Rashtreeya Vidyalaya Road metro station

Rashtreeya Vidyalaya Road
Namma Metro station
Rashtreeya Vidyalaya Road metro station, February 2020
General information
Other namesR. V. Road, Rashtreeya Vidyalaya Raste, R. V. Raste, Jayanagara 5th Block, Jayanagar 5th Block
LocationRashtreeya Vidyalaya Road, 5th Block, Jayanagar, Bengaluru, Karnataka 560041
Coordinates12°55′17″N 77°34′49″E / 12.921458°N 77.580375°E / 12.921458; 77.580375
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Green Line Yellow Line
PlatformsSide platform

Platform-1Nagasandra
Platform-2Silk Institute

(Yellow Line)
Platform-3 → Train terminates here
Platform-4Bommasandra
Platform numbers (TBC)
Tracks2 + 2 (U/C)
ConnectionsMetro interchange Upcoming Yellow Line
Construction
Structure typeElevated, Double track
Platform levels2
AccessibleYes Disabled access
Other information
StatusStaffed
Station codeRVR
History
Opened  18 June 2017; 7 years ago (2017-06-18)
Opening  25 January 2025; 2 months' time (25 January 2025) (TBC)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
Jayanagar
towards Nagasandra
Green Line Banashankari
Terminus Yellow Line
(Operational around January 2025)
Ragigudda
towards Bommasandra
Location
Map

Rashtreeya Vidyalaya Road is an elevated interchange metro station on the North-South corridor of the Green Line and the East-West corridor of the upcoming Yellow Line of Namma Metro serving the 5th and 8th Block of Jayanagar area of Bangalore, India. It was opened to the public on 18 June 2017.[1]

As per latest reports, the Yellow Line is slated to be operational between 2nd & 4th weeks of January 2025[2] due to lots of trial runs along with more trainsets which are needed for commencement of operations.[3][4][5][6][7]

History

In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the terminal metro station (Rashtreeya Vidyalaya Road) along the 6.340 km Reach 5 – Package 3 section (Central Silk Board - Rashtreeya Vidyalaya Road) of the 18.825 km Yellow Line of Namma Metro. On 16 May 2017, HCC-URC Cementation JV was selected as the lowest bidder for this stretch, with their bid closely aligning with the original cost estimates.[8] Consequently, the contract was successfully awarded to the company, which then commenced construction of the metro station in accordance with the agreements.

Station layout

Rashtreeya Vidyalaya Road track layout
P1
P2
Station with two tracks and two side platforms
Rashtreeya Vidyalaya Road track layout **
to Train Terminates Here
P#
P#
Station with two tracks and two side platforms
** (Final Stages before Operations)
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Silk Institute
Next Station: Banashankari
Platform 1
Northbound
Towards ← Nagasandra
Next Station: Jayanagar
Island platform | P1 & P# doors will open on the left Disabled access
Yellow Line Station Layout & Platform Numbers - (TBC)
Platform #
Southbound
Towards → Bommasandra
Next Station: Ragigudda
Platform #
Northbound
Towards ← Train Terminates Here
Side platform | Doors will open on the left Disabled access
L2

Entry/Exits

There are 2 Entry/Exit points – A and B. Commuters can use either of the points for their travel.

  • Entry/Exit point A: Towards Jayanagar 5th Block side
  • Entry/Exit point B: Towards Jayanagar 7th/8th Blocks side with wheelchair accessibility

See also

References

  1. ^ "Nagasandra-Puttenahalli Metro line to open by May-end, says KJ George". The Times of India. 3 May 2017. Retrieved 2 July 2017.
  2. ^ "Bengaluru: Yellow Line safety clearance by December end, opening after second week of January". Deccan Herald. Retrieved 29 October 2024.
  3. ^ "Bengaluru Metro's Yellow Line to Open in November 2024, Tejasvi Surya Shares Key Details". TimesNow. 9 March 2024. Retrieved 10 March 2024.
  4. ^ DHNS. "Bengaluru metro's Yellow Line to start only after general elections". Deccan Herald. Retrieved 14 December 2023.
  5. ^ "RV Road-Bommasandra Metro stretch to open by April: CM Siddaramaiah". The New Indian Express. Retrieved 11 November 2023.
  6. ^ "Metro Yellow Line to E-City & extended Green Line to open by April 2024: CM Siddramaiah". The Times of India. 21 October 2023. ISSN 0971-8257. Retrieved 11 November 2023.
  7. ^ "Bengaluru metro's yellow line connecting Bommasandra to Silk Board to open by February 2024, says MP Tejasvi Surya". Hindustan Times. 6 October 2023. Retrieved 11 November 2023.
  8. ^ "HCC-URC JV Lowest Bidder for Bangalore Metro's RV Rd - HSR Layout". The Metro Rail Guy. 16 May 2017. Retrieved 23 October 2024.