China Railway CR400BF
Chinese high-speed train model
China Railway CR400BF CR400BF-A-3032 departing from depot at Guangnan,
Beijing as G509
In service BF: 15 August 2016 (2016-08-15 ) BF-A: 12 June 2018 (2018-06-12 ) BF–B: 5 January 2019 (2019-01-05 ) BF–G: 9 June 2019 (2019-06-09 ) BF–C: 30 December 2019 (2019-12-30 ) BF–Z, BF–GZ, BF–BZ: 25 June 2021 (2021-06-25 ) BF–AZ: 20 July 2022 (2022-07-20 ) BF–BS: 15 June 2024 (2024-06-15 ) Manufacturer CRRC Changchun Railway Vehicles Family name Fuxing Formation BF, BF-C, BF-G, BF-Z, BF-GZ, BF-J, BF-S, BF-GS: 8 cars/trainset (4M4T) BF-A, BF-AZ, CRH-0306: 16 cars/trainset (8M8T) BF-B, BF-BZ, BF-BS: 17 cars/trainset (8M9T) Operators China Railway Corporation Train length BF, BF–G: 209 m (685 ft 8 in) BF–0031: 210 m (689 ft 0 in) BF–C, BF–Z, BF–GZ, BF–J, BF–G–0051, BF–S, BF–GS: 211 m (692 ft 3 in) BF–A: 414 m (1,358 ft 3 in) BF-AZ: 416.2 m (1,365 ft 6 in) BF–B: 439.8 m (1,442 ft 11 in) BF–BZ, BF–BS: 442 m (1,450 ft 2 in) Width 3,360 mm (11 ft 0 in) Height 4,050 mm (13 ft 3 in) Platform height 1,250 mm (4 ft 1.2 in) Maximum speed Service: 350 km/h (220 mph) Design: 400 km/h (250 mph) Record: CR400BF: 420 km/h (260 mph) CR400BF-J: 450 km/h (280 mph) Axle load <17 t (16.7 long tons; 18.7 short tons) Traction system Water cooling IGBT -VVVF inverter control (Zhuzhou CRRC Times Electric )Traction motors YJ-268A and YJ-305A external sector 3-phase AC induction motor (Zhuzhou CRRC Times Electric) Electric system(s) 25 kV 50 Hz AC Overhead catenary Current collector(s) Pantograph Track gauge 1,435 mm (4 ft 8+ 1 ⁄2 in ) standard gauge
CR400BF prototype testing in the National Railway Test Center, Beijing
The CR400BF Fuxing (Chinese : 复兴号 ; pinyin : Fùxīng Hào ) is a Chinese electric high-speed train that was developed and manufactured by CRRC Changchun Railway Vehicles . As part of the China Standardized EMU, The CR400BF is designed to operate at a cruise speed of 350 km/h (217 mph) and a maximum speed of 420 km/h (261 mph) in commercial service. Development on the project started in 2012, and the design plan was finished in September 2014. The first EMU rolled off the production line on 30 June 2015.[ 1] The series received its current designation of Fuxing in June 2017, with the nickname Golden Phoenix .[ 2] It is among the world's fastest conventional high-speed trains in regular service, with an operating speed of 350 km/h (217 mph).[ 3]
Variants
CR400BF
8-car standard production model with standard maximum speed of 420 km/h (261 mph). It is manufactured by CRRC Changchun Railway Vehicles .
