East Anglia Array

East Anglia Array
East Anglia ONE wind farm during construction
Map
CountryEngland, United Kingdom
LocationNorth Sea
Coordinates52°54′28″N 2°37′43″E / 52.90778°N 2.62861°E / 52.90778; 2.62861
StatusOperational
Construction beganJune 2018 (2018-06) [1]
Commission dateJuly 2020 (2020-07) [2]
Construction cost£ 2.5 billion
Owner(s)
Wind farm
TypeOffshore
Max. water depth53 m (174 ft) [3]
Distance from shore45.4 km (28.2 mi) (minimum)
Hub height120 m
Rotor diameter170 m
Site area300 km2 (116 sq mi)
Power generation
Units operational102
Units planned300
Nameplate capacity714 MW (2100 MW planned)
External links
Websitescottishpowerrenewables.com
Map
Wind farm layout

The East Anglia Array is a proposed series of offshore wind farms located around 30 miles off the east coast of East Anglia, in the North Sea, England. It has begun with the currently operational East Anglia ONE, that has been developed in partnership by ScottishPower Renewables and Vattenfall.[4] Up to six individual projects could be set up in the area with a maximum capacity of up to 7.2 GW. The first project, East Anglia ONE at 714 MW, received planning consent in June 2014 and contracts in April 2016. Offshore construction began in 2018 and the project was commissioned in July 2020.[1][2] It is expected to cost £2.5 billion.[5]

Planning

The East Anglia Zone is in the North Sea off the east coast of East Anglia. It is one of nine offshore zones belonging to the Crown Estate which formed part of the third licence round for UK offshore wind farms. At the closest point the zone is 14 km from shore.[6] East Anglia Offshore Wind (EAOW) is a partnership between ScottishPower Renewables and Vattenfall. In December 2009, EAOW was announced as the developer for the East Anglia Zone.[7]

The target capacity for the entire East Anglia Zone is 7200 MW which could require up to 1200 turbines.[6] Up to six individual projects could be set up in the area.[8] The first project is the East Anglia ONE windfarm,[6] which was commissioned in July 2020. EAOW has planning permission granted for East Anglia THREE, and has announced plans for further projects named East Anglia TWO and East Anglia ONE North.[6] If consents are received, all three new arrays will be built as a hub, combining to provide a rated capacity of 3.1GW of electricity from 263 wind turbines.[9] Funding has been agreed to improve local activities, courtesy of the Sizewell C and East Anglia Array projects.[10] Local opposition groups approve of the offshore wind turbines, but request a different location for the onshore facilities.[11]

East Anglia ONE

East Anglia ONE is located in the southern area of the East Anglia Zone, and is approximately 43 km (27 miles) from the shore.[12] The initial proposal was for an installed capacity of 1200 MW.[12] Cabling for East Anglia ONE lands near the River Deben at Bawdsey, runs north of Ipswich and is connected to the National Grid at Bramford.[13]

A plan was formally submitted to the government in December 2012,[14] and planning consent was granted in June 2014.[15] In October 2014 ScottishPower announced that it intended to scale down East Anglia ONE because of insufficient subsidies.[16] In February 2015 it was announced that ScottishPower would proceed with a scaled-down 714 MW project.[17]

A contract for £119/MWh was published on 27 April 2016, using 102 Siemens Wind Power direct-drive 7 MW turbines. Nacelles were built in Cuxhaven, while blades were made in Hull.[18][19] Due to water depths between 30-40 m, the turbines use jacketed foundations. Cabling is at 66 kV as opposed to the traditional 33 kV. Two export cables at 220 kV AC send the power to shore.[20] A support vessel is powered by used vegetable oil.[21]

Construction

East Anglia ONE windfarm construction, October 2019
Offshore substation located amongst the turbines

Onshore construction began in 2017,[22] with offshore construction starting in 2018. The first foundation was completed in June 2018 and the first turbine was completed in June 2019. The windfarm's offshore substation was installed in August 2018.[23]

First power was generated in September 2019,[24] turbine installation was completed in April 2020,[25] and commercial operation began in July 2020.[2]

