British Rail Class 700

British Rail Class 700
Desiro City
A Thameslink Class 700 at Bedford in 2024
The standard-class interior of a Class 700 unit
In service20 June 2016 – present[1]
ManufacturerSiemens Mobility[2]
Built atKrefeld, Germany[2]
Family nameDesiro City[2]
Replaced
Constructed2014–2018
Number built115[3]
Formation
Fleet numbers
  • 700/0: 700001–700060
  • 700/1: 700101–700155[3]
Capacity
  • 700/0: 427 seats (52F, 373S) plus 719 standees[3]
  • 700/1: 666 seats (52F, 614S) plus 1088 standees[3]
OwnersCross London Trains[4]
OperatorsThameslink
Depots
Specifications
Car body constructionAluminium
Train length
  • 700/0: 162.0 m (531 ft 6 in)
  • 700/1: 242.6 m (795 ft 11 in)
Car length20.2 m (66 ft 3 in)
Width2.80 m (9 ft 2 in)
Floor height1.10 m (43.31 in)
Doors
  • Double-leaf pocket sliding
  • (2 per side per car)
Wheel diameter820–760 mm (32.28–29.92 in) (new–worn)[5]
Wheelbase
  • Motor bogies: 2,200 mm (87 in)
  • Trailer bogies: 2,100 mm (83 in)[5]
Maximum speed100 mph (160 km/h)
Weight
  • 700/0 total: 278 t (274 long tons; 306 short tons)
  • 700/1 total: 410 t (400 long tons; 450 short tons)
Axle load
  • Motor bogies: 15.5 t (15.3 long tons; 17.1 short tons)
  • Trailer bogies: 14.5 t (14.3 long tons; 16.0 short tons)[5]
Traction systemSiemens IGBT
Power output
  • 700/0: 3,300 kW (4,400 hp)
  • 700/1: 5,000 kW (6,700 hp)
Electric system(s)
Current collector(s)
UIC classification(See § Fleet and formation details)
BogiesSiemens SGP SF7000[5]
Minimum turning radius120 m (390 ft)[5]
Braking system(s)Electro-pneumatic (disc) and regenerative
Safety system(s)
Coupling systemDellner
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Notes/references
Sourced from [6] unless otherwise noted.
The interior of First Class cabin aboard a Thameslink Class 700

The British Rail Class 700 is an electric multiple unit passenger train from the Desiro City family built by Siemens Mobility. It is capable of operating on 25 kV 50 Hz AC from overhead wires or 750 V DC from third rail. 115 trainsets were built between 2014 and 2018, for use on the Thameslink network, as part of the Thameslink Programme in the United Kingdom. As of 2021, they are operated by Govia Thameslink Railway.

In 2011, the consortium Cross London Trains (XLT) consisting of Siemens Project Ventures, 3i Infrastructure, and Innisfree was announced as preferred bidder with Siemens Mobility to manufacture the trains. The decision was politically controversial as the trains were to be built in Germany, while the competing consortium led by Bombardier Transportation had a UK train factory. Both the procurement process and final close of contract were significantly delayed, resulting in the expected first delivery date moving from 2012 to 2016. The £1.6 billion contract to manufacture and provide service depots for the trains was finalised in June 2013. The first train was delivered in late July 2015.

A fleet of 60 eight-car and 55 twelve-car trains[3] entered service between Spring 2016 and 2019. Having replaced Class 319s, 377s, and 387s, Class 700s are the only trains operated on the Thameslink network.[7][8] Each train is able to reach 100 mph (160 km/h) and carry 1,146 passengers in an 8-car train, and 1,754 passengers in a 12-car train. Maintenance depots have been built at Hornsey and Three Bridges.

Procurement

Announcement

The Department for Transport began its procurement process (Thameslink Rolling Stock Project, or Thameslink Rolling stock Programme) on 9 April 2008, with the aim of introducing more passenger capacity on Thameslink lines to match expected demand. In addition, the bidders were to provide depots for vehicle maintenance and storage and finance for the rolling-stock project whereby revenues would be generated from the long-term leasing of rolling stock to the train operating company and associated maintenance payments.[9]

The general specifications included: high reliability, short station dwell times, integrated information technology including passenger information and information for vehicle maintenance, a top speed of 100 mph (160 km/h), and high acceleration and deceleration performance in line with a high-frequency timetable.[note 1] The trains were to be designed for low weight, low track forces, and high energy efficiency. A standard 12-car train was to be about 240 metres (790 ft) long and shorter 8-car trains were limited to 162 metres (531 ft).[9]

The passenger accommodation was to include versions for both "metro" and "commuter" trains,[note 2] based around a 2+2 seating arrangement, with fold-up seats and designed for high levels of standing passengers.[9] Ride quality and noise levels were expected to equal or be better than those of current vehicles and climate control (air-conditioning) was to be fitted.[11] The vehicles were to be fitted for driver-only operation, and to include GSM-R communications radio, as well as AWS, TPWS, and ERTMS level 2 safety systems. The ability to be used in 'Automatic train operation' (ATO) mode, where an on-board computer controls the motors and brakes, was also specified.[11]

Vehicles were to operate on 750 V DC and 25 kV AC electrification systems, with regenerative brakes. Maintenance time was to be reduced by the use of modular components, remote diagnostics, and the avoidance of over-complicated systems.[11] The Department for Transport gave a target of 384 tonnes (378 long tons; 423 short tons) when empty for a 243 m (797 ft) train.[11]

Bids

In July 2008, the Department for Transport shortlisted consortia including Alstom, Bombardier, Hitachi, and Siemens as train builders.[12] The invitations to tender were issued to the four bidders in November 2008.[10]

Hitachi exited the bidding process in April 2009.[13]

In July 2009, Siemens unveiled the Desiro City, a development of design and technology used in its Desiro UK range and the Desiro Mainline range.[14] Development of the design had begun in 2007, with an investment of about £45 million.[2][15]

