145 Class 720 units were ordered in the five car configuration only; these are to be operated across multiple suburban lines leading out of both London Liverpool Street (Greater Anglia and c2c) and London Fenchurch Street (c2c).[14] Originally intended to be introduced during 2019, delays were encountered during development that minorly impacted this timetable. On 26 November 2020, Greater Anglia commenced the Class 720's introduction. Its initial operations were centred on the London Liverpool Street to Southend Line.[14] All Greater Anglia units were intended to be in service by the summer of 2020.[13] c2c's fleet entered service on 27 September 2023.[15]
Description
The Class 720 is a member of rolling stock manufacturer Bombardier's Aventra family of multiple units, having been developed from the company's successful line of Electrostarelectric multiple units (EMUs).[13] In comparison to the preceding Electrostar, with which it shares numerous elements, the Class 720 is a considerably lighter vehicle, and features longer carriages: a ten-car Class 720 train is approximately the same length as a 12-car Class 360 train, the ten-car Class 720 has a tare weight of 386tonnes in contrast to the 516tonnes of the 12-car Class 360 train, while providing considerably more seating.[13]
Each car has a length of 24 m (79 ft), the bodyshell of which is composed of aluminium, the assembly of which using both welding and bolting techniques.[13] The Class 720 has a maximum speed of 100 mph (160 km/h), possessing a starting tractive effort per motor of 21.6 kN (4,900 lbf) and a peak traction power at the wheel of 2,300 kW (3,100 hp) per unit to achieve its maximum rate of acceleration of 0.8 m/s2 (1.8 mph/s). The driver is seated in a central position within the forward cab; a second seat is provided for an observer/instructor.[13]
All Class 720 orders as at October 2022 have been delivered in five-car configuration. The units have a length of 122 m (400 ft) and accommodate up to 540 seated passengers in a standard-class seating configuration. As of October 2022, no operator has chosen to configure their Class 720 fleets with first class accommodation.[16]
The interior of Class 720 features a 3+2 seating arrangement. These seats are intentionally cantilevered above the floor to provide greater under-seat space for storing personal luggage as well as to ease cleaning.[17] Furthermore, various amenities are present for the convenience and comfort of the travelling public. Each car benefits from air conditioning throughout, while numerous passenger information systems, displaying passenger loading indicators among other information, are present across each carriage's interior.[14] Every seat is provided with its own seat-back table and power sockets, while on-train Wi-Fi enables online connectivity throughout the journey. Onboard toilet facilities are also present.[14] Akin to trains operated by the London Overground, the Class 720s have through gangways to encourage passengers to spread out across the train.[14] The interior is also fully compliant with the Technical Specification for Interoperability for Persons of Reduced Mobility, featuring dedicated spaces for wheelchairs, as well as spaces for bicycles. One of the two toilets present in a five-car formation is also outfitted for greater accessibility.[13]
In September 2017, Greater Anglia unveiled an early mockup of the interior intended to be fitted to the Class 720 fleet. This was used as part of a consultation that solicited 1,000 responses from members of the public. Numerous changes were subsequently made to the interior. Alterations included the replacement of the originally intended Fainsa seating with softer seating supplied by Kiel, as well as the addition of seat back tables.[14] The units also featured underfloor heating, eliminating the need for the bodyside heaters and thus increasing floorspace for more passengers.[13] This heating arrangement was allegedly the first use amongst any train on the British railway system.[citation needed]
History
Greater Anglia
In August 2016, Greater Anglia was awarded the East Anglia franchise with a commitment to replace all of the existing fleet. As part of this, an order was placed with Bombardier for 111 electric multiple units that were members of the recently launched Aventra family.[18][19] These new trains were designated as the Class 720 and were originally planned to be divided into two sub-classes; 89 five-carriage 720/5 units and 22 ten-carriage 720/1 units.[20] However, during October 2020, Greater Anglia amended its order to convert all 22 ten-car units into a further 44 five-car units, stating that this delivered increased flexibility within the originally-ordered total of 665 vehicles.[21]