CR400BF–A
16-car version manufactured by CRRC Changchun Railway Vehicles .[ 4] Testing of this variant started on March 9, 2018.[ 5] The first CR400BF-A started operation of the Beijing–Shanghai high-speed railway on June 29, 2018.[ 6] These sets are 415 m (1,361 ft 7 in) and have a passenger capacity of 1,193 people.[ 6]
CR400BF–B
17-car version. It is manufactured by CRRC Changchun Railway Vehicles .[ 7]
CR400BF–C
8-car ATO enabled version with redesigned interior and exterior used on the Beijing–Zhangjiakou intercity railway in preparation for the 2022 Winter Olympics . It is manufactured by CRRC Changchun Railway Vehicles .[ 8] The interior design incorporates snow and ice elements with blue ambient light. The train is also equipped with high-definition LED destination displays, wireless charging for business class seats, and smart glass windows. Additional features include snowboard storage and urine sampling areas.[ 9] [ 10] The trains are manufactured by CRRC Changchun Railway Vehicles . CR400BF–C started operating on December 30, 2019, with the opening of the Beijing–Zhangjiakou ICR.[ 11]
CR400BF–G
8-car sandstorm and cold climate resistant version for use in more extreme weather. It is manufactured by CRRC Changchun Railway Vehicles .[ 12] Shares same exterior style as the CR400BF.
CR400BF–Z
8-car variant with redesigned and upgraded interior and exterior. It is manufactured by CRRC Changchun Railway Vehicles .
CR400BF–AZ
16-car variant with upgrade new train in December 2023. Manufactured by CRRC Changchun Railway Vehicles .
CR400BF–BZ
17-car variant with redesigned and upgraded interior and exterior. It is manufactured by CRRC Changchun Railway Vehicles .
CR400BF–GZ
8-car sandstorm/cold resistant version with redesigned interior and exterior. It is manufactured by CRRC Changchun Railway Vehicles .
CR400BF–J
8-car HSR inspection train with redisigned exterior, similar to CR400BF-C and BF-Z series.
CR400BF–BS
Like the CR400AF-BS , an upgraded 17-car variant called the CR400BF-BS was introduced in April 2024 for use on the Beijing-Shanghai high speed railway from 15 June 2024. This variant features interior enhancements to accommodate more passengers and a new seating class called Premium First Class, which is intermediate between First Class and Business Class.
Specification
Train type
Car dimensions
Total length
Top speed
Seating capacity
Formation
Power output (under 25 kV)
Entry into Service
CR400BF/BF–A/BF–B/BF–C/BF–S/BF–G
CR400BF
End cars length: 27.089 m (88 ft 10.5 in) Inter cars length: 25.65 m (84 ft 2 in) Width: 3.36 m (11 ft 0 in) Height: 4.05 m (13 ft 3 in)
Calculated: 209.1 m (686 ft 0 in) Real: 209 m (685 ft 8 in)
Test: 420 km/h (261 mph) Design: 400 km/h (249 mph) Continuous operation: 400 km/h (249 mph) Current operation: 350 km/h (217 mph)
556: 10 business, 28 first and 518 standard 576: 10 business, 28 first and 538 standard
4M4T
10.14 MW (13,598 hp )
August 15, 2016
CR400BF–C
576: 10 business, 28 first and 538 standard 541: 10 business, 28 first and 503 standard
December 30, 2019
CR400BF–G
576: 10 business, 28 first and 538 standard
June 9, 2019
CR400BF–A
Calculated: 414.26 m (1,359 ft 1 in) Real: 414 m (1,358 ft 3 in)
1193: 22 business, 148 first and 1023 standard
8M8T
20.28 MW (27,196 hp )
June 12, 2018
CR400BF–S
UNKNOWN
Under testing
CR400BF–B
Calculated: 438.928 m (1,440 ft 0.6 in) Real: 439.8 m (1,442 ft 11 in)
1283: 22 business, 148 first and 1113 standard
8M9T
January 5, 2019
Power Destination
M – Motor car
T – Trailer car
C – Driver cabin
P – Pantograph
Coach Type
ZY – First Class Coach
ZE – Second Class Coach
ZEC – Second Class Coach/Dining Car
ZYS – First Class/Business Coach
ZES – Second Class/Business Coach
WR – Soft Sleeper Car
WRC – Soft Sleeper/Dining Car
DGN – Multi-function Coach
CR400BF, CR400BF–C, CR400BF–Z, CR400BF–G, CR400BF–GZ, CR400BF–GS, CR400BF–S
Coach No.