In September 2009, Alstom unveiled the X'trapolis UK, unusually an articulated vehicle, using 15.6 metre (51 ft) cars, with individual carriages proposed to be supported at one end by a bogie and at the opposite end by a linkage to the next carriage. The shorter vehicle allowed a slightly wider design; the smaller number of bogies was to have resulted in a train approximately 40 tonnes lighter than a conventional design.[16] However, the design would have resulted in a higher axle load. The bid was rejected in October 2009.[17]

Bombardier Transportation offered the Aventra, a design incorporating a development of the FLEXX Eco inside frame bogie with bogie-mounted traction motors.[18]

Both Bombardier's and Siemens' rolling-stock designs were conventional EMUs incorporating inside frame bogies and modern passenger and rolling stock information systems.[2][14][15][18]

Contract decision and financial close

Full size mock-up of the Class 700 at ExCeL

The contract for the order was originally planned to be signed in Summer 2009, with the first vehicles in service by February 2012, and squadron service by 2015.[9] The award of the contract was delayed by the 2010 general election[19] and the subsequent spending review, following which the procurement was announced to be proceeding in late 2010.[20]

On 16 June 2011, Cross London Trains Ltd, a consortium formed by Siemens Project Ventures GmbH, Innisfree Ltd., and 3i Infrastructure Ltd., was named preferred bidder for the PFI contract, and the targeted entry of trains into service was rescheduled to 2015–2018. The vehicles would be manufactured at Siemens' plant in Krefeld, Germany, and maintenance depots were to be built at Hornsey (London) and Three Bridges (Sussex).[2]

The contract was significantly delayed: initially Siemens had hoped to reach agreement in early 2012;[21] by late 2012 commercial close was hoped for by the end of the year, and financial close in early 2013.[22] Key aspects of the commercial contract were reported to have been finalised by December 2012.[23]

As a result of the delays to the procurement, in late 2012, train operating company Southern began procurement of 116 dual-voltage Class 387 EMUs from Bombardier that would be used temporarily on the Thameslink route until 2015; the order contract was finalised in July 2013.[23][24][25][26]

In mid-2013 the National Audit Office (NAO) reported that the contract delay could negatively impact the delivery of the entire Thameslink Programme.[27]

The £1.6 billion contract to finance, supply, and maintain a 1,140-carriage fleet of passenger rolling stock was eventually finalised between the DfT, the supplier Siemens, and the Cross London Trains consortium on 14 June 2013.[28][29][30]

To finance the work, loans were arranged with nineteen banks, with Lloyds, Sumitomo Mitsui Banking Corporation, KfW and BTMU acting as mandated lead arrangers; the European Investment Bank also provided a debt facility. Loans for the construction of the rolling-stock depots were through Siemens Financial Services.[31]

Design and manufacturing

Class 700 powered bogie
Some walk-through coach gangways on the Class 700 offer manually controlled sliding doors to close off certain parts of the train

Development of the new SF7000 bogie began in 2007, with the intention that it would be the UK-market replacement for the preceding Siemens SGP SF5000 model. To reduce energy consumption and track access charges, a key feature of the design was reduced weight: weight-saving design elements included short wheelbase, inboard frames, a bolsterless bogie design, and hollow axles. Total bogie weight is 6.3 tonnes (powered) and 4.4 tonnes (trailer), a reduction of around one third from the SF5000 design.[32][33]

The primary suspension system uses layered rubber, with pneumatic secondary suspension. Motor bogies have a wheelbase of 2,200 mm (87 in), while trailer bogies are 100 mm (3.9 in) shorter. Both variants use wheels of 820 mm (32 in) nominal diameter.[5] Braking is by tread brakes and regenerative braking on motor bogies, and two axle-mounted disc brakes per axle on trailer bogies.[32][34]

Prototypes of the new bogie were completed at Siemens' bogie plant in Graz, Austria in late 2011.[35]

Manufacture of pre-series production trainsets began before formal financial close of the project in mid-2013.[36]

A mock-up of the train was unveiled at the ExCel centre in January 2014, and then displayed at various stations in London and the surrounding area.[37][38]

In March 2014, testing of a twelve-car unit began at the Wegberg-Wildenrath Test and Validation Centre;[36] a completed unit was presented by Siemens in Krefeld, Germany in April 2015.[39]

Introduction into service

The first train arrived in the UK by the end of July 2015, and was delivered to the Three Bridges depot.[40] The first test run on the Brighton Main Line took place in December 2015.[41]

The first train in service was unit 700108 forming the 1002 Brighton to London Bridge service on 20 June 2016. By 18 September 2017, Class 700s replaced all Class 319, 377, and 387 units previously in use on the network.[7][8][42] All units were accepted by Thameslink by summer 2018, and by the end of 2019 all were in passenger service.

The Class 700 fleet, at 60 eight-car and 55 twelve-car units, is over double the size of the old Thameslink fleet. This increase has been used not only to enhance capacity, but also to expand the Thameslink network.

On 6 November 2017, Class 700s started on the Great Northern route with the first, 700128, operating the 0656 Peterborough to London Kings Cross service.[43] The Great Northern route has since been partially incorporated in the Thameslink network after through services through the Canal Tunnels began on 26 February 2018.[44] On this route, Class 700s replaced parts of the Class 365 fleet.

On 11 December 2017, Class 700s took over peak-time services from London Bridge to Littlehampton and weekday-only services from London Bridge to Horsham from Southern with the former starting from Bedford instead of London Bridge.[45][46]

From 21 May 2018, Class 700s also entered service on the new Rainham to Luton service, having replaced the Southeastern Class 465s from Gillingham to London Charing Cross.[47] The Class 465s are now being used to enhance capacity on other routes.

