Railways and tunnels.
Corporate Social Responsibility
Corporate Social Responsibility is a part of the ethos of Rail Vikas Nigam Limited. Aligning its goals to CSR objectives’, RVNL has implemented projects in the thematic areas of Health and Education. The geographic focus of RVNL CSR has been West Bengal, Chhattisgarh, Jharkhand, Uttar Pradesh, Madhya Pradesh, Uttarakhand and Odisha. About 60 per cent of CSR funds are spent in the education & health care sector for the underprivileged, marginalized communities and tribal belts.
Department of Public Enterprises Ratings
Rail Vikas Nigam Limited has been rated as "Excellent" by the Department of Public Enterprises (DPE) for 11 consecutive years. The Company has ranked 1st amongst the Railway PSEs and 3rd amongst PSUs in the country in the latest DPE ratings 2020-2021 with a MoU Score of 99.
Assessment Year
Rating
RVNL’s rank among Railway CPSEs
2007-08
Good
8th
2008-09
Very Good
10th
2009-10
Very Good
7th
2010-11
Excellent
5th
2011-12
Excellent
2nd
2012-13
Excellent
1st
2013-14
Excellent
2nd
2014-15
Excellent
1st
2015-16
Excellent
1st
2016-17
Excellent
1st
2017-18
Excellent
1st
2018-19
Excellent
2nd
2019-20
Excellent
1st
2020-21
Excellent
1st
Recent Accolades
Rail Vikas Nigam Limited team bagged two awards for excellence by Skoch group viz. Gold award for Public-Private Partnership and Silver award for response to Covid in 2022.[19]
Rail Vikas Nigam Limited was conferred the Roll of Honour as the fastest-growing Mini-Ratna of the year by Dalal Street Investment Journal.
Completed projects
The list of 18 projects completed in 2021-22 is as under:[20]
S.
No.
Railway
Name of Project
Plan Head
Length (km)
1.
East Coast Railway
Sambalpur-Titlagarh (182 km)
Doubling
182.00
2.
Northern Railway
Utraitia-Raebareli (65.6 km)
Doubling
68.04
3.
Northern Railway
Raebareli-Amethi (60.1 km)
Doubling
59.00
4.
South Central Railway
Vijaywada-Gudivada- Bhimavaram-Narasapur, Gudivada-Machlipatnam and Bhimavaram-Nidadavolu (221 km) - Doubling with electrification
Doubling
221.00
5.
South Central Railway
Secunderabad (Falaknuma)-Mehbubnagar doubling
Doubling
85.70
6.
West Central Railway
Bina-Kota (282.66 km) with RE
Doubling
282.66
7.
Western Railway
Ahmedabad-Botad (170.48 km)
GC
166.09
8.
Western Railway
Dhasa-Jetalsar (104.44 km)
GC
106.69
9.
Railway Electrification
Raninagar Jalpaigudi-New Bongaigaon - Guwahati (Incl) RE (382 km) (Part of Barauni - Katihar - Guwahati Incl. Katihar - Barsoi (836 km) RE
RE
374.98
10.
Railway Electrification
Chikjajur-Bellary RE (184 km)
RE
183.15
11.
Railway Electrification
Bengaluru-Omalur Via Hosur RE (196 km)
RE
196.00
12.
Railway Electrification
Utratia-Raebareli-Amethi 2nd line RE (126 km)
RE
126.00
13.
Deposit
RE of NTPC siding at Hotgi Station (37 km)
RE
34.41
14.
East Central Railway
Gaya -Setting up New MEMU car shed for maintaining 30 rakes of 16 coaches
WKSP
-
15.
Northern Railway
Sonipat-Setting up of coach periodical overhauling and refurbishment workshop
WKSP
-
16.
North Eastern Railway
Saidpur Bhitri- Setting up of Electric Loco Shed to home 200 Locos
WKSP
-
17.
Western Railway
Dhasa-Jetalsar-Subways in lieu of Level Crossing-35 Nos.
RSW
-
18.
