Rublyovo-Arkhangelskaya line

Rublyovo-Arkhangelskaya line
Overview
Native nameРублёво-Архангельская линия
LocaleMoscow
Stations10
Service
TypeRapid transit
SystemMoscow Metro
Operator(s)Moskovsky Metropoliten
Technical
Line length18.7 kilometres (11.6 mi)
CharacterUnderground
Track gauge1,520 mm (4 ft 11+2732 in)
ElectrificationThird rail
Route map

Ilyinskaya
Rublyovo-Arkhangelskoye
Lipovaya Roshcha
Strogino
Transfer for #3 Arbatsko-Pokrovskaya line at Strogino
Serebryanyy Bor
Bulvar Generala Karbysheva
Narodnoye Opolcheniye
Transfer for #11 Bolshaya Koltsevaya line at Narodnoye Opolcheniye
Zvenigorodskaya
Shelepikha
Delovoy Tsentr
Transfer for #4A Filyovskaya line at Delovoy TsentrTransfer for #8 Kalininskaya line at Delovoy Tsentr
possible future connection with #18 Biryulyovskaya line

Rublyovo-Arkhangelskaya line (Russian: Рублёво-Архангельская линия) or Line 17 of the Moscow Metro is currently under construction. It began in 2021 and will end after 2028, opening in two phases.[1][2] Phase 1 is scheduled to be completed by 2026–2027 completing the section from Delovoy Tsentr to Lipovaya Roscha station, and phase two is scheduled to open after 2028 expanding the line from Lipovaya Roshcha to Ilyinskaya station. In the future it is planned to be connected with the Biryulyovskaya line.[3]

Line 17 colored light brown in future Moscow Metro map

Stations

English Russian Transfer Status Opening
Ilyinskaya Ильинская Planned
Rublyovo-Arkhangelskoe Рублёво-Архангельское Planned
Lipovaya Roshcha Липовая Роща Planned
Strogino Строгино Transfer for #3 Arbatsko-Pokrovskaya line at Strogino Strogino Planned
Serebryanyy Bor Серебряный Бор Planned
Bulvar Generala Karbysheva Бульвар Генерала Карбышева Under Construction 2026
Narodnoye Opolcheniye Narodnoye Opolcheniye Transfer for #11 Bolshaya Koltsevaya line at Narodnoye Opolcheniye Narodnoye Opolcheniye Under Construction 2026
Zvenigorodskaya Звенигородская Under Construction 2026
Shelepikha Шелепиха Transfer for #14 Moscow Central Circle at Shelepikha Shelepikha
Transfer for #D1 Line D1 (Moscow Central Diameters) at Testovskaya Testovskaya (within walking distance)
Initially opened as part of Line 11, currently closed and will reopen with the opening of Line 17[4] 2018 (as part of Line 11), 2026 (as part of Line 17)
Delovoy Tsentr Деловой Центр Transfer for #8a Solntsevskaya line at Delovoy Tsentr Delovoy Tsentr
Transfer for #4 Filyovskaya line at Vystavochnaya Vystavochnaya
Transfer for #14 Moscow Central Circle at Delovoy Tsentr Delovoy Tsentr (within walking distance)
Transfer for #D4 Line D4 (Moscow Central Diameters) at Testovskaya Testovskaya (within walking distance)
Transfer for #D1 Line D1 (Moscow Central Diameters) at Testovskaya Testovskaya (within walking distance)
Initially opened as part of Line 11, currently closed and will reopen with the opening of Line 17[4] 2018 (as part of Line 11), 2026 (as part of Line 17)

References

  1. ^ "В Москве началось строительство Рублево-Архангельской линии метро". Interfax. Retrieved 8 October 2020.
  2. ^ "Началось строительство Рублево-Архангельской линии метро". Mos.ru (in Russian). 21 September 2020. Retrieved 8 October 2020.
  3. ^ "На карте метро может появиться 15-я линия - Рублево-Архангельская". kp.kg. 7 October 2016. Retrieved 8 October 2020.
  4. ^ a b https://mosmetro.ru/news/details/4629