Class 700s are still due to enter service on a planned new service between Cambridge and Maidstone East but a date for this has not yet been confirmed.[48]

Criticism

Procurement

Because the trains were to be built outside the UK, the decision to award the contract to Siemens proved controversial: there was widespread criticism of the UK government's bidding process and perceived lack of support for British manufacturing,[49][50] which in turn led to a review of governmental procurement mechanisms.[51][52][53][54] Additionally, the decision to procure a train with a new bogie design untested in the UK was challenged by several observers at a parliamentary investigation into the train procurement; rival bidder Bombardier already had a proven low-weight bogie.[55]

In 2014, the NAO reported on the Department for Transport's handling of Intercity Express and Thameslink rolling-stock procurement projects. The report questioned the DfT's attempt to take leadership in the project, contrary to general policy, without any prior experience of large-scale rolling stock procurement; the NAO also said the DfT had handled communications with bidders poorly, increasing the likelihood of a legal challenge to its decisions.[56][57]

Interior design

The Class 700 units have been criticised for having fewer seats than those they replaced.[58] There are 666 seats on the twelve-car versions of the Class 700, compared to 714 on a twelve-car formation of a Thameslink Class 377/5 and 807 on a twelve car formation of a Great Northern Class 365. The reduction in the number of seats is intended to provide more standing room on busy trains into Central London, but has been criticised by those who use the trains for longer journeys. There will, however, be more seats overall, as the services will run more frequently.

Additionally, the seats themselves have been criticised for being an uncomfortable shape and having insufficient padding. They are also narrow and positioned close together – another design intended to increase standing space. These poor levels of comfort, along with their tall, thin, tapered appearance, have led them to sometimes be nicknamed "ironing boards";[59] they have also been likened to sitting on concrete.[60]

Thameslink have claimed that the lack of padding was required to meet fire regulations; however, the Rail Safety and Standards Board have claimed that this is untrue, and that it was simply a measure by the DfT to reduce costs.[61]

Upon delivery, the trains were also missing various amenities which were considered standard, including seatback tables and Wi-Fi, which are now being retrofitted to some units.[61] As of April 2023, 58% of Class 700/1 (12 coach) and 23% of Class 700/0 (8 coach) are fitted with Wi-Fi with no plans to extend this further across the fleet.[62]

Fleet and formation details

The new fleet were allocated TOPS classification '700' in 2013.[3] This was divided into subclasses 700/0 for eight-car units and 700/1 for twelve-car units.[23][63]

The first class compartment at the rear of each unit is declassified at all times.[64][65]

In July 2013 Eversholt Rail entered into an agreement with Cross London Trains to provide long-term (22-year) asset management for the fleet of trains.[66]

There are 60 eight-car units and 55 twelve-car units.[67] Each is a fixed length continuously gangwayed vehicle.[3] The initial livery is "light grey with pastel blue doors and a white diagonal flash at the carriage ends".[3]

Subclass Operator Qty. Year built Cars per unit Unit nos. Formation & UIC classification
700/0 Thameslink 60 2014–2018 8 700001–700060
  • DMCO-PTSO-MSO-TSOW-TSOLW-MSO-PTSO-DMCO[68]
  • Bo′Bo′+2′2′+Bo′Bo′+2′2′+2′2′+Bo′Bo′+2′2′+Bo′Bo′[6]
700/1 55 12 700101–700155
  • DMCO-PTSO-MSO-MSO-TSO-TSOW-TSOLW-TSO-MSO-MSO-PTSO-DMCO[68]
  • Bo′Bo′+2′2′+Bo′Bo′+Bo′Bo′+2′2′+2′2′+2′2′+2′2′+Bo′Bo′+Bo′Bo′+2′2′+Bo′Bo′[6]

Illustrations

Illustration of a Thameslink Class 700/0 unit
Illustration of a Thameslink Class 700/1 unit

Special liveries

Unit 700155 in its LGBTQ+ pride "Trainbow" livery
Unit 700111 in its "NHS We Thank You" livery

In July 2019, unit 700155 was wrapped with vinyl trainbow stickers to celebrate LGBT Pride and to mark Brighton's annual pride event.[69]

As of April 2020, unit 700111, alongside Southern unit 377111 and Great Northern unit 717011, has been wrapped with a special NHS appreciation livery to show support for the NHS and the 200,000 essential commuters travelling on Govia Thameslink Railway's network each week during the nationwide lockdown caused by the COVID-19 pandemic.[70]

Named units

Unit 700124 is named Driver Phill Marchant Keeping us moving for more than 12 years[71]

Depots

In 2008, the Department for Transport commissioned a study into the location of depots for the future Thameslink rolling stock: Network Rail preferred two depots based on an expectation that at times the central area of the Thameslink route would be closed for maintenance outside commercial operational hours, with no workable alternative electrified routes available; as a result, depots on either side of the central Thameslink area were required, enabling trains to reach a depot on a nightly basis without passing through central London. A single-depot solution was also investigated, but no suitably large sites were identified for such a facility.[72] Sites were considered at: Wellingborough;[note 3] Hornsey;[note 4] Cricklewood;[note 5] Selhurst;[note 6] Three Bridges;[note 7] and Tonbridge.[73] By late 2008, the sites had been narrowed to Hornsey, Three Bridges and Tonbridge; finally Hornsey and Three Bridges were selected as a two-depot solution.[74]

In August 2009, planning applications for both sites were submitted by Arup acting on behalf of Network Rail.[75][76] However, in December, the Hornsey application was blocked by Secretary of State for Communities and Local Government John Denham on grounds of its scale.[77][78] Potential sites for the northern depot were reassessed and possible options reduced to three: a main depot at Coronation Sidings Hornsey; a main depot adjacent to the existing depot at Hornsey; and a site at Chesterton, Cambridge – a depot reduced in size on the site of the original plan was chosen as the best option for Network Rail.[79] In 2011 revised plans were submitted for both the Hornsey and Three Bridges schemes, with the Hornsey scheme reduced in size and the Three Bridges scheme expanded.[80] In mid-2013, VolkerFitzpatrick was awarded the approximately £150 million contract to build the two depots.[81][82]

The Three Bridges and the Hornsey depots were officially opened in October 2015 and December 2016 respectively.[83][84]

The Three Bridges depot is located 1.5 km south of Three Bridges railway station on either side of the Brighton Main Line.[note 8] The Hornsey depot is located on the east side of the East Coast main line near Hornsey railway station, split between the north-east and the south-east of the station and the A504 road (High Street/Turnpike Lane), the latter being adjacent to the pre-existing depot.[89][note 9]

