A rebuilt four-car 651 series resort train set named Izu Craile(Japanese: 伊豆クレイル) entered service on the Ito Line in the summer of 2016. The name is a portmanteau formed from "Cresciuto" (Italian for "mature"), "train", and the suffix "-ile". Car 1 had window-facing counter seats on the seaward side, car 2 had a bar counter and lounge, car 3 had semi-open compartments, and car 4 had conventional unidirectional 2+2-abreast seating.[1] The service ran until June 28, 2020, as JR East decided that with the introduction of Saphir Odoriko services, the Izu Craile service would be surplus to requirements.
Train service
Most of the local trains are only run between Atami Station and Izukyū Shimoda station via Izu Kyūkō Line.
A few local trains with Green Cars departing from Itō Station enter the Tokaido Main Line, with most of them entering the Ueno-Tokyo Line, and the farthest terminals are Utsunomiya Station or Kagohara Station. As such, Itō Station is the most southern terminal of the Ueno-Tokyo Line.
History
Initial plans called for the Japanese National Railways (JNR) to build a spur line linking Atami on the Tokaido Main Line with Shimoda. However, funding was limited in the 1930s due to a combination of a tight fiscal policy under Prime MinisterOsachi Hamaguchi during the Great Depression, and a number of technical issues. The projected route of the Itō line along the mountainous east coast of the Izu Peninsula required numerous tunnels and bridges. Workers digging a tunnel near Usami encountered problems with underground hot springs, similar to that experienced in the construction of the Tanna Tunnel, which had recently been completed years later than originally projected and far over budget.
On March 30, 1935, the initial 8.7 km section of the Itō Line linking Atami with Ajiro was opened. The second (8.3 km) section from Ajiro to Itō was opened on December 15, 1938. Both sections were electrified at 1,500 V DC when opened. Further work was delayed, and then canceled due to the outbreak of World War II.
CTC signalling was commissioned in 1958, and the Atami to Kinomiya section was duplicated in 1968. The entire line was originally designed to be built as double track, and earthworks were undertaken on this basis, including tunneling, but to date only the first 1.2 km of the line has been duplicated.
Construction south of Itō resumed in 1961, when the private-sector Tokyu Corporation acquired the rights to complete the line to Shimoda and established the Izukyu Corporation to manage construction and operations of this section.
References
^651系改造のリゾート列車 2016年夏デビュー [Rebuilt 651 series resort train to debut in summer 2016]. Tetsudo Hobidas (in Japanese). Japan: Neko Publishing Co., Ltd. 21 January 2016. Archived from the original on 9 June 2019. Retrieved 21 January 2016.