Nagawara is an upcoming important underground northern terminal metro station on the North-South corridor of the Pink Line[1] and upcoming elevated metro station on the Blue Line[2] of Namma Metro in Bangalore, India. This metro station will be an interchange metro station between Pink Line and Blue Line.
As per the latest updates, this metro station, under the second phase (Pink Line), covering the total distance of 13.8km stretch (Dairy Circle - Nagawara) is expected to be operational around December 2026[3][4][5][6][7][8] (under Blue Line) around June 2026.[9][10][11][12][13][14]
History
Pink Line
In June 2017, Bangalore Metro Rail Corporation Limited (BMRCL) sought bids for constructing the Nagawara metro station along the 4.59 km Shadi Mahal Ramp - North Ramp stretch of the 21.25 km Pink Line of Namma Metro. In November 2019, ITD Cementation India emerged as the lowest bidder for this stretch which aligned closely with the original estimate, thus leading to successful award for this company. They commenced the construction of this metro station as per the agreements.
Blue Line
On November 17 2020, the Bangalore Metro Rail Corporation Limited (BMRCL) invited bids for the construction of the metro station, part of the 11 km Reach 2B – Package 1 (Krishnarajapura - Kempapura) of the 37.692 km Blue Line of Namma Metro. On September 14 2021, Nagarjuna Construction Company Ltd. (NCC Ltd.) was chosen as the lowest bidder for this segment, with their proposal closely matching the initial cost estimates. [15] As a result, the contract was awarded to the company, which led to the beginning of the construction works of this metro station as per the agreed terms. [16]