Accidents and incidents

  • Sixty Thameslink Class 700 and 717 trains failed during disturbances to the National Grid on 9 August 2019 during which the grid frequency fell to 48.914 Hz. Govia Thameslink Railway reported that their Class 700 and Class 717 trains that were operating on AC power were affected by the frequency deviation below 49 Hz. Half were restarted by the drivers but the others required a technician to come out to the train to restart it. Thousands of passengers had their journeys delayed with 371 trains cancelled, 220 part cancelled, and 873 trains delayed. London St Pancras and King's Cross stations had to close for several hours due to overcrowding.[93]
    The DNOs confirmed that no track supplies were lost due to the DNO's Low Frequency Demand Disconnection (LFDD) protection operation.[94] The problem was identified as the recent "Desiro City" software update from Siemens Mobility. Desiro City is the software that enables the train to operate. Siemens Technical Specification for the train states that the train will continue to operate with supply frequency drops down to 48.5 Hz for short periods of time, but that the train drives are permitted to disconnected at or below 49 Hz. However Siemens also state that all trains should have been recoverable via Battery Reset. Instead a Permanent Lockout on the trains followed the protective shutdown caused by a supply voltage frequency drop. Siemens confirmed this lock out should not have occurred and "This was not the intended behaviour of the train."[95] This permanent lock out was due to the recent software update. The trains where the driver recovered them with a battery restart and thus were not affected by the permanent lock out did not yet have the latest version of the software.[citation needed]
    Two large power stations, Hornsea One Ltd (co-owned by Orsted) and Little Barford (operated by RWE) which did not remain connected after the lightning strike have agreed to make a voluntary payment of £4.5 million each into Ofgem's redress fund.[96]
  • On 18 February 2022, during Storm Eunice, unit 700153 collided with a tree obstructing the line at Ifield, West Sussex and was derailed.[97]
  • On 9 June 2023, unit 700042 was derailed at Plumstead.[98]

See also

Notes

  1. ^ Up to 24 trains per hour in central London.[9]
  2. ^ The 240 m long trains were expected to be of "outer-suburban" or "commuter" type, while the 162 m trains were expected to have both "metro" and "suburban" passenger accommodation types.[10]
  3. ^ Including sidings used by GB Railfreight.
  4. ^ Adjacent to the existing Hornsey EMU depot then operated by First Capital Connect.
  5. ^ On development land associated with the planned Brent Cross Thameslink railway station.
  6. ^ On the site of the existing Selhurst Depot used by Southern.
  7. ^ A split site on either side of the main line.
  8. ^ Located in the 'fork' between the Brighton Main Line (L&BR 1841), the Arun Valley line (LB&SCR 1848), and the now-closed Three Bridges–Tunbridge Wells line (EGR 1855),[85] the site had historically been used for railway use, having been unbuilt on prior to railway developments; by 1910 sidings had been built east of the Brighton Main Line, as well as an engine shed and turntable adjacent west of the site;[86] in 2008 the western development area comprised underused sidings and hardstanding with the site east of the mainline including operation sidings, as well as offices; tenants included English Welsh & Scottish Railway, BAM Nuttall, Colas Rail and Balfour Beatty.[87][88]
  9. ^ The northern site, in which the main maintenance building is located, is on rail sidings ('Coronation sidings'/'Hornsey sidings') which had been developed on made embankments from the later 19th century to early 20th century; the southern stabling area was on land that had been extensively developed as railway sidings since the early 20th century.[90][91][92]