South Central Railway
Lallaguda (Carriage Workshop)- Replacement of 100-Year-Old Administrative Building
OSW
-
The list of 102 projects fully completed since inception and up to March 2021 is as under:[20]
S. No.
Railway
Project Name
Type of Project
Length (km)
1.
Central Railway
Diva - Kalyan 5th & 6th Line
Doubling
11
2.
Central Railway
Pakni - Mohol Doubling
Doubling
17
3.
Central Railway
Panvel - Jasai JNPT Doubling
Doubling
28.5
4.
Central Railway
Pakni - Solapur Doubling
Doubling
16.28
5.
Eastern Railway
Gurup - Saktigarh Extn of 3rd Line
Doubling
26
6.
East Central Railway
Barauni - Tilrath Bypass Doubling
Doubling
8.3
7.
East Coast Railway
Talcher-Cuttack-Paradeep Doubling with 2nd Bridge on Rivers Birupa & Mahanadi
Doubling
3
8.
East Coast Railway
Jakhapura- Haridaspur 3rd Line
Doubling
23.3
9.
East Coast Railway
Cuttack - Barang Doubling
Doubling
14.3
10.
East Coast Railway
Rajatgarh-Barang Doubling
Doubling
31.3
11.
East Coast Railway
Khurda-Barang - 3rd line (35 km)
Doubling
32.32
12.
Northern Railway
New Delhi-Tilak Bridge- 5th & 6th line (2.65 km)
Doubling
2.65
13.
North Central Railway
Palwal - Bhuteswar 3rd Line
Doubling
81
14.
North Central Railway
Aligarh - Ghaziabad 3rd Line
Doubling
106.1
15.
North Western Railway
Bhagat Ki Kothi - Luni Doubling
Doubling
30.3
16.
North Western Railway
Karjoda - Palanpur Doubling
Doubling
5.4
17.
North Western Railway
Rewari- Manheru Doubling
Doubling
69.02
18.
North Western Railway
Rani-Keshav Ganj Doubling
Doubling
59.5
19.
North Western Railway
Abu Road-Sarotra Road- Patch doubling (23.12 km)
Doubling
23.12
20.
North Western Railway
Swaruganj-Abu Road - Patch doubling (25.36 km)
Doubling
25.36
21.
North Western Railway
Sarotra Road-Karjoda - Patch doubling (23.59 km)
Doubling
23.59
22.
Southern Railway
Attipattu - Korukkupet 3rd Line
Doubling
18
23.
Southern Railway
Pattabiram - Tiruvallur 4th Line & Tiruvallur - Arakkonam 3rd Line
Doubling
41.89
24.
Southern Railway
Tiruvallur - Arakkonam 4th Line
Doubling
28
25.
Southern Railway
Villipuram-Dindigul Doubling
Doubling
273
26.
Southern Railway
Thanjavur-Ponmalai - Doubling
Doubling
46.96
27.
South Central Railway
Pullampet - Balapalle Ph I of Gooty - Renigunta Doubling
Doubling
41
28.
South Central Railway
Krishnapatnam - Venkatachalam Doubling with RE
Doubling
16.5
29.
South Central Railway
Gooty - Renigunta Patch Doubling
Doubling
151
30.
South Central Railway
Raichur - Guntakal Doubling
Doubling
81.0
31.
South Central Railway
Guntur-Tenali - Doubling with electrification (24.38 km)
Doubling
25
32.
South Eastern Railway
Tikiapara - Santragachi Doubling
Doubling
5.6
33.
South Eastern Railway
Panskura - Kharagpur 3rd Line
Doubling
45
34.
South Eastern Railway
Panskura - Haldia Ph 1 Doubling
Doubling
14
35.
South Eastern Railway
Rajgoda - Tamluk (Jn. Cabin) Doubling
Doubling
13.5
36.
South Eastern Railway
Tamluk Jn. Cabin – Basulya Sutahata Doubling
Doubling
24.23
37.
South Eastern Railway
Goelkera-Monoharpur 3rd line (40 km)
Doubling
27.5
38.
South East Central Railway
Bilaspur - Urkura 3rd Line Doubling
Doubling
105
39.
