All trains stop at all stations. Most trains operate throughout the line, although during the morning hours, some services terminate at Shin-Tsudanuma. In mornings and nights some trains originate or terminate at Kunugiyama.
Services operate at a frequency of one train every 4 minutes in the morning peak, every 10 minutes during the day, and every 8 minutes in the evening peak. During the daytime, Shin-Keisei runs alternate through trains to Chiba-Chūō on the Keisei Chiba Line.
Shin-Keisei 8000 series in revised livery in April 2017
History
The line was originally opened in 1929 with a track gauge of 1,067 mm (3 ft 6 in) for army training purposes, and ceased to be used in 1945.[citation needed]
The line was transferred to the Shin-Keisei Railway, which reopened and electrified at 1,500 V DC (overhead) the first section of the line, 2.5 km (1.6 mi) from Shin-Tsudanuma to Yakuendai, on 27 December 1947.[3] The Yukuendai–Takifudo section was reopened in 1948, and extended to Hatsutomi the following year.[citation needed]
The reopened sections were regauged to 1,372 mm (4 ft 6 in) in October 1953, and the entire line was reopened as a single-track line by 21 April 1955.[3] In August 1959, the line was again regauged, this time to 1,435 mm (4 ft 8+1⁄2 in) to match the standard gauge used by Keisei Electric Railway.[3]
Future plans
On 31 October 2023, it was announced that the Shin-Keisei Line would be merged into the Keisei Electric Railway and renamed to the Matsudo Line (松戸線, Matsudo-sen). The move is expected to be completed by April 2025.[4][5][6]
References
^歴史年表2000年 - 2009年 [Chronology 2000 - 2009]. Official website (in Japanese). Japan: Shin-Keisei Electric Railway. 2009. Retrieved 6 August 2013.
^ ab新京成電鉄80000形、新造車両1編成を11/2導入 - 8000形は全車引退 [Shin-Keisei 80000 series, 1 new set introduced on 2 November - All 8000 series retired] (in Japanese). Japan: Mynavi News. 2021. Retrieved 2 November 2021.
^ abcTerada, Hirokazu (19 January 2013). データブック日本の私鉄 [Databook: Japan's Private Railways]. Japan: Neko Publishing. p. 49. ISBN978-4-7770-1336-4.
^"京成電鉄、新京成電鉄を吸収合併へ2025年4月 現在の路線・駅は維持する方針" [Keisei Electric Railway will absorb the Shin-Keisei Electric Railway in April 2025; Plans made to maintain current routes and stations]. Chiba Nippo (in Japanese). 31 October 2023. Archived from the original on 31 October 2023. Retrieved 31 October 2023.
^"新京成電鉄、解散・消滅へ - 京成電鉄が吸収合併、2025年実施予定" [Shin-Keisei Electric Railway to dissolve and disappear - Keisei Electric Railway will absorb the railway in the merger, scheduled to take place in 2025]. MyNavi Corporation (in Japanese). 31 October 2023. Archived from the original on 31 October 2023. Retrieved 31 October 2023.
^Kinoshita, Kenji (2024-06-25). 新京成電鉄を吸収合併、京成電鉄「松戸線」に - 車両カラー変更へ [Merger with Shin-Keisei Electric Railway to form Keisei Electric Railway "Matsudo Line" - Change of train livery]. Mynavi News (in Japanese). Retrieved 2024-06-26.