Scotia Place

Scotia Place
Map
Former namesCalgary Event Centre (planning/construction)
LocationCalgary, Alberta
Coordinates51°02′23″N 114°03′08″W / 51.03972°N 114.05222°W / 51.03972; -114.05222 (Scotia Place)
Public transit Victoria Park / Stampede
OwnerCity of Calgary
OperatorCalgary Sports and Entertainment Corporation
Executive suites52
CapacityHockey: 18,400[2]
Construction
Broke groundJuly 22, 2024
Construction costDistrict improvements:$296.9 million
Event Centre Block:$926.4 million
Total:$1.223 billion[1]
ArchitectDialog
HOK
Structural engineerEntuitive
Thornton Tomasetti
Main contractors
  • CANA
  • Mortensen

Scotia Place is a multi-purpose arena under construction in Calgary, Alberta, Canada. It is intended to replace the Scotiabank Saddledome, home of the Calgary Flames of the National Hockey League.[3] Construction began following the groundbreaking on July 22, 2024; the new arena is planned to open prior to the start of the 2027–28 NHL season.[4]

History

CalgaryNEXT

Scotia Place replaced a 2015 plan called CalgaryNEXT, which would have replaced both the Scotiabank Saddledome and McMahon Stadium for Calgary's professional hockey and Canadian football teams. That proposal included two buildings: a 19,000–20,000 seat events centre[5] to serve as the new home arena of two hockey clubs, the National Hockey League's Calgary Flames, and the Calgary Hitmen of the Western Hockey League,[6] as well as the Calgary Roughnecks lacrosse team; and a 40,000-seat football stadium and fieldhouse[5] for the Canadian Football League's Calgary Stampeders and serve as a public training and activity space. The complex, originally planned to be located in West Village along the Bow River[5][7] as a "hub of pro and amateur sporting activity."[5]

Immediate reactions to the CalgaryNEXT proposal from local politicians were mixed; they[who?] supported the plan to redevelop the West Village area, but many – including Mayor Naheed Nenshi – expressed concern at the proposal,[8] which would potentially have the city initially fund between $440 and $690 million of the projected cost which promoters claimed would be recouped over a long period of time. As part of the proposal, the facilities would be owned by the city and managed by the privately owned Calgary Sports and Entertainment Corporation (CSEC) - thus exempting the land from property taxes - but with the city not receiving any share of the profits.[citation needed]

Originally projected as costing $890 million,[5][7] based on a City of Calgary report released in April 2016 it was estimated that CalgaryNEXT would cost approximately $1.8 billion, with taxpayers paying up to two-thirds of the total.[9][10]

In April 2017, the Calgary city council voted unanimously to instead support an alternate plan located near the Saddledome.[11]

New proposal

On September 12, 2017, Flames president and chief executive officer Ken King stated that the team was no longer pursuing the CalgaryNEXT arena, as "we've been working for a long time trying to come up with a formula that really works to replace this building and we really put our best foot forward and I've come to the conclusion sadly and I'm very disappointed that I don't think we can make a deal that works for us".[12] Mayor Nenshi subsequently proposed a partnership wherein portions of the cost of "plan B" would be covered by the city, and the rest covered by the team ownership and user surcharges. King objected to this proposal.[13]

On July 30, 2019, the Calgary city council approved a $550 million new Event Centre. The new arena was to be located to the north of the Saddledome in the Victoria Park neighbourhood. Construction on the building would have begun in 2021, and have a capacity of around 19,000. Plans for the Event Centre also included the possibility of a smaller arena to replace the Stampede Corral.[citation needed] The city of Calgary would have owned the Event Centre while CSEC would have been responsible for the facility's operation and maintenance, keeping all revenue under a 35-year lease agreement, which included a non-relocation clause for the Flames during that period. Had the project went through, The Saddledome would have been demolished after the new arena opened.[14]

On April 14, 2021, the deal for the new arena was put on hold by Calgary city council over budget concerns.[15]

On July 26, 2021, the city announced the cost of the arena had gone from $550 million to $608.5 million. The arena was planned to utilize an "inverted bowl" design which may not have been feasible on the selected piece of land and posed accessibility concerns.[citation needed] As the project progressed further into design work, other potential problems were uncovered, resulting in cost overruns. To address these overruns, it was announced that both the City of Calgary and Calgary Sports and Entertainment Corporation would each be putting forward an additional $12.5 million, a clause agreed on in the deal signed in 2019.[16] The Calgary Sports and Entertainment Corporation then agreed to cover any potential future overruns.[16] Additionally, the city announced as part of the updated deal with CSEC that the Calgary Municipal Land Corp (CMLC). would be removed as project manager and replaced with an organization of CSEC's choosing.[16]