South East Central Railway
Salka Road- Khongsara Patch Doubling
Doubling
26
40.
South East Central Railway
Khodri-Anuppur, with Flyover at Bilaspur (61.6 km)
Kharagpur (Nimpura) - Bhubaneswar Including Branch Line of Talcher - Cuttack - Paradeep
RE
581
59.
Railway Electrification
Bhubaneswar - Kottavalasa
RE
417
60.
Railway Electrification
Daund-Manmad Incl. Puntamba- Shirdi - RE
RE
255
61.
Railway Electrification
Reningunta - Guntakal RE
RE
308
62.
Railway Electrification
Yelahanka - Dharmavaram - Gooty RE
RE
306
63.
Railway Electrification
Bharuch - Samni - Dahej RE
RE
64
64.
Railway Electrification
Manheru- Hissar RE
RE
74
65.
Railway Electrification
Jakhal - Hisar (79 km)
RE
80.0
66.
Railway Electrification
Chhapra-Ballia-Ghazipur-Varanasi-Allahabad RE (330 km)
RE
330
67.
Railway Electrification
Guntakal-Kalluru RE (40 km)
RE
40
68.
Railway Electrification
Utretia - Rae Bareli - Amethi - Janghai RE (214 km)
RE
214
69.
Railway Electrification
Daund-Baramati (44 km)
RE
44
70.
Railway Electrification
Amla-Chhindwara-Kalumna
RE
257
71.
Railway Electrification
Raipur-Titlagarh (203 km) {Part of Vizianagaram - Rayagada - Titlagarh - Raipur (465 km)}
RE
203
72.
Railway Electrification
Rajpura - Dhuri - Lehra Mohabat (151 km)
RE
151
73.
Railway Electrification
Guntakal - Bellary - Hospet incl. Tornagallu - Ranjitpura Branch Line (138 km)
RE
138
74.
Railway Electrification
Wani- Pimpalkutti RE (66 km)
RE
66
75.
Railway Electrification
Manoharabad- Medchal (14 km)
RE
14
76.
Railway Electrification
Yalahanka-Penukonda (120.55 km)-Doubling
RE
-
77.
Railway Electrification
Jakhal - Dhuri - Ludhiana (123 km)
RE
123
78.
Railway Electrification
Guna-Gwalior (227 km)
RE
227
79.
Railway Electrification
Rani-Palanpur 166 km
RE
166
80.
Railway Electrification
Villupuram-Cuddalore Port-Mayiladuturai-Thanjavur & Mayiladuturai-Thiruvarur (228 km)
RE
228
81.
Railway Electrification
Raebareli-Unchahar incl. Dalmau-Daryapur (63 km)
RE
63
82.
Central Railway
Latur- Setting up of coach manufacturing factory
WKSP
-
83.
Eastern Railway
Civil Engineering Works in Connection with Diesel Loco Component Factory, Dankuni
WKSP
-
84.
Eastern Railway
Dankuni - Setting Up of Electric Loco Assembly and Ancillary Unit of CLW
WKSP
-
85.
East Central Railway
Barauni - 250 High Horse Power Loco Shed
WKSP
-
86.
East Coast Railway
Vadlapudi- Wagon PoH Workshop of 200 Nos Capacity Near Duvvada Station
WKSP
-
87.
North Central Railway
Kanpur - Construction of MEMU Car shed
WKSP
-
88.
South Eastern Railway
Setting Up of Diesel Multiple Unit (DMU) Manufacturing Factory at Sankrail/ Haldia
WKSP
-
89.
DLW
Varanasi - Augmentation of Production Capacity from 200 To 250 High HP Locos Per Year
WKSP
-
90.
North Eastern Railway
Aunrihar - DEMU Shed
WKSP
-
91.
South Central Railway
Workshop for Manufacture of Flat Bogies for LHB Design Coaches, Yadgir
WKSP
-
92.
METKOL
MM of Existing Corridor Noparanagar-Baranagar- Daksineshwar
MTP
4.14
93.
Eastern Railway
Barddhaman Yard - 4-lane road over bridge in lieu of 2-lane road over bridge No. 213
ROB
-
94.