1
2
3
4
5
6
7
8
Type1 4 5 6
ZYS
ZE
ZEC
ZE
ZES
Type2 3
ZYS
ZE
DGN
ZE
ZES
Power Configuration
Mc
Tp
M
T
M
Tp
Mc
Power Units
Unit 1
Unit 2
Capacity1
5+28
90
75
63
90
5+40
Capacity2
5+28
90
75
48
90
5+40
Capacity3
6+28
90
75
48
90
6+40
Capacity4
6+28
90
75
63
90
6+40
Capacity5
5+28
90
75
63
90
6+40
Capacity6
5+32
93
78
83
93
6+43
^1 Remaining series
^2 CR400BF–C–5145 trainset
^3 CR400BF–C–5162 trainset
^4 Remaining CR400BF–Z and CR400BF–GZ series
^5 CR400BF–Z–3146–3156, CR400BF–GZ–5256–5262, CR400BF–Z–5263–5275 series
^6 CR400BF–GS and CR400BF–S series
CR400BF–A, CR400BF–AZ
Coach No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Type1 2
SW
ZY
ZE
ZEC
ZE
ZY
ZYS
Power Configuration
Tc
M
Tp
M
Tp
M
T
M
Tp
M
Tp
M
Tc
Power Units
Unit 1
Unit 2
Unit 3
Unit 4
Capacity1
5+12
60
90
75
48
90
60
5+28
Capacity2
6+12
60
90
75
48
90
60
6+28
^1 CR400BF–A series
^2 CR400BF–AZ series
CR400BF–B, CR400BF–BZ, CR400BF–BS
Coach No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
Type1 2 3
SW
ZY
ZE
ZEC
ZE
ZY
ZYS
Power Configuration
Tc
M
Tp
M
Tp
M
T
M
Tp
M
Tp
M
T
Tc
Power Units
Unit 1
Unit 2
Unit 3
Unit 4
Capacity1
5+12
60
90
75
48
90
60
5+28
Capacity2
6+12
60
90
75
48
90
60
6+28
Capacity3
6+14
62
93
78
73
93
62
5+24
^1 CR400BF–B series
^2 CR400BF–BZ series
^3 CR400BF–BS series
Distribution
As of September 2024, there are 545 CR400BF series EMU in service.
Train model letter identification
G – Cold-resistant
C, Z – Intelligent
S – Enhanced-technology
E – Sleeper
A – 16-car trainset
B – 17-car trainset
Vehicle number distinction
0X0X, 00XX – Sample vehicles, test vehicles
03XX, 05XX – Vehicles or sample vehicles purchased by non-national railway groups
3XXX: Trains produced from CRRC Tangshan Locomotive and Rolling Stock
5XXX: Trains produced from CRRC Changchun Railway Vehicles
Operator
Quantity
Serial number
Depot
Notes
CR400BF
Beijing Railway Bureau
39
0031, 0503, 3067, 3068, 3085–3087, 3090, 3091, 5006, 5022, 5025–5037, 5040–5042, 5070–5072, 5074, 5076, 5077, 5106–5112
Caozhuang
0503 is the prototype trainset 0031 was the 400kph high-speed test trainset
Shanghai Railway Bureau
39
3002, 3004, 3006, 3007, 3009–3012, 3014–3016, 3018, 3020, 3022, 3023, 3036, 3044, 3048, 3060, 3064, 3066, 3078, 3080, 3088, 3089, 3106, 3107, 5012, 5013, 5018, 5023, 5024, 5043–5045, 5068, 5073, 5075, 5078
Shanghai Hongqiao
3106 and 3107 equipped with cab side door
40
3001, 3003, 3005, 3008, 3013, 3017, 3019, 3021, 3034, 3035, 3037–3043, 3045–3047, 3049, 3059, 3061–3063, 3065, 3069–3077, 3079, 3081–3084
Nanjing South
16
5001–5004, 5007–5011, 5016, 5017, 5019, 5046, 5079–5081
Hangzhou West
Guangzhou Railway Group
10
0507, 5005, 5014, 5015, 5020, 5021, 5038, 5039, 5047, 5069
Guangzhou South
0507 is the prototype trainset
Shenyang Railway Bureau
1
0305
Shenyang North
Model car
CR400BF–A
Beijing Railway Bureau
7
3024, 3028–3030, 3054, 3056, 3092
Beijing South
4
5082–5084, 5087
Caozhuang
9
3025, 3031–3033, 3050–3053, 3055
Xiong'an
Shanghai Railway Bureau
25
3097–3105, 5048, 5049, 5053, 5054, 5057–5059, 5061, 5065, 5066, 5090–5092, 5094–5096
Shanghai Hongqiao
21
3026, 3027, 3057, 3058, 3093–3096, 5050–5052, 5055, 5056, 5060, 5062–5064, 5067, 5088, 5089, 5093