On December 22, 2021, the current mayor of Calgary Jyoti Gondek shared on social media that CSEC was pulling out of the deal, citing disagreements in new costs that the city wanted CSEC to cover a portion of.[17] These overruns included infrastructure costs of $12.1 million and climate mitigation costs of $4 million, with the city offering to cover $6.4 million of the total, leaving $9.7 million to be paid by CSEC.[17] These costs were not previously identified as project costs by CMLC or the City nor were they included in the $608.5 million budget from July 2021.[17] Despite this, CSEC stated their intention on remaining in the Saddledome.[17]

Final deal

On April 25, 2023, a press conference was held in regards to an update surrounding the Calgary Events Centre. It was announced that an updated project on the same site, now estimated to cost $1.22 billion, would be moving forward. A planned arena, indoor rink, and indoor and outdoor plazas.[18] The city is to pay $537.3 million up front, with the Flames ownership paying a total of $748.3 million over 35 years (estimated to be $356 million in 2024 dollars) and the province of Alberta paying $330 million over three years to cover a community rink, some infrastructure costs and the demolition of the Saddledome.[19][20]

On October 5, 2023, the City of Calgary, Province of Alberta, and CSEC announced that they had finalized agreements for the new event centre and district improvements.[3][21]

On July 22, 2024, the design and final name of the arena, Scotia Place, was announced at a groundbreaking ceremony, with construction beginning shortly after.[4]

References

  1. ^ "Event Centre Agreements and Financial Contribution". The City of Calgary. Retrieved March 25, 2024.
  2. ^ Toombs, Aryn. "Ground broken on new Calgary Event Centre, design revealed". Retrieved July 22, 2024.
  3. ^ a b Krause, Darren (October 5, 2023). "Final agreements signed for a new Calgary Event Centre". Livewire Calgary. Retrieved October 22, 2023.
  4. ^ a b Graveland, Bill (July 22, 2024). "Scotia Place name unveiled as work begins on new $800M arena for Calgary Flames". Global News. The Canadian Press. Retrieved July 27, 2024.
  5. ^ a b c d e Wes Gilbertson (August 18, 2015). "No question Calgary pro sports venues are out-of-date". Calgary Sun. Archived from the original on September 6, 2015. Retrieved August 27, 2015.
  6. ^ Lambert, Taylor (August 19, 2015). "New Calgary arena proposal nothing short of brazen". Calgary Herald. Retrieved January 13, 2016.
  7. ^ a b Howell, Trevor (January 12, 2016). "War of words over Flames' CalgaryNEXT proposal not 'useful,' says city manager". Calgary Herald of the Postmedia Network. Retrieved January 13, 2016.
  8. ^ "Statement from Mayor Naheed Nenshi regarding the "CalgaryNext"". Office of the Mayor, City of Calgary. August 18, 2015. Retrieved August 27, 2015.
  9. ^ Howell, Trevor (April 21, 2016). "Flames' CalgaryNEXT proposal could cost $1.8 billion, double original estimate, says city report". Calgary Herald. Retrieved May 19, 2017.
  10. ^ Pike, Helen (December 23, 2016), "Using CalgaryNEXT as part of Olympic bid detrimental to city's chances: Nenshi", Metro, archived from the original on December 24, 2016, retrieved December 23, 2016
  11. ^ Fletcher, Robson (April 24, 2017). "CalgaryNext on life support as council votes unanimously in favour of 'Plan B' near Saddledome". CBC News. Retrieved July 31, 2019.
  12. ^ "King says Flames are no longer pursuing new arena". TSN. September 12, 2017. Retrieved September 13, 2017.
  13. ^ Rumbolt, Ryan (September 15, 2017). "Calgary Flames CEO says city's arena proposal would leave team footing full bill". CBC News. Retrieved September 28, 2017.
  14. ^ "Event Centre". City of Calgary. July 19, 2019. Retrieved July 28, 2021.
  15. ^ Anderson, Drew (April 14, 2021). "Calgary Flames arena deal paused over budget concerns". CBC News. Retrieved April 27, 2021.
  16. ^ a b c MacVicar, Adam (July 26, 2021). "Calgary events centre: City and CSEC to each cover $12.5M in cost overruns, CMLC out". Global News. Retrieved July 27, 2021.
  17. ^ a b c d Smith, Madeline (December 22, 2021). "Calgary Flames owners walk away from arena deal". Calgary Herald. Retrieved December 26, 2021.
  18. ^ "Agreements announced to further develop the Rivers District, anchored by a modern event centre". Agreements announced to further develop the Rivers District, anchored by a modern event centre. Retrieved April 25, 2023.
  19. ^ "Braid: New arena deal is costlier than the original, with province paying for infrastructure and Saddledome demolition". calgaryherald. Retrieved April 25, 2023.
  20. ^ "Scotia Place: Frequently Asked Questions". City of Calgary. Retrieved July 27, 2024.
  21. ^ Development, Planning &. "Calgary's Event Centre and Culture + Entertainment District improvements". City of Calgary. Retrieved October 26, 2023.