Southern Railway
Srirangam-Tiruchchirapalli Town - 4-lane road over bridge in lieu of 2- lane bridge No.380-A
ROB
-
95.
North Western Railway
IOC Siding at Salawas (Deposit Work)
Others
2.82
96.
South Central Railway
Secunderabad- Upgradation of facilities at Centralised Training Academy for Railway Accounts
TRG
-
97.
South Central Railway
Moula Ali - Setting Up of Indian Railway Institute of Finance Management
TRG
-
98.
North Western Railway
Madar - Palanpur - Removing of PSR (Kms 589/1 to 590/1)
Track Renewal
-
99.
North Central Railway
Jhansi-Garhmau, Orai-Ata, Ata-Kalpi &Pokhrayan-Lalpur - Splitting of longer block sections
TF
-
100.
North Central Railway
Paman-Bhimsen - New B-class station
TF
-
101.
Western Railway
Sabarmati-Botad-subways in lieu of level crossing-23 Nos.
RSW
-
102.
Western Railway
Sabarmati-Botad-Subways in lieu of LCs-14 Nos.
RSW
-
Projects Under Implementation
There are 72 projects under various stages of implementation by RVNL.
The details of 66 projects assigned to RVNL till March 2021 and which are under implementation are as under:
S. No.
Railway
Name of Project
Plan Head
1
CR & SCR
Daund-Gulbarga - Doubling (224.9 km) and Pune-Guntakal -Electrification (641.37 km)
Doubling
2
ER
Nabadwipghat-Nabadwipdham upto BB loop (9.58 km) {Part of Kalinarayanpur-Krishnanagar with Krishnanagar-Shantipur Nabadwipghat- GC, Krishnanagar-Chartala, MM for Krishnanagar Chapra-NL, Naihati-Ranaghat-3rd line, Nabadwipghat-Nabadwipdham upto BB loop (9.58 km), Ranaghat-Lalgola strengthening (bridge No.2)}
Doubling
3
ER
Dankuni-Furfura Sharif NL {Part of Liluah-Dankuni - 3rd line (10.13 km) with extension to Furfura Sharif}
Doubling
4
ECR
Dhanbad-Sonnagar (Patratu-Sonnagar) - 3rd line (291 km)
Doubling
5
ECoR
Raipur-Titlagarh (203 km), incl new line Mandir Hasaud-Naya Raipur (20 km) and new MM for conversion of Raipur (Kendri)-Dhamtari & Abhanpur-Rajim branch (67.20 km)
Doubling
6
ECoR
Banspani-Daitari-Tomka-Jakhapura (180 km)
Doubling
7
ECoR
Vizianagaram-Sambhalpur (Titlagarh) 3rd line
Doubling
8.
NR
Rajpura-Bhatinda Doubling with Electrification (172.64 km)
Doubling
9.
NR
Janghai-Phaphamau DL with RE (46.79 km)
Doubling
10.
NCR
Bhimsen-Jhansi (206 km) with RE
Doubling
11.
NCR
Mathura-Jhansi 3rd line
Doubling
12.
NER
Varanasi-Madhosingh-Allahabad
Doubling
13.
NER
Bhatni - Aunrihar with electrification (125 km) (excl Indara - Mau (116.95 km))
Doubling
14.