Nanjing South
Zhengzhou Railway Group
8
5085, 5086, 5156–5161
Zhengzhou East
CR400BF–B
Shanghai Railway Bureau
14
5097–5105, 5151–5155
Shanghai Hongqiao
CR400BF–G
Shenyang Railway Bureau
15
5113, 5115–5117, 5123, 5124, 5129–5133, 5175, 5176, 5199, 5200
Shenyang North
Trainsets numbered 5175 afterwards equipped with cab side door
17
5118–5122, 5125, 5134, 5177–5184, 5201, 5202
Changchun
Trainsets numbered 5177 afterwards equipped with cab side door
Beijing Railway Bureau
8
5114, 5137, 5140, 5146–5150
Beijing North
21
3108–3116, 5163–5168, 5171–5174, 5193, 5194
Chaoyang
All equipped with cab side door
16
5126–5128, 5135, 5136, 5138, 5139, 5141, 5142, 5169, 5170, 5187, 5191, 5192, 5195, 5196
Beijing South
Trainsets after 5169 equipped with cab side door
8
0051 5185, 5186, 5188–5190, 5197, 5198
Caozhuang
0051 was the 400kph high-speed train testset
CR400BF–C
Beijing Railway Bureau
3
5144, 5145, 5162
Beijing North
5162 painted specifically for 2022 Winter Olympics and equipped with cab side door
CR400BF–Z
Beijing Railway Bureau
27
3138–3145 5210–5213, 5220–5227, 5269–5275
Beijing South
1
0311
Beijing West
1
0312
Chaoyang
Shanghai Railway Bureau
22
0521–0524 3125–3137 5263–5268
Hangzhou West
524 painted specifically for 2022 Asian Games
Zhengzhou Railway Bureau
4
0511–0514
Zhengzhou East
Guangzhou Railway Bureau
22
3117–3124, 5228–5241
Guangzhou South
Wuhan Railway Bureau
10
5242–5251
Wuhan
Xi'an Railway Bureau
11
3146–3156
Xi'an North
CR400BF–AZ
Zhengzhou Railway Group
6
0515–0520
Zhengzhou East
Shanghai Railway Group
4
5252–5255
Nanjing South
CR400BF–BZ
Shanghai Railway Group
2
5208, 5209
Shanghai Hongqiao
CR400BF–GZ
Beijing Railway Bureau
6
5143, 5203–5207
Chaoyang
5143 was originally a BF-C trainset
Harbin Railway Bureau
13
5214–5219, 5256–5262
Harbin West
CR400BF–S
Beijing Railway Bureau
20
3180–3193, 5291–5296
Beijing South
Shanghai Railway Group
33
3157–3179, 5297–5306
Hangzhou West
Guangzhou Railway Bureau
7
5281–5287
Guangzhou South
Zhengzhou Railway Group
3
5288–5290
Zhengzhou East
CR400BF–BS
Shanghai Railway Group
5
5276–5280
Shanghai Hongqiao
CR400BF–GS
Harbin Railway Bureau
13
5307–5319
Harbin
CR400BF-J (CR450 Project)
China Railway of Academy Sciences
1
0001
—
Original trainset was 0511 and use a CR400BF-C headtype
CR400BF-J (Inspection Train)
China Railway
1
0003
—
Use a CR400BF-C headtype and equipped with cab side door
CRH-0306
—
1
0306
—
Sleeper EMU test trainset, using CR400BF head type
CR400BF-S
—
1
0001
—
Double-decker EMU test train
Longitudinal sleeper EMU
—
1
—
—
Longitudinal sleeper EMU test trainset using CR400BF-C head
Gallery
CR400BF-B departing
Beijing South railway station to Shanghai Hongqiao railway station
CR400BF-C with a special 2022 Winter Olympics livery
CR400BF-Z with livery of 2022 Asian Games
CR400BF-G-0051 (CRRC Variable Gauge EMU Prototype)
CR400BF-J inspection train
First Class on CR400BF
Second Class on CR400BF
Business Class on CR400BF-GZ features staggered configuration
Premium first class on CR400BF-BS
Premium first class on CR400BF-BS in meeting configuration
Seating sign on CR400BF with booking status indicators: red indicators refer to booked and green for empty.