References

  1. ^ Scrimshaw, Steve (2 August 2013). "Thameslink on track". The Rail Engineer. Archived from the original on 12 November 2013. Retrieved 8 November 2013.
  2. ^ a b c d e f g "Siemens beats Bombardier to Thameslink train order". Railway Gazette International. London. 16 June 2011. Archived from the original on 19 June 2011. Retrieved 16 June 2011.
  3. ^ a b c d e f g h "First Capital Connect and Siemens reveal further details of Thameslink train order" (Press release). First Capital Connect. 8 August 2013. Archived from the original on 8 November 2013.
  4. ^ Sherratt, Philip, ed. (2023). "ROSCO Fleets". Modern Railways: Review 2023. Stamford: Key Publishing. pp. 18–19. ISBN 978-1-80282-569-5.
  5. ^ a b c d e f SF7000: Bogie-platform for electrical multiple units (PDF) (05/2020 ed.). Graz: Siemens Mobility Austria. Art. No. MORS-B10032-00. Archived (PDF) from the original on 30 September 2020. Retrieved 4 December 2022.
  6. ^ a b c Desiro City Electrical Multiple Unit for Thameslink (PDF) (2014 ed.). Berlin: Siemens Mobility. Archived (PDF) from the original on 29 October 2020. Retrieved 17 January 2022.
  7. ^ a b "GTR completes Class 700 rollout across Thameslink route in the UK – Global Rail News". 19 September 2017. Archived from the original on 1 October 2017. Retrieved 15 October 2017.
  8. ^ a b "Class 700s begin full Thameslink operations". www.railmagazine.com. Archived from the original on 9 July 2021. Retrieved 8 July 2021.
  9. ^ a b c d e Sources:
  10. ^ a b "Thameslink EMU invitations to tender issued". Railway Gazette International. London. 27 November 2008. Archived from the original on 19 July 2011. Retrieved 12 July 2011.
  11. ^ a b c d "Thameslink Rolling Stock Project: Rolling Stock High Level Specification" (PDF). Department for Transport. April 2008. Archived from the original (PDF) on 13 May 2010. Retrieved 12 July 2011.
  12. ^ "Thameslink shortlist announced". Railway Gazette International. London. 10 July 2008. Archived from the original on 24 October 2020. Retrieved 12 July 2011.
  13. ^ "Hitachi drops out of Thameslink competition". Railway Gazette International. London. 22 April 2009. Archived from the original on 21 June 2011. Retrieved 12 July 2011.
  14. ^ a b c "Siemens offers Desiro City to the UK market". Railway Gazette International. London. 17 July 2009. Archived from the original on 21 June 2011. Retrieved 12 July 2011.
  15. ^ a b "Desiro City" (PDF). Siemens. Archived from the original (PDF) on 6 April 2012.
  16. ^ "Alstom unveils X'trapolis UK". Railway Gazette International. London. 16 September 2009. Archived from the original on 24 October 2020. Retrieved 12 July 2011.
  17. ^ "Alstom out of Thameslink bidding". Railway Gazette International. London. 29 October 2009. Archived from the original on 31 October 2009. Retrieved 29 October 2009.
  18. ^ a b Sources:
  19. ^ Jameson, Angela (13 May 2010). "Uncertain future for delayed Thameslink trains". The Times. London. Archived from the original on 11 June 2011. Retrieved 14 September 2010.(subscription required)
  20. ^ "GW electrification and Thameslink fleet approved". Railnews. 25 November 2010. Archived from the original on 27 September 2011. Retrieved 12 July 2011.
  21. ^ Milmo, Dan (5 August 2012). "Thameslink trains order held up, admits Siemens". The Guardian. London. Archived from the original on 4 March 2016. Retrieved 11 December 2016.
  22. ^ "If Siemens can't manage Thameslink, nor can Bombardier". Rail Technology. 2 November 2012. Archived from the original on 29 November 2012. Retrieved 8 November 2013.
  23. ^ a b c Pritchard, Robert (March 2013). "Rolling stock developments since privatisation". Today's Railways. No. 135. p. 31.
  24. ^ "'Key elements' agreed on Siemens Thameslink order". Railnews. 21 December 2012. Archived from the original on 4 March 2013. Retrieved 24 February 2013.
  25. ^ "Department for Transport's boost to train builders" (Press release). Department for Transport. 21 December 2012. Archived from the original on 4 March 2014. Retrieved 23 February 2013.
  26. ^ "Southern selects Bombardier to supply trains for Thameslink cascade". Railway Gazette International. London. 21 July 2013. Archived from the original on 13 November 2013. Retrieved 8 November 2013.
  27. ^ Barrow, Keith (6 June 2013). "Report warns of Thameslink delay risks". International Railway Journal. Archived from the original on 15 October 2017. Retrieved 8 November 2013.
  28. ^ Barrow, Keith (14 June 2013). "Thameslink train contract reaches financial close". International Railway Journal. Archived from the original on 15 September 2013. Retrieved 18 August 2013.
  29. ^ "Department for Transport and Siemens seal Thameslink deal" (PDF) (Press release). Siemens. 27 June 2013. Archived (PDF) from the original on 28 February 2014. Retrieved 8 November 2013.
  30. ^ "Siemens Thameslink deal to create up to 2,000 new jobs" (Press release). Department for Transport. 27 June 2013. Archived from the original on 27 February 2014. Retrieved 8 November 2013.
  31. ^ "Taking stock of Thameslink: captive finance plays a key role in Siemens' record transport deal". European Railway Review. 30 August 2013. Archived from the original on 7 April 2014. Retrieved 8 November 2013.
  32. ^ a b "Bogies for Thameslink". The Rail Engineer. 28 March 2012. Archived from the original on 23 February 2014. Retrieved 18 February 2014.
  33. ^ Küter, Christian (2012). "Design to Value – die Entwicklung des Drehgestells SF 7000". ZEVrail (Glasers Annalen) (in German). 136 (11–12): 420–426.
  34. ^ Fender, Keith (16 March 2012). "Siemens presents new lightweight bogie". International Railway Journal. Archived from the original on 21 February 2014. Retrieved 18 February 2014.
  35. ^ "Siemens manufactures first Thameslink bogie" (PDF) (Press release). Siemens. 21 December 2012. Archived (PDF) from the original on 22 February 2014. Retrieved 18 February 2014.
  36. ^ a b Johnson, Mark (6 May 2015). "Thameslink testing and stabling". Rail Engineer. Archived from the original on 9 May 2015. Retrieved 7 May 2015.
  37. ^ "New Thameslink rolling stock goes on show". Rail Technology Magazine. 28 January 2014. Archived from the original on 22 February 2014. Retrieved 18 February 2014.
  38. ^ "New train roadshow". First Capital Connect. Archived from the original on 23 February 2014.
  39. ^ Fender, Keith (2 April 2014), "Thameslink EMUs to begin mainline testing in August", railjournal.com, archived from the original on 10 April 2015, retrieved 2 April 2015
  40. ^ Briginshaw, David (31 July 2015), "First Siemens Thameslink train arrives in Britain", railjournal.com, archived from the original on 15 October 2017, retrieved 31 July 2015
  41. ^ "New Thameslink train makes successful first-ever test run, to Brighton", thameslinkprogramme.co.uk, 2 December 2015, archived from the original on 8 December 2015, retrieved 4 December 2015
  42. ^ "The almost forgotten cascade". 14 March 2017. Archived from the original on 20 July 2018. Retrieved 20 July 2018.
  43. ^ "Class 700s make Great Northern debut". railmagazine.com. Archived from the original on 1 December 2017. Retrieved 21 November 2017.
  44. ^ "Peterborough and Cambridge joined the Thameslink network". 26 February 2018. Archived from the original on 1 March 2018. Retrieved 28 February 2018.
  45. ^ "Thameslink trains arrive at more West Sussex stations – Littlehampton Gazette". 12 December 2017. Archived from the original on 17 December 2017. Retrieved 16 December 2017.
  46. ^ New timetables available to download here Archived 22 July 2018 at the Wayback Machine (London and East Grinstead, Horsham, Brighton and Littlehampton timetable)