East Anglia TWO

The East Anglia TWO wind farm is proposed to be 37.5 kilometres (23.3 mi) off-shore from Lowestoft and to have a generating capacity of 900MW. The project was granted a Development Consent Order in March 2022 and is planned to be ready by 2030.[26]

East Anglia THREE

The proposed East Anglia THREE wind farm is located in the northern half of the East Anglia Zone,[27] and is approximately 69 km (42 miles) from the shore.[8] It is expected to provide an installed capacity of 1200 MW[27] from up to 172 turbines.[8] The project was consented in 2017, and onshore construction commenced in July 2022 [28]

East Anglia ONE North

The proposed East Anglia ONE North wind farm will be located approximately 37.7 kilometres (23.4 mi) from Lowestoft, and would have a generating capacity of up to 800MW. The project was granted a Development Consent Order in March 2022 and is planned to be ready by 2030.[29]

References

  1. ^ a b Joshua S Hill. "714 Megawatt East Anglia ONE Offshore Wind Farm Completes Construction Of First Jacket Foundations". cleantechnica.com. Retrieved 26 July 2020.
  2. ^ a b c Adrijana Buljan (3 July 2020). "East Anglia One Now Officially Fully Operational". offshoreWIND.biz. Retrieved 26 July 2020.
  3. ^ Examining Authority’s findings and conclusions and recommendation in respect of the proposed East Anglia One Offshore Wind Farm and connection works (PDF) (Planning recommendation EN010025). The Planning Inspectorate. 18 March 2014.
  4. ^ "EAST ANGLIA ONE". scottishpowerrenewables.com. Retrieved 3 December 2022.
  5. ^ "Europe's largest contract for offshore wind turbines". ScottishPower Renewables. Retrieved 10 November 2020.
  6. ^ a b c d "FAQs". East Anglia Offshore Wind. Archived from the original on 18 February 2015. Retrieved 18 February 2015.
  7. ^ "About Us". East Anglia Offshore Wind. Archived from the original on 18 February 2015. Retrieved 18 February 2015.
  8. ^ a b c "East Anglia Three wind farm plans go on display". BBC News. 16 June 2014. Retrieved 18 February 2015.
  9. ^ "The East Anglia Hub". Scottish Power Renewables. Retrieved 2 September 2021.
  10. ^ "Energy Projects Update" (PDF). East Suffolk District.
  11. ^ Sanderson, Cosmo (9 January 2024). "Hollywood A-lister Ralph Fiennes' new star role in film battling green power 'steel and concrete'". Recharge | Latest renewable energy news.
  12. ^ a b "FAQs". East Anglia ONE. Archived from the original on 18 February 2015. Retrieved 18 February 2015.
  13. ^ "East Anglia ONE offshore wind farm". 4C offshore. Retrieved 16 August 2017.
  14. ^ "East Anglia One wind farm plan for Suffolk coast submitted". BBC News. 17 June 2014. Retrieved 18 February 2015.
  15. ^ "East Anglia One wind farm approved off Suffolk coast". BBC News. 17 June 2014. Retrieved 18 February 2015.
  16. ^ "Scottish Power scales back big East Anglia wind farm". Financial Times. 30 October 2014. Retrieved 18 February 2015.
  17. ^ "East Anglia One offshore wind farm plan reduced in size". BBC News. 26 February 2015. Retrieved 5 March 2015.
  18. ^ "East Anglia ONE's Price of £119/MWh Confirmed". Offshore Wind. 27 April 2016. Retrieved 27 April 2016.
  19. ^ admin (27 April 2016). "Siemens Awarded 714 MW Contract For East Anglia ONE Offshore Wind Farm". Archived from the original on 16 May 2016. Retrieved 27 April 2016.
  20. ^ "East Anglia ONE". 4C. Retrieved 3 December 2022.
  21. ^ "Vegetable oil powers SPR at East Anglia 1". reNEWS - Renewable Energy News. 25 June 2021. Archived from the original on 28 June 2021.
  22. ^ "Onshore cabling work to start as East Anglia One windfarm project takes further step forward". 28 September 2017. Archived from the original on 11 August 2018. Retrieved 10 August 2018.
  23. ^ "East Anglia ONE Offshore Substation Installed". ScottishPower Renewables. Retrieved 21 October 2019."East Anglia ONE Offshore Substation Installed". ScottishPower Renewables. Retrieved 21 October 2019.
  24. ^ "East Anglia ONE Generates First Power". www.offshorewind.biz. 12 September 2019. Retrieved 3 December 2022.
  25. ^ "TURBINE INSTALLATION COMPLETE ON EAST ANGLIA ONE OFFSHORE WINDFARM". www.scottishpowerrenewables.com. 29 April 2020. Retrieved 3 December 2022.
  26. ^ "East Anglia TWO". www.scottishpowerrenewables.com. 2021. Retrieved 3 December 2022.
  27. ^ a b "Welcome". East Anglia THREE. Archived from the original on 18 February 2015. Retrieved 18 February 2015.
  28. ^ "East Anglia THREE". www.scottishpowerrenewables.com. 2022. Retrieved 25 February 2023.
  29. ^ "East Anglia ONE NORTH". www.scottishpowerrenewables.com. 2021. Retrieved 3 December 2022.