NER
Phephna-Indara, Mau-Shahganj (excl. Indara-Mau) (150.28 km) DL
Doubling
15
SR
Madurai-Maniyachi-Tuticorin Doubling with RE (159 km)
Doubling
16
SR
Maniyachi - Nagarcoil Doubling with RE (102 km)
Doubling
17
SCR
Vijayawada-Gudur 3rd line
Doubling
18
SER
Kharagpur (Nimpura)-Adityapur 3rd line (132 km)
Doubling
19
SWR
Hospet-Hubli-Londa-Tinaighat-Vasco da Gama (352.28 km)
Doubling
20
WR
Palanpur-Samakhiali (247.73 km)
Doubling
21
WCR
Budni-Barkhera - 3rd line (33 km)
Doubling
22
NER
Lucknow-Pilibhit via Sitapur, Lakhimpur (262.76 km)
Gauge Conversion
23
CR
Dighi Port-Roha (33.76 km)
New Line
24
CR
Yevatmal- Nanded (206 km) NL
New Line
25
ECR
Fatuah-Islampur incl. material modification for extension of new line from Neora to Daniawan; Daniawan to Biharsharif; Biharsharif to Barbigha; Barbigha to Sheikhpura
New Line
26
ECoR
Angul-Sukinda Road (98.7 km)
New Line
27
NR
Rishikesh-Karnaprayag (125.09 km)
New Line
28
NR
Bhanupalli-Bilaspur-Beri (63.1 km)
New Line
29
NER
Mau-Ghazipur-Tarighat New Line
New Line
30
SECR
Dallirajhara-Rowghat (90 km) {Part of Dallirajhara-Jagdalpur (235 km)}
New Line
31
WCR
Indore-Jabalpur (342 km) NL sanctioned as Budhni-Indore (205 km)
New Line
32
CORE
Hospet - Hubli - Vasco da Gama (346 km)
RE
33
CORE
Kasganj-Bareilly-Bhojipura-Daliganj RE (401 km)
RE
34
CORE
RE of Sambalpur-Titlagarh Doubling project (96.596 km)
RE
35
CORE
Palanpur-Samakhiali (247.73 km) RE
RE
36
Deposit
Electrification of IOCL Siding at Pakni (4 km)
RE
37
Deposit
Electrification of Ultra Tech Cement Siding at Hotgi (8 km)
RE
38
Deposit
Electrification of Chettinad Cement Siding at Tilati (7.1 km)
RE
39
ER
Ranaghat (EMU Car Shed)-Inspection bay for 15 coach maintenance facilities
WKSP
40
ER
Jheel Siding Coaching Depot- Infrastructure development
WKSP
41
ECoR
Khurda Road - Construction of main line electrical multiple unit car shed (Phase-2)
WSKP
42
NCR
Jhansi-Setting up of coach periodic overhauling and refurbishment workshop
WKSP
43
NER
Dullahapur Yard - Provision of tower wagon periodic overhauling shed
WKSP
44
SCR
Kazipet - Workshop for Wagon Periodical Overhauling
WKSP
45
WR
Vadodara - Setting up of New PoH Shop for Electrical Locos
WKSP
46
SR
Repair of S&T Workshop at Podanur, Tamil Nadu
WKSP
47
ER
Samudragarh-Nabadwipdham - Road over bridge in lieu of level crossing No.14
RSW
48
SCR
New Crossing Station Between Umdanagar-Timmarpur Stations of Secunderabad-Mahabubnagar Section
TFC
49
SR
Manamadurai-Rameswaram - Repl of Full Scherzer Lift Span (Bridge No. 346) (Pamban Viaduct)
BRGW
50
SR
Manamadurai-Rameshwaram - Reconstruction of bridge (Pamban Viaduct) with navigational lift span
BRGW
51
NER
Daraganj - Rebuilding (Bridge No.111 On Ganga)
BRGW
52
NER
Setting Up of Centralised Training Institute for IRSME & IRSS Officers at Lucknow
TRG
53
WR
National Rail & Transportation Institute at Vadodara (NAIR)
TRG
54
WR
Construction of hostels in centralised training institutes (Umbrella Work 2019-20)
TRG
55
SECR
Direct Power Supply from Central Generating Agencies
OEW
56
WCR
Provision of Addl. Traction Substation at Budhni
OEW
57
SWR
New Station Building at Belguam
OSW
58
SWR
Second Entry Station Building at Belguam
OSW
59
SWR
Proposed Coaching Depot at Belgaum
OSW
60
SWR
Yard Remodelling Works at Belgaum
OSW
61
SCR
Multi-Modal Transport System (MMTS) - Phase-II in Hyderabad
MTP
62
SCR
Ghatkesar-Raigir (Yadadri)-Extension of multi modal transportation system Phase-II
MTP
63
MET
Baranagar-Barrackpore & Dakshineswar - Construction of Metro Railway (14.5 km)
MTP
64
MET
Dum Dum Airport-New Garia via Rajerhat - Construction of Metro Railway (32 km) including Naupara (Ex.)-Baranagar (2.6 km) {Part of Dumdum-Baranagar Metro Railway sanctioned as MM to Dumdum-New Garia Metro Railway vide letter No. 96/Proj/C/5/1/Pt. Dated 30.10.09}
MTP
65
MET
Joka-Binoy Badal Dinesh Bagh via Majerhat - Construction of Metro railway (16.72 km) incl material modification for extension from Joka Diamond Park (Phase-I)
MTP
66
NR
Final Location Survey for New Line Connectivity to Char Dham (327 km)
FLS
The list of Railway project assigned to RVNL in 2021-22 and under execution is as under:
