Alexander Wittek, who worked on the project in 1892 and 1893, fell ill and died in 1894 in Graz, and the work was completed by Ćiril Iveković. The edifice was built in a stylistic blend of historical eclecticism, predominantly in the pseudo-Moorish, also known as Moorish Revival, expression, for which the stylistic sources were found in the Islamic art of Spain and North Africa.[citation needed]
Building works began in 1892 and were completed in 1894, at a cost of 984,000 crowns, with 32,000 crowns provided for fixtures and fittings. It was formally opened 20 April 1896, and handed over to the City Authority.
On 25 August 1992, Serb shelling during the Siege of Sarajevo caused the complete destruction of the library; among the losses were about 700 manuscripts and incunabula and a unique collection of Bosnian serial publications, some from the middle of the 19th century Bosnian cultural revival.[5] Before the attack, the library held 1.5 million volumes and over 155,000 rare books and manuscripts.[6] Some citizens and librarians tried to save some books while they were under sniper fire, at least one person died.[6]
The majority of the books could not be saved from the flames. The structural repair of the building was planned to be carried out in four stages: 1996 and 1997 (financed by a donation from the Austrian state), and 2000 through 2004 (financed by a donation from the European Commission), and the city of Barcelona among others. The third stage ended in September 2012, with an estimated cost of KM 4.6 million (about €2.37 million) and returned the city hall to its former grace. The fourth stage began following the completion of the third stage and lasted about 20 months, finishing at the end of 2013 and cost of KM 14 million (about €7.23 million) which are secured through the IPA. In this stage the entire interior of the building was rebuilt and reconstructed (paintings, sculptures, books), resulting in the library being brought back to its pre-war condition. Everything that was possible to restore has been done so, while those things that were not possible to save have been made anew through special molds. The whole reconstruction and restoration process was predicted to cost about KM 25 million (about €13 million).[citation needed]
After it was repaired, the building, now a national monument, has been used for variety of events. Its space has been be used for various protocol events for all levels of government, concerts and exhibitions.[7]
Renewal
After years of restoration, the building was reopened on 9 May 2014, with the performance of the Sarajevo Philharmonic Orchestra and Vedran Smailović,[8] as well as a 3D projection video mapping by Knap Studio Sarajevo.[9] In 2022, it was the subject of a stop-motion animated film directed by artist Nicholas F. Callaway, through the research project Imaneo, with funding from Creative Europe.[10]
Interior after restoration.
Stained-glass ceiling, interior after restoration.
^For foreigners an event that defined the cultural objectives of the besiegers occurred during the night of August 25, 1992, the intentional shelling and utter destruction with incendiary shells of the irreplaceable Bosnia National and University Library, the central repository of Bosnian written culture, and a major cultural center of all the Balkans. Among the losses were about 700 manuscripts and incunabula and a unique collection of Bosnian serial publications, some from the middle of the 19th century Bosnian cultural revival. Libraries all over the world cooperated afterwards to restore some of the lost heritage, through donations and e-texts, rebuilding the Library in cyberspace.
Hartmann, Kristen M. (2016-02-08). "Fragmentation and forgetting: Sarajevo's Vijećnica". International Journal of Heritage Studies. 22 (4): 312–324. doi:10.1080/13527258.2016.1138317. S2CID147472375.