  47. ^ "Thameslink taking over Southeastern routes". Archived from the original on 23 February 2019. Retrieved 1 June 2018.
  48. ^ "Thameslink Core tph update_May14_v7" (PDF). Archived (PDF) from the original on 26 August 2014. Retrieved 15 October 2017.
  49. ^ Milmo, Dan (17 August 2011). "Wheel of fortune turns in Derby". The Guardian. London. Archived from the original on 12 March 2016. Retrieved 11 December 2016.
  50. ^ "Thameslink setback could put Bombardier future at risk". BBC News. 16 June 2011. Archived from the original on 30 November 2017. Retrieved 21 July 2018.
  51. ^ "Crossrail delay for train procurement rethink". Railnews. 30 August 2011. Archived from the original on 22 February 2014. Retrieved 30 August 2011.
  52. ^ Milmo, Dan (29 August 2011). "Crossrail delays competition for £16bn train manufacturing contract". The Guardian. London. Archived from the original on 9 March 2016. Retrieved 11 December 2016.
  53. ^ Albert, Angeline (30 August 2011). "Crossrail delays train procurement pending buying review". Supply Management. Archived from the original on 3 October 2011. Retrieved 30 August 2011.
  54. ^ Leach, Adam (5 July 2011). "Government aims to increase support for UK train makers". Supply Management. Archived from the original on 3 October 2011. Retrieved 30 August 2011.
  55. ^ Thameslink rolling stock procurement: eleventh report of session 2010–12 (Report). Vol. 1: Report, together with formal minutes, oral and written evidence. The Stationery Office. 2011. "The bogie", pp.15–16; Ev 6, Q33; Ev 13, Q98.
  56. ^ Report by the Comptroller and Auditor General – Department for Transport – Procuring new trains (PDF), National Audit Office, 9 July 2014, Summary: § 7, 15, pp.6, 8, archived (PDF) from the original on 15 July 2014, retrieved 14 July 2014
  57. ^ Topham, Gwyn (9 July 2014). "Train contracts may not be best value, says National Audit Office". The Guardian. London. Archived from the original on 5 September 2016. Retrieved 11 December 2016.
  58. ^ "Only two in five passengers will get seats on new London commuter train". London Evening Standard. 20 October 2014. Archived from the original on 22 July 2018. Retrieved 5 April 2018.
  59. ^ Train companies claim uncomfortable 'ironing board' seats are due to strict Government regulations Archived 28 February 2018 at the Wayback Machine The Telegraph 18 February 2018
  60. ^ Thameslink passengers left in pain by trains’ ‘concrete’ seats Archived 19 February 2018 at the Wayback Machine The Times 18 February 2018
  61. ^ a b "FROM THE ARCHIVES: Are you sitting comfortably?". www.railmagazine.com. Archived from the original on 27 May 2019. Retrieved 7 March 2021.
  62. ^ @TLRailUK (4 April 2023). "Tweet from Thameslink confirming wi-fi status on trains" (Tweet). Retrieved 3 October 2023 – via Twitter. ...just as a correction to this information. 58% of class 700/1 (12 coach) are fitted with Wi-Fi and 23% of class 700/0 (8 coach) are fitted with Wi-Fi.
  63. ^ Pritchard & Hall 2014, pp. 336, 339.
  64. ^ "First Class". ThamesLink. Govia. Archived from the original on 16 July 2020. Retrieved 12 June 2020.
  65. ^ Rose, Eleanor (19 March 2018). "Train hack lets you sit in declassified first-class carriage at rear of Thameslink service". Evening Standard. Archived from the original on 12 June 2020. Retrieved 12 June 2020.
  66. ^ "Eversholt wins contract for new Siemens Thameslink trains". Modern Railways. 3 July 2013. Archived from the original on 26 December 2015. Retrieved 8 November 2013.
  67. ^ Pritchard & Hall 2014, pp. 336, 339, 341.
  68. ^ a b Pritchard & Hall 2014, p. 336.
  69. ^ "This train has been given a rainbow makeover for Brighton Pride". The Independent. 18 July 2019. Retrieved 14 May 2024.
  70. ^ Clinnick, Richard (20 April 2020). "Govia Thameslink Railway rebrands trains to show support for NHS". Rail Magazine. Archived from the original on 29 July 2020. Retrieved 22 April 2020.
  71. ^ Butlin, Ashley (October 2024). "Multiplie Units". Stock Update. The Railway Magazine. Vol. 170, no. 1483. p. 89.
  72. ^ Network Rail & ARUP 2009, Planning Statement, 2.2. pp.5–6.
  73. ^ Network Rail & ARUP 2009, Planning Statement, 2.2.2. pp.5–8.
  74. ^ Network Rail & ARUP 2009, Planning Statement: 2.2.3–2.25, pp.8–10.
  75. ^ Network Rail & ARUP 2009.
  76. ^ Network Rail & ARUP 2009a.
  77. ^ Pears, Elizabeth (8 December 2009). "Brakes pulled on Hornsey train depot development". Haringey Independent. Archived from the original on 22 February 2014.
  78. ^ "Rail depot plans thrown out". Hampstead & Highgate Express. 10 December 2009. Archived from the original on 21 February 2014. Retrieved 18 February 2014.
  79. ^ Network Rail & ARUP 2011a, (REP-PL-HOR-001A) Planning Statement (Part C) Northern Depot Site Assessment Study.
  80. ^ "Thameslink depot size halved after local objections". Transport Briefing. 25 January 2011. Archived from the original on 22 February 2014.
  81. ^ "Two depots designed for Desiro City fleet". Railway Gazette. 14 August 2013. Archived from the original on 11 October 2013. Retrieved 8 November 2013.
  82. ^ Morby, Aaron (11 July 2013). "VolkerFitzpatrick wins Thameslink train depots". Construction Enquirer. Archived from the original on 14 September 2013. Retrieved 8 November 2013.
  83. ^ "Predictive maintenance at the heart of Thameslink EMU depot", railwaygazette.com, 15 October 2015, archived from the original on 16 October 2015, retrieved 15 October 2015
  84. ^ Hewitt, Sam (27 January 2017). "Siemens' Hornsey depot opens – Rail Express". Archived from the original on 25 October 2020. Retrieved 14 February 2021.
  85. ^ Network Rail & ARUP 2009, Design and Access Statement. 3.1 p.6.
  86. ^ Ordnance Survey. 1:2500. 1873–4, 1897, 1910
  87. ^ Network Rail & ARUP 2009, Planning Statement ,3.1.1–3.1.3. p.14.
  88. ^ Network Rail & ARUP 2009, Environmental Statement (non-technical summary). 3. p.5.
  89. ^ Network Rail & ARUP 2009a, Drawing 240809_22 Hornsey Site Plan, 1:1000, 207670-00 HOR-GX-201.
  90. ^ Ordnance Survey. 1:2500. 1863, 1896, 1914, 1935
  91. ^ Network Rail & ARUP 2009a, Cultural Heritage Baseline Information (Appendix D.) D7-D10.
  92. ^ Network Rail & ARUP 2009a, Environmental Statement (REP-PL-HOR-0005). 3.1, p.12.
  93. ^ "Interim Report into the Low Frequency Demand Disconnection (LFDD) following Generator Trips and Frequency Excursion on 9 Aug 2019". 16 August 2019. Archived from the original on 20 August 2019. Retrieved 25 August 2019.
  94. ^ "Technical Report on the events of 9 August 2019". 16 September 2019. Archived from the original on 6 October 2019. Retrieved 27 January 2020. Govia Thameslink Railway in Appendix F "Govia Thameslink Railway (GTR) technical report" of the National Grids ESO report. "Appendices to the Technical Report on the events of 9 August 2019". 16 September 2019. Archived from the original on 6 October 2019. Retrieved 27 January 2020.
  95. ^ "Archived copy". Archived from the original on 6 October 2019. Retrieved 27 January 2020.{{cite web}}: CS1 maint: archived copy as title (link)
  96. ^ "Companies pay £10.5 million over 9 August power cut". 3 January 2020. Archived from the original on 27 January 2020. Retrieved 27 January 2020.
  97. ^ Network Rail Kent & Sussex [@NetworkRailSE] (18 February 2022). "Update" (Tweet) – via Twitter.
  98. ^ Network Rail Kent & Sussex [@NetworkRailSE] (9 June 2023). "If you look closely, you can see the train isn't sitting correctly on the rails and became stuck, blocking the North Kent lines in both directions between Charlton and Slade Green. /2" (Tweet) – via Twitter.