External links


Read other articles:

RusiaРоссия (Laylay na Rusia) (Simbolo na Rusia) Say Rusia (Россия), sakey bansan ed Europa. Say kabesera ed Moscow. Saray Slavon Bukig so niwala bilang nikaduman grupo ed Europa diad baetan na komatlo tan komawalon siglo. Say sankaunaan ya Estadon Slavic, say Kievan Rus', so niletneg nen koma-9 a siglo tan angawat na Ortodokso a Inkakristiano nen 988. Diad inlabas na panaon, kinmapuy so Kievan Rus, tan say Grand Duchy na Moscow so linmaknab a nagmaliw a Tsardom na Russia. Nen koma-1…

American basketball coach and player (born 1980) Not to be confused with Dontae' Jones. Dahntay JonesJones with the Dallas Mavericks in 2012Los Angeles ClippersPositionAssistant coachLeagueNBAPersonal informationBorn (1980-12-27) December 27, 1980 (age 42)Trenton, New Jersey, U.S.Listed height6 ft 6 in (1.98 m)Listed weight225 lb (102 kg)Career informationHigh schoolSteinert (Hamilton, New Jersey)College Rutgers (1998–2000) Duke (2001–2003) NBA draft2003: 1st ro…

Эта страница требует существенной переработки. Возможно, её необходимо правильно оформить, дополнить или переписать.Пояснение причин и обсуждение — на странице Википедия:К улучшению/23 сентября 2023. Неогублённый гласный заднего ряда средне-верхнего подъёмаɤ Изображение

Science of determining the age of rocks, sediments and fossils An artistic depiction of the major events in the history of Earth Geochronology is the science of determining the age of rocks, fossils, and sediments using signatures inherent in the rocks themselves. Absolute geochronology can be accomplished through radioactive isotopes, whereas relative geochronology is provided by tools such as paleomagnetism and stable isotope ratios. By combining multiple geochronological (and biostratigraphic…

Pour les articles homonymes, voir FSK. Forces de sécurité du Kosovo Fondation 2009 Quartier-général Pristina, Kosovo Commandement Présidente de la République Vjosa Osmani Ministre de la défense Armend Mehaj Commandement des Forces de sécurité du Kosovo Lieutenant général Bashkim Jashari Main-d'œuvre Âges militaires 18 Disponibles au service militaire 5 000 hommes Actifs 5 000 Réservistes 3 000 Budgets Budget 104 000 000 € (2021) Pourcentage du PNB 0.87% Industrie F…

1999 studio album by MolotovApocalypshitStudio album by MolotovReleasedSeptember 14, 1999Length51:42LabelSurcoProducerMario Caldato Jr.Molotov chronology Molomix(1998) Apocalypshit(1999) Dance and Dense Denso(2003) Professional ratingsReview scoresSourceRatingAllmusic [1] Apocalypshit is the second studio album by the Mexican band Molotov produced by Mario Caldato, Jr. The album was released in September 1999 on Surco Records. Apocalypshit was the first Molotov album to be releas…

