Kempapura metro station

Kempapura
Namma Metro station
General information
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Blue Line Orange Line
Platforms  Side platform (TBC)
Platform-1 → Krishnarajapura / Central Silk Board
Platform-2 → KIAL Terminals
  Side platform (TBC)
Platform Numbers (TBC)
Tracks2 (TBC)
Construction
Structure typeElevated, Double track
Platform levels2 (TBC)
Parking(TBC)
Accessible(TBC)
Other information
Status  - Under Construction
  - Approved
Station code(TBC)
History
Opening  December 2026; 23 months' time (December 2026) (TBC)
  2029; 4 years' time (2029) (TBC)
Electrified(TBC)
Services
Preceding station Namma Metro Following station
Veerannapalya Blue Line
(Under Construction)
Hebbala
Hebbala Orange Line
(Future Service)
Terminus
Location
Map

Kempapura is an upcoming elevated metro station on the north–south corridor of the Blue Line[1] of Namma Metro in Bangalore, India. This metro station is stated to become operational around December 2026.[2][3][4][5]

History

Blue Line

On November 17 2020, the Bangalore Metro Rail Corporation Limited (BMRCL) invited bids for the construction of the Kempapura metro station, part of the 11 km Reach 2B – Package 1 (Krishnarajapura - Kempapura) of the 37.692 km Blue Line of Namma Metro. On September 14 2021, Nagarjuna Construction Company Ltd. (NCC Ltd.) was chosen as the lowest bidder for this segment, with their proposal closely matching the initial cost estimates. [6] As a result, the contract was awarded to the company, which led to the beginning of the construction works of this metro station as per the agreed terms. [7]

Station Layout

Blue Line Station Layout - To Be Confirmed

Kempapura track layout (TBC)
P#
P#
Station with two tracks and two side platforms
** Under Construction and Proposed
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Northbound
Towards → KIAL Terminals
Next Station: Hebbala
Change at the next station for Orange Line or Red Line
Platform #
Southbound
Towards ← Krishnarajapura / Central Silk Board
Next Station: Veerannapalya
Side platform | Doors will open on the left Disabled access
L2

Orange Line Station Layout - To Be Confirmed

Kempapura track layout (TBC)
to Train Terminates Here
P#
P#
Station with two tracks and two side platforms
** Under Construction and Approved
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Eastbound
Towards → Train Terminates Here
Platform #
Westbound
Towards ← JP Nagar 4th Phase
Next Station: Hebbala
Change at the next station for Blue Line or Red Line
Side platform | Doors will open on the left Disabled access
L2

References

  1. ^ "Bengaluru Metro Blue Line: Explore the City Like Never Before! - TimesProperty". timesproperty.com. Retrieved 14 December 2023.
  2. ^ "L&T bags track contracts worth ₹501 crore for Bangalore Metro Phase 2A & 2B | Metro Rail Today". Metro Rail Today: Gateway to Rail & Metro Industry. Retrieved 14 December 2023.
  3. ^ "Metro line to Bengaluru Airport to be ready by June 2026: D K Shivakumar". The Indian Express. 6 June 2023. Retrieved 14 December 2023.
  4. ^ "Bengaluru Airport Metro Line from KIA to Devanahalli Set for Completion by June 2026". TimesNow. 7 June 2023. Retrieved 14 December 2023.
  5. ^ "Metro's ORR, Airport line to be ready by Sept 2026, will benefit IT industry hugely: BMRCL". The New Indian Express. 16 September 2023. Retrieved 14 December 2023.
  6. ^ "NCC Wins Bangalore Metro Airport Line's Construction Work". The Metro Rail Guy. 14 September 2021. Retrieved 24 October 2024.
  7. ^ Service, Express News (16 September 2021). "Nagarjuna Construction Company wins bid to build Namma Metro's Airport Line". The New Indian Express. Retrieved 24 October 2024.