S. No.
Railway
Name of Project
Plan Head
1.
WR
Infrastructure up-gradation of Training Institutes at NAIR Campus
TRG
The list of projects awarded to RVNL through Competitive Bidding in 2021-22 and under execution is as under:
S. No.
Agency /Client
Name of Project
Plan Head
1.
MP Metro
Design and Construction of Elevated 10 km Viaduct and 09 Elevated Metro Stations including all Civil, Structural, Roof structure, MEP works, Architectural finishes, Façade, etc for Indore Metro Rail Project.
Metro Works
2.
MP Metro
Design and Construction of 07 Elevated Metro Stations including Structures, Architectural Finishes, E&M Works etc. of Indore Metro Rail Project.
Metro Works
3.
NHIDCL
DPR Preparation for Highways in North-East Region in state of Nagaland for length of 200 KM.
DDC
4.
NHIDCL
DPR Preparation for Highways in North-East Region in state of Nagaland for length of 280 KM.
DDC
5.
NHIDCL
DPR Preparation for Highways in North-East Region in state of Mizoram for length of 740 KM.
Vliegbasis Leeuwarden Kenndaten ICAO-Code EHLW Koordinaten 53° 13′ 43″ N, 5° 45′ 38″ O53.2286111111115.76055555555561Koordinaten: 53° 13′ 43″ N, 5° 45′ 38″ O Höhe über MSL 1 m (3 ft) Verkehrsanbindung Entfernung vom Stadtzentrum 4 km nordwestlich von Leeuwarden Straße 1 km nördlich der A 31 Basisdaten Eröffnung 1938 Betreiber niederländische Luftstreitkräfte Start- und Landebahnen...
Justin PrenticeLahir25 Maret 1994 (umur 29)PekerjaanAktorTahun aktif2010–sekarang Justin Prentice (lahir 25 Maret 1994) adalah aktor asal Amerika Serikat. Prentice dikenal karena perannya dalam beberapa serial televisi Amerika Serikat, namun yang paling dikenal melalui serial Netflix, 13 Reasons Why sebagai Bryce Walker.[1] Filmografi Film Tahun Judul Peran Catatan 2011 Terri Dirty Jack 2015 Sex, Death and Bowling Rick Remaja 2017 Brownstone Luke Televisi Tahun Judul Pera...
Indian Urdu language poet, author, critic, and theorist (1935–2020) This article is about the Indian Urdu poet. For the Bangladeshi Bengali poet, see Shamsur Rahman (poet). Shamsur Rahman FaruqiBornShamsur Rahman Faruqi30 September 1935Pratapgarh, United Provinces, British India (now in Uttar Pradesh, India)Died25 December 2020(2020-12-25) (aged 85)Allahabad, Uttar Pradesh, IndiaResting placeAshok Nagar, Allahabad, beside his wifeOccupationPoet, criticLanguageUrduNationalityIndianAlma&...
Pour les articles homonymes, voir Juda. Pour un article plus général, voir Israël antique. Royaume de Judaמַמְלֶכֶת יְהוּדָה 931 av. J.-C. – 586 av. J.-C. Localisation du Royaume de Juda (en jaune).Informations générales Capitale Jérusalem Langue(s) Hébreu Religion Culte de YHWH Histoire et événements 930 av. J.-C. Fondation 609 av. J.-C. mort de Josias à Megiddo 2 adar 597 av. J.-C. prise de Jérusalem par les Babyloniens 586 av. J.-C. Siège de Jérus...