The Class 720 is a replacement for a diverse range of units, including the Class 317 and Class 321 units, together with the more modern Class 360 and Class 379 fleets that has been long used on outer-suburban services on the West Anglia and Great Eastern Main Lines.[20] The Class 720s are constructed at Bombardier's Derby Litchurch Lane Works.[22] The order has been financed by the rolling stock companyAngel Trains.[23][24] The introduction of the fleet has been accompanied by a roughly £300million investment in new and refurbished infrastructure, affecting depots, sidings, and stations, to best accommodate the new trains.[13]
c2c
In December 2017, c2c announced it had reached an agreement with rolling stock financiers Porterbrook and manufacturer Bombardier to procure 60 vehicles of the latter's Aventra family—formed into six 10-car trains—with the intention that they would enter service in 2021.[25] The order was subsequently amended to comprise twelve 5-car trains.[26] These will be numbered in subclass 720/6, following an earlier expectation that they would be designated Class 711.[27][28][29]
Operation
Greater Anglia
Production of the first unit for Greater Anglia began in February 2018 and was completed in September 2018.[30][31]
Early on, it had been intended for the type to enter service during 2019, but the fleet's introduction had to postponed into the following year due to software issues with the onboard Train Control Management System (TCMS).[13][32] Testing of the first unit commenced on 17 March 2020, on the London Liverpool Street to Southend line.[33]
Both the testing and production programmes were impacted by the COVID-19 pandemic that took hold during 2020. On 8 June 2020, operational use of the Class 720 was formally authorised by the Office of Rail and Road (ORR).[13]
On 26 November 2020, the first two units started passenger service on the London Liverpool Street to Southend line.[34]
On 16 December 2020, they started service on the Braintree branch,[35] and on 23 December 2020, the Class 720s were rolled out on Southminster services.[36]
In February 2021, it was reported that driver training had begun for their introduction to the Cambridge route.[37] That same month, Ian McConnell, Greater Anglia's franchise and programmes director, noted that the Class 720 was already running relatively well and free of any meaningful technical issues, with challenges with the onboard software issues being the chief concern with the type's deployment at that point.[13]
According to railway industry periodical Rail Engineer, Greater Anglia intend to gradually extend the new fleet's usage to eventually cover all of the Great Eastern routes in Essex and through to Ipswich during the first half of 2021, while the Class 720 would be introduced to the west Anglia route between Liverpool Street and Cambridge in the second half of the year.[13]
On 23 March 2021, the 720s were introduced on the Liverpool Street to Clacton, Colchester Town and Ipswich services.[38]
On 25 August 2021, Class 720s entered service on the West Anglia mainline and Hertford East branch.[39] On 13 September 2021, the 720s started services to Harwich Town and Walton-on-the-Naze.[40]
c2c
In December 2017, c2c announced an order with Porterbrook for six ten-car Class 720/6 Aventra electric multiple units. The new units are scheduled for delivery between mid and late 2021, meaning they will all be in service three years earlier than the initial planned phased introduction period.[41] The first 720/6 was delivered to c2c on 19 April 2022, and the fleet was due to enter service in 2022.[42][non-primary source needed]
The order was later changed to 12 5-car units. These new units were planned to replace the allocation of six four-car Class 387 units, which c2c was operating on a short-term lease.
On 6 October 2022, the Southend Echo newspaper quoted a c2c spokesperson as saying that "Our 720 class trains are currently undergoing rigorous testing. We will update our customers as soon as we have more information as to when they will be entering passenger service on the c2c route”.[43] In March 2023, c2c's managing director confirmed in an interview that it was planned that the Class 720s would enter service later that year.[44]
On 2 June 2023, it was reported that the new trains would come into passenger service in September.[45] The first c2c 720s duly entered service on 27 September 2023.[15]
Fleet details
The units resemble the Class 345 and Class 710 built for Crossrail and London Overground respectively. However, owing to the services that they operate, the Class 720s have a higher top speed of 100 mph (161 km/h), and have significantly more seats per carriage (and less standing space).