See also
References
High-speed demonstrative
maglev
Intercity and long-distance
North China Northeast China East China Central and South China Northwest China Southwest China
Intercity railway networks Upgraded lines with operating speeds ≥ 200 km (120 mi)
Italics : under construction or currently not operational
(-), Place A- : section under construction or currently not operational
§: in/related to Hong Kong, Macau, Taiwan
(Place A–Place B): share tracks with other lines
Technologies
High-speed trains by service speed or planned service speed
400 km/h (249 mph) or more 350–399 km/h (217–248 mph) 300–349 km/h (186–217 mph)
Renfe Class 100, 101 , 102 , 103
Alstom AGV
China Railway Hexie CRH2C , 3C , 380A / MTR CRH380A , 380B , 380C , 380D
ETR 500
ETR 400
Eurostar e300 ; e320
ICE 3
KTX-I , Sancheon , Cheongryong
Oaris
PBKA
Shinkansen Series 500 , N700/N700A , N700S , E5/H5 , E6 , E8
AVRIL
TGV Sud-Est (refurbished) , Atlantique , Réseau (PBA), Duplex , POS , 2N2 , M (Avelia Horizon)
TCDD HT80000
THSR 700T
Siemens Velaro
Zefiro 300 , 380
250–299 km/h (155–186 mph)
Avelia Liberty
China Star , DJF2 , China Railway Hexie CRH1A, 1B, 1E , 2A, 2B, 2E, 2G , 3A , 5A, 5E, 5G , China Railway Fuxing CR300AF, CR300BF
ICE 1 , 2 , 4 (ICx)
KTX-Eum
New Pendolino
Renfe Class 120, 121 , 130
Sapsan
SBB RABe 501 , RABe 503
Shinkansen Series 200 , 300 , 700 , 800 , E2 , E3 , E7/W7
TCDD HT65000
TGV Sud-Est (original) , La Poste
V250
Zefiro 250
200–249 km/h (124–155 mph)
Acela
AEM-7
ACS-64
Adelante
APT
China Railway DJJ1 , China Railway Hexie CRH6 , China Railway Fuxing CR200J
ER200
HHP-8
IC4
ICNG
InterCity 125 , 225
ICE T , TD , L (ECx)
Javelin
NSB Class 71 (Flytoget) , 73 , 74 , 78
Pendolino
Railjet
Regina
Shinkansen series 0 , 100 , 400 , E1 , E4
SBB RABDe 500
Re 460
SC-44
SCB-40
X 2000 , SJ X40
Z-TER (Z 21500)
Sokol
British Rail Classes 800 , 801 , 802 , 803 , 805 , 807 , 810
Talgo XXI
Voyager/Meridian
X3
High-speed railway line By countries and territoriesplanned networks in italics
Multiple units of China Railway
Centralized Power
Distributed Power
Pre-CRH era CRH
200-250km/h 350-380km/h Others
Intercity multiple units
CJ-series intercity units CRH intercity EMU
Fuxing EMU
Centralized Power Distributed Power