Grace Natalie Ketua Umum Partai Solidaritas Indonesia ke-1Masa jabatan16 November 2014 – 16 November 2021 PendahuluTidak ada, jabatan baruPenggantiGiring Ganesha Informasi pribadiLahirGrace Natalie Louisa4 Juli 1982 (umur 41)Jakarta, IndonesiaKebangsaanIndonesiaPartai politikPSISuami/istriKevin Osmond (m. 2011)Anak1Orang tuaBrata Ngadiman Anna ClementineAlma materInstitut Bisnis dan Informatika Kwik Kian GiePekerjaanPolitikusProfesiPewara ber...
American politician John Joseph CochranCochran in 1932Member of theU.S. House of Representativesfrom MissouriIn office1926–1947Preceded byHarry B. HawesSucceeded byFrank M. KarstenConstituency11th district (1926–1933)at-large district (1933–1935)13th district (1935–1947) Personal detailsBorn(1880-08-11)August 11, 1880Webster Groves, Missouri, U.S.DiedMarch 6, 1947(1947-03-06) (aged 66)St. Louis, Missouri, U.S.Resting placeCalvary CemeteryPolitical partyDemocratic John Joseph Coch...
Museum ship This article is about the first ship to cross the Northwest Passage. For other uses, see Gjoa (disambiguation). Gjøa at the Norwegian Maritime Museum in Oslo Gjøa was the first vessel to transit the Northwest Passage. With a crew of six, Roald Amundsen traversed the passage in a three-year journey, finishing in 1906.[1] History Gjøa, the first ship to sail through the Northwest Passage Gjøa in 1903, at the time of the Northwest Passage expedition Construction The 70 by...
Standar simbol racun Uni Eropa menurut Directive 67/548/EEC. Tengkorak dan tulang sudah lama menjadi standar simbol racun. Toksin (dari bahasa Yunani Kuno: τοξικόν, translit. toxikon) adalah sebuah zat beracun yang diproduksi di dalam sel atau organisme hidup,[1][2] kecuali zat buatan manusia yang diciptakan melalui proses artifisial. Kata ini pertama dipakai oleh kimiawan organik Ludwig Brieger (1849–1919).[3] Untuk zat beracun yang tidak diproduksi ...
2023 Indian Tamil period crime thriller film Viduthalai Part 1Theatrical release posterDirected byVetrimaaranWritten byVetrimaaranB. JeyamohanBased onThunaivanby B. JeyamohanProduced byElred KumarStarringSooriVijay SethupathiBhavani SreGautham Vasudev MenonCinematographyR. VelrajEdited byR. RamarMusic byIlaiyaraajaProductioncompaniesRS InfotainmentGrass Root Film CompanyDistributed byRed Giant MoviesRelease date 31 March 2023 (2023-03-31)[1] Running time150 minutes[...
Thomas EdisonJenius adalah satu persen inspirasi, sembilan puluh sembilan persen perspirasi.– Thomas Alva Edison, Harper's Monthly (September 1932)LahirThomas Alva Edison(1847-02-11)11 Februari 1847 Milan, Ohio, A.S.Meninggal18 Oktober 1931(1931-10-18) (umur 84) West Orange, New Jersey, A.S.KebangsaanAmerika SerikatPendidikanKeluar dari sekolahPekerjaanPereka cipta, pebisnisDikenal atasPendiri General ElectricSuami/istriMary Stilwell (m. 1871–...
Resolusi 566Dewan Keamanan PBBNamibiaTanggal19 June 1985Sidang no.2,595KodeS/RES/566 (Dokumen)TopikNamibiaRingkasan hasil13 mendukungTidak ada menentang2 abstainHasilDiadopsiKomposisi Dewan KeamananAnggota tetap Tiongkok Prancis Britania Raya Amerika Serikat Uni SovietAnggota tidak tetap Australia Burkina Faso Denmark Mesir India Madagaskar Peru Thailand Trinidad RSS Ukraina Resolusi 566 Dewan Keamanan Perser...
