Track work in 2018–19, which included replacement of platform edges at several stops, triggered requirements for accessibility modifications at those stops.[2] Design work for Fairbanks Street and seven other C Branch stations was 15% complete by December 2022.[3] Designs shown in February 2024 called for Fairbanks Street and Brandon Hall stations to be consolidated into a single station between their present locations. Accessible ramps to the north side of Beacon Street would be built at Lancaster Terrace and Mason Path.[4] In May 2024, the Federal Transit Administration awarded the MBTA $67 million to construct accessible platforms at 14 B and C branch stops including the combined station.[5] As of June 2024[update], construction is expected to be complete in fall 2026.[6]