Komura Jutarō, 1905 Komura Jutarō (japanisch 小村 壽太郎; * 26. Oktober 1855 in Obi, Provinz Hyūga (heute: Nichinan, Präfektur Miyazaki); † 26. November 1911 in Tōkyō) war ein Politiker und Diplomat der Meiji-Zeit im Kaiserreich Japan. Er war zweimal Außenminister seines Landes (1901–1906 und 1908–1911). Inhaltsverzeichnis 1 Ausbildung 2 Karriere 3 Orden 4 Siehe auch 5 Literatur 6 Weblinks Ausbildung Komura studierte ab 1870 an der Daigaku Nankō (dem Vorläufer der Kaiserliche…

Pemuda BalaikotaHalte Trans SemarangLetakKecamatanSemarang TengahKelurahanSekayuAlamatJl. Pemuda No. 143Informasi lainStatusBeroperasiDibuka18 September 2009 (2009-09-18)Direnovasi2020[1]Konstruksi dan FasilitasJenisHalte permanenPintu5 Pintu Kedatangan Pintu 1: Koridor VII dan VIII Pintu 2: Koridor IV dan V Pintu 3: Koridor II, III Pintu 4: Koridor I Petugas TiketAdaVending Machine TiketTersedia[2]PelayananAwal PelayananPukul 05.30 WIBAkhir PelayananPukul 17.40 WIBLayanan H…

Cantón de Moustiers-Sainte-Marie Cantón Situación del cantón de Moustiers-Sainte-Marie Coordenadas 43°50′54″N 6°13′19″E / 43.84833333, 6.22194444Capital Moustiers-Sainte-MarieEntidad Cantón • País  Francia • Región Provenza-Alpes-Costa Azul • Departamento Alpes de Alta Provenza • Distrito Digne-les-BainsConsejero general Michèle Bizot-Gastaldi (2008-2015)Subdivisiones Comunas 3Superficie   • Total 202.82 km²1Poblaci

Bendera Andorra Pemakaian Bendera nasional Perbandingan 7:10 Dipakai 27 Agustus 1971 Rancangan Triwarna vertikal berwarna biru, kuning dan merah; serta lambang Andorra di tengahnya. Varian bendera Bendera Andorra Pemakaian Bendera dan bendera kapal sipil Perbandingan 7:10 Rancangan Bendera trikolor dengan warna merah, kuning dan biru. Bendera Andorra ini dipakai oleh pemerintahan sejak tahun 1866. Desainnya meniru bendera Prancis dan Spanyol dengan mengganti warnanya. Bendera triwarna ini mirip …

Halaman ini berisi artikel tentang Partai Ba'ath pan-Arab, yang memimpin Suriah namun memiliki cabang di berbagai negara. Untuk cabang yang mengendalikan Suriah, lihat Partai Sosialis Arab Ba'ath – Kawasan Suriah. Koordinat: 33°30′23″N 36°17′13″E / 33.50639°N 36.28694°E / 33.50639; 36.28694 Partai Ba'ath Sosialis Suriah حزب البعث العربي الاشتراكيSekretaris JenderalBashar al-AssadDibentuk25 Februari 1966 (25 Februari 1966)Dipisah&#…

Cet article est une ébauche concernant un dirigeant de football. Vous pouvez partager vos connaissances en l’améliorant (comment ?) selon les recommandations des projets correspondants. Pour les articles homonymes, voir André Billy et Billy. André BillyAndré Billy en 1900BiographieNaissance 13 mai 1877Bazeilles, FranceDécès 9 août 1913 (à 36 ans)Saint-Gervais-les-Bains, FranceSurnom L'EmpereurNationalité FranceActivité FootballeurAutres informationsSport FootballÉquipe Ol…

本條目存在以下問題,請協助改善本條目或在討論頁針對議題發表看法。 此條目可能包含原创研究。 (2018年10月4日)请协助補充参考资料、添加相关内联标签和删除原创研究内容以改善这篇条目。详细情况请参见讨论页。 此條目需要补充更多来源。 (2018年10月4日)请协助補充多方面可靠来源以改善这篇条目,无法查证的内容可能會因為异议提出而被移除。致使用者:请搜索一下