Strada romana in CiliciaStrada romana nella provincia di MersinLa strada romana vicino al villaggio di Sağlıklı, nel distretto di Tarso nella provincia di Mersin.Stato attuale Turchia Coordinate37°03′N 34°54′E / 37.05°N 34.9°E37.05; 34.9Coordinate: 37°03′N 34°54′E / 37.05°N 34.9°E37.05; 34.9 Informazioni generaliTipostrada romana Lunghezza3 km Informazioni militariUtilizzatoreImpero romano voci di architetture militari presenti su Wikipe...
This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: George Jones Salutes Hank Williams – news · newspapers · books · scholar · JSTOR (April 2023) (Learn how and when to remove this message) 1960 studio album by George JonesGeorge Jones Salutes Hank WilliamsStudio album by George JonesReleasedMay 1960Reco...
马来亚大学University of Malaya(英語)Universiti Malaya(馬來語)老校名七州府医学堂、爱德华七世医学院、莱佛士学院校训Knowledge is the Source of Progress(英語)Ilmu Punca Kemajuan(馬來語)校訓中譯「知识乃成功之本」创办时间1905年9月28日,118年前(1905-09-28)[1][2]学校类型国立综合研究型大学捐贈基金$385 million(2017年8月)校监Sultan Nazrin Muizzuddin Shah ibni Almar...
Peta infrastruktur dan tata guna lahan di Komune Royan. = Kawasan perkotaan = Lahan subur = Padang rumput = Lahan pertanaman campuran = Hutan = Vegetasi perdu = Lahan basah = Anak sungaiRoyanNegaraPrancis Royan adalah sebuah kota kecil dan merupakan salah satu commune dalam département Charente-Maritime, di sebelah barat Prancis. France. Kota ini terletak dekat kepulauan Ré, Oléron dan Île-d'Aix. Penduduknya pada tahun 1999 tercatat berjumla...
Port Authority Trans-Hudson rail station Newport PATH rapid transit stationThe underground station platform in 2013General informationLocationWashington Boulevard and Town Square PlaceNewport, Jersey City, New JerseyCoordinates40°43′36″N 74°02′05″W / 40.726676°N 74.034757°W / 40.726676; -74.034757Owned byPort Authority of New York and New JerseyPlatforms1 island platform (southbound)1 side platform (northbound)Tracks2Connections HBLR at Newport NJ Transit B...
Malcolm ForbesForbes in 1957Member of the New Jersey Senatefrom Somerset CountyIn officeJanuary 1952 – September 8, 1958Preceded byFreas HessSucceeded byWilliam E. Ozzard Personal detailsBornMalcolm Stevenson Forbes(1919-08-19)August 19, 1919Englewood, New Jersey, U.S.DiedFebruary 24, 1990(1990-02-24) (aged 70)Far Hills, New Jersey, U.S.Political partyRepublicanSpouse Roberta Remsen Laidlaw (m. 1946; div. 1985)Children5, inc...
См. также Почтовый музей (Лондон), ранее также известный как Национальный почтовый музей. Национальный почтовый музейангл. National Postal Museum Логотип музея Дата основания 1993 Дата открытия пн—вс 10:00—17:30 (кроме 25 декабря) Местонахождение Postal Square Building[вд] Адрес 2 Massachusetts Ave., N. E., Wa...
Hamlet and community in Carmarthenshire, Wales Hamlet and community in WalesLlanycrwysHamlet and communityLlanycrwysLocation within CarmarthenshireCommunityLlanycrwysPrincipal areaCarmarthenshirePreserved countyDyfedCountryWalesSovereign stateUnited KingdomPost townLlanwrdaPostcode districtSA19PoliceDyfed-PowysFireMid and West WalesAmbulanceWelsh UK ParliamentCaerfyrddinSenedd Cymru – Welsh ParliamentCarmarthen East and Dinefwr List of places UK Wales Carmarthenshir...