Sources

Further reading

Read other articles:

Inakappe Taisho (い な か っ ぺ 大将?, atau The Funny Judo Champion) adalah sebuah manga seri yang digarap oleh Noboru Kawasaki dan serial oleh Shogakukan di Shogakukan no Gakushū Zasshi. Manga ini memenangkan 14 Shogakukan Manga Award. Sebuah adaptasi anime diciptakan oleh Tatsunoko Production pada tahun 1970 dengan tanggal penayangan 4 Oktober 1970 sampai 24 September 1972 dengan jumlah episode mencapai 104 (dihitung 2 segment per-episode). Di Indonesia sendiri, versi animenya tayan...

 

Artikel ini sebatang kara, artinya tidak ada artikel lain yang memiliki pranala balik ke halaman ini.Bantulah menambah pranala ke artikel ini dari artikel yang berhubungan atau coba peralatan pencari pranala.Tag ini diberikan pada November 2022. Géza BalkayLahir(1952-09-05)5 September 1952Budapest, HungariaMeninggal3 April 2006(2006-04-03) (umur 53)PekerjaanPemeranTahun aktif1976-2006 Géza Balkay (5 September 1952 – 3 April 2006) adalah seorang pemeran televisi dan...

 

Artikel ini sebatang kara, artinya tidak ada artikel lain yang memiliki pranala balik ke halaman ini.Bantulah menambah pranala ke artikel ini dari artikel yang berhubungan atau coba peralatan pencari pranala.Tag ini diberikan pada April 2016. Fyord Tryne adalah sebuah fyord berbentuk tidak tetap yang menjadi sisi utara Semenanjung Langnes di Perbukitan Vestfold. Fyord ini dipetakan dan diberi nama Tryne Fjord (fyord bengkok) oleh Ekspedisi Lars Christensen 1936-37.  Artikel ini berisi...

Asociación Amateurs de FootballArgentinaFounded22 September 1919[1]Folded28 November 1926; 97 years ago (1926-11-28)[1]HeadquartersBuenos AiresFIFA affiliationNoPresidentJuan Mignaburu (1919) A. Beccar Varela (1920–26) The Asociación Amateurs de Football (AAmF) was a dissident football association of Argentina that organised its own championships from 1919 to 1926. The Argentine Football Association did not recognise those championships until both associ...

 

A decision based design structure, which spans the areas of engineering design, design rationale and decision analysis Information mapping Topics and fields Business decision mapping Data visualization Graphic communication Infographics Information design Knowledge visualization Mental model Morphological analysis Ontology (information science) Schema (psychology) Visual analytics Visual language Node–link approaches Argument map Cladistics Cognitive map Concept lattice Concept map Conceptu...

 

سندرلاند   الاسم الرسمي (بالإنجليزية: Sunderland)‏  الإحداثيات 54°54′00″N 1°22′49″W / 54.9°N 1.3802777777778°W / 54.9; -1.3802777777778   تقسيم إداري  البلد المملكة المتحدة[1]  خصائص جغرافية  المساحة 111.84 كيلومتر مربع  ارتفاع 60 متر  عدد السكان  عدد السكان 277417 (2018)[2&...

Phoenix Raceway Anciens noms Phoenix International Raceway (1964-2014, 2016-2017) Jeff Gordon Raceway (2015) Phoenix Raceway (2017, depuis 2020) ISM Raceway (2018-2020) Caractéristiques générales Lieu 7602 S Avondale BoulevardAvondale, Arizona 85323 États-Unis Coordonnées 33° 22′ 29″ nord, 112° 18′ 40″ ouest Géolocalisation sur la carte : Arizona localisation Géolocalisation sur la carte : États-Unis localisation Construction 1964 Pro...

 

Lower and back region of the hip bone This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Ischium – news · newspapers · books · scholar · JSTOR (April 2009) (Learn how and when to remove this template message) Ischium of pelvisPelvic girdleLeft hip-joint, opened by removing the floor of the acetabulum from withi...