Tamarix aphylla Tamarix aphylla in natural habitat in Algeria Klasifikasi ilmiah Kerajaan: Plantae (tanpa takson): Angiospermae (tanpa takson): Eudikotil (tanpa takson): Core Eudikotil Ordo: Caryophyllales Famili: Tamaricaceae Genus: Tamarix Spesies: T. aphylla Nama binomial Tamarix aphylla(L.) Karst. Sinonim Tamarix articulata Tamarix aphylla merupakan spesies Tamarix terbesar (tinggi: mencapai 18 meter atau 60 kaki) . Spesies ini mempunyai sederetan nama daerah, termasuk: Athel pine …

Flooding of Paris, France in January-March, 1910 by the river Seine Map of Paris with blue hatched zone representing approximately the floods of 1910. The 1910 Great Flood of Paris (French: Crue de la Seine de 1910) was a catastrophe in which the Seine River, carrying winter rains from its tributaries, flooded the conurbation of Paris, France. The Seine water level rose 26.2467 feet (eight meters) above the ordinary level.[1] Chronology During the flood on Quai de Passy In the winter of …

American animated television series The Secret SaturdaysGenreActionAdventure[1]Created byJay StephensDeveloped byBrandon SawyerJay StephensFred SchaeferDirected byScott Jeralds (also supervising director)Voices ofPhil MorrisNicole SullivanSam LernerDiedrich BaderFred TatascioreWill FriedleCorey BurtonComposerMichael TaveraCountry of originUnited StatesOriginal languageEnglishNo. of seasons2No. of episodes36 (list of episodes)ProductionExecutive producerJay StephensProducersScott JeraldsF…

This article is about the school in South Africa. For other schools with a similar name, see Bishop's College (disambiguation). All-boys private school in Cape Town, Western Cape, South AfricaDiocesan College (Bishops)Bishop Diocesan College school crestAddressCamp Ground Road, RondeboschCape Town, Western Cape 7700South AfricaInformationSchool typeAll-boys private schoolMottoPro Fide Et PatriaFor Faith and FatherlandReligious affiliation(s)ChristianityEstablished2 October 1849; 174…

British TV series TimeOfficial poster for Series 1 (2021)GenreCrime dramaCreated byJimmy McGovernWritten by Jimmy McGovern Helen Black Directed by Lewis Arnold Andrea Harkin Starring Sean Bean Stephen Graham Jodie Whittaker Tamara Lawrance Bella Ramsey Siobhan Finneran Music bySarah WarneCountry of originUnited KingdomOriginal languageEnglishNo. of series2No. of episodes6ProductionExecutive producers Lewis Arnold Sean Bean Stephen Graham Jimmy McGovern Michael Parke Lucy Richer Tom Sherry Produc…

Lam KunyetGampongNegara IndonesiaProvinsiAcehKabupatenAceh BesarKecamatanDarul KamalKode Kemendagri11.06.19.2004 Luas... km²Jumlah penduduk... jiwaKepadatan... jiwa/km² Lam Kunyet pada tahun 1890 Lam Kunyet merupakan salah satu gampong yang ada di mukim Biluy, Darul Kamal, Aceh Besar, provinsi Aceh, Indonesia. Pranala luar (Indonesia) Keputusan Menteri Dalam Negeri Nomor 050-145 Tahun 2022 tentang Pemberian dan Pemutakhiran Kode, Data Wilayah Administrasi Pemerintahan, dan Pulau tahun 202…

Lihat pula: Empat penjuru bumi Empat benua, ditambah Australia, yang ditambahkan belakangan. Bangsa Eropa pada abad ke-16 membagi dunia menjadi empat benua: Afrika, Amerika, Asia dan Eropa.[1] Setiap empat benua tampak mewakili kuadran dunia—Eropa di utara, Asia di timur, Afrika di selatan dan Amerika di barat. Pembagian tersebut timbul pada zaman Renaisans, yang juga membagi dunia menjadi empat musim, empat unsur klasik, empat mata angin, empat kebajikan klasik, dll. Catatan ^ Yang ti…

Kembali kehalaman sebelumnya

Lokasi Pengunjung: 3.15.229.140