 

Ruby RoseRose pada 2012LahirRuby Rose Langenheim20 Maret 1986 (umur 38)Melbourne, Victoria, AustraliaPekerjaanTelevision presenter, DJ, aktris, model, VJTahun aktif2002–sekarangSitus webrubyroseofficial.com Ruby Rose Langenheim (lahir 20 Maret 1986), lebih dikenal sebagai Ruby Rose, adalah seorang model, DJ, artis rekaman, aktris, presenter televisi, dan mantan MTV VJ asal Australia.[1] Rose muncul pertama kali di media arus utama sebagai presenter di MTV Australia. Ia ke...

SassoniMappa che mostra il territorio europeo dei sassoni, circondato dai fiumi Weser, Eider ed Elba. Fonte: Freeman's Historical Geographys. SottogruppiAnglo-sassoni PeriodoIII - XII secolo LinguaSassone antico Manuale I Sassoni erano un popolo germanico, insediato principalmente negli odierni stati tedeschi di Schleswig-Holstein, della Bassa Sassonia, della Sassonia-Anhalt, della Renania Settentrionale-Vestfalia e nella parte nord dei Paesi Bassi (Twente e Achterhoek). Il loro nome sig...

 

Pemilihan kepala daerah (Pilkada atau Pemilihan kepala daerah) di Indonesia adalah dilakukan secara langsung oleh penduduk daerah administratif lokal yang memenuhi syarat calon. Pemilihan kepala daerah dilakukan satu paket bersama dengan wakil kepala daerah. Kepala daerah dan wakil kepala daerah yang dimaksud mencakup: Gubernur dan wakil gubernur untuk provinsi Bupati dan wakil bupati untuk kabupaten Wali kota dan wakil wali kota untuk kota Sejarah dahulu sebelum tahun 2005 kepala daerah dan ...

 

Mexican-born American chemist (1901–1981) Henry EyringHenry Eyring in 1951Born(1901-02-20)February 20, 1901Colonia Juárez, Chihuahua, MexicoDiedDecember 26, 1981(1981-12-26) (aged 80)Salt Lake City, Utah, United StatesNationalityAmericanAlma materUniversity of ArizonaUniversity of California, BerkeleyKnown forTransition state theorySpouse(s)Mildred Bennion; Winifred BrennanChildren3, including Henry B. EyringAwardsWolf Prize in Chemistry (1980) Priestley Medal (1975) Elliott...

此條目需要补充更多来源。 (2021年7月4日)请协助補充多方面可靠来源以改善这篇条目,无法查证的内容可能會因為异议提出而被移除。致使用者:请搜索一下条目的标题(来源搜索:美国众议院 — 网页、新闻、书籍、学术、图像),以检查网络上是否存在该主题的更多可靠来源(判定指引)。 美國眾議院 United States House of Representatives第118届美国国会众议院徽章 众议院旗...

 

This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Judiciary of Chile – news · newspapers · books · scholar · JSTOR (December 2013) (Learn how and when to remove this message) Politics of Chile Executive President (list) Gabriel Boric Ministries National Congress Senate Chamber of Deputies Judiciary Supreme Cou...

 

Geórgios MerkoúrisFonctionsMinistre de l'Économie nationaleMinistre de l'AlimentationDéputéCirconscription d'Attique-Béotie (d)BiographieNaissance 1886AthènesDécès Décembre 1943AthènesNom dans la langue maternelle Γεώργιος ΜερκούρηςNationalité grecqueFormation Université nationale et capodistrienne d'AthènesActivités Homme politique, juristePère Spyrídon MerkoúrisFratrie Stamátis Merkoúris (en)Parentèle Melina Mercouri (nièce)Spyros Mercouris (d) &#...

Governor's House Historic view of Governor's House Governor's House is a building situated on the southernmost spur of Calton Hill, beside the south-east corner of Old Calton Burial Ground, in Edinburgh, Scotland. It looks out over Waverley Station, the Canongate and Holyrood Park to the south. The building of 1815–17 is all that remains of Calton Jail, once the largest prison in Scotland, completed in 1817.[1] It was designed by Archibald Elliot (1761-1823) who was also responsibl...

 

Province of Bulgaria 42°41′N 26°21′E / 42.683°N 26.350°E / 42.683; 26.350 Province in BulgariaSliven Province Област СливенProvinceSliven Province FlagLocation of Sliven Province in BulgariaCountryBulgariaCapitalSlivenMunicipalities4Government • GovernorChavdar BozhourskiArea[1] • Total3,544.1 km2 (1,368.4 sq mi)Population (December 2022)[2] • Total170,583 • Density4...

 

Women's freestyle 59 kg at the 2007 World ChampionshipsVenueHeydar Aliyev Sports and Concert ComplexDates22 September 2007Competitors20 from 20 nationsMedalists  Audrey Prieto   France Stéphanie Groß   Germany Dorjiin Narmandakh   Mongolia Nataliya Synyshyn   Ukraine← 20062008 → 2007 World Wrestling ChampionshipsFreestyleGreco-RomanWomen55 kg55 kg48 kg60 kg60 kg51 kg66 kg66 kg55 kg74 kg74 ...

In Greek mythology, a pair of mischievous forest creatures For the epic poem attributed to Homer, see Cercopes (epic poem). For the ancient city in Crete, see Olous. Heracles and the Cercopes (Metope in Paestum). In Greek mythology, the Cercopes /sərˈkoʊˌpiːz/ (Greek: Κέρκωπες, plural of Κέρκωψ, from κέρκος (n.) kerkos tail)[1] were mischievous forest creatures who lived in Thermopylae or on Euboea but roamed the world and might turn up anywhere mischief was a...

 

Music streaming service by Apple Inc. This article is about the Apple streaming service. For the media player app from Apple, see Music (Apple). For the unrelated record label, see Apple Records. Apple MusicDeveloperApple Inc.Key peopleOliver Schusser (VP, Apple Music & International Content)Brian Bumbery (director, Apple Music Publicity)Launch dateJune 30, 2015; 9 years ago (2015-06-30)Platform(s) List of platforms macOS iOS iPadOS tvOS watchOS CarPlay HomePod visionOS ...