You can help expand this article with text translated from the corresponding article in Polish. Click [show] for important translation instructions.
Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia.
Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing Polish Wikipedia article at [[:pl:Obwodnica Trójmiasta]]; see its history for attribution.
You may also add the template {{Translated|pl|Obwodnica Trójmiasta}} to the talk page.
Construction started in the 1970s and the first section was opened for use in 1977. Due to a lack of funds during the 1980s, construction was delayed many times. The fall of communism in 1990 also slowed down construction. Major sections of the beltway were completed in 2001 with the last two major junctions finished in 2008.
The various stages were constructed in the following years:
The beltway is an important piece of infrastructure in the Pomeranian Voivodeship easing congestion through the center of the Tricity area and diverting transit traffic. The beltway also connects the Gdańsk Lech Wałęsa Airport with the rest of the Voivodeship.
The Tricity Ring Road was one of the first orbital, beltway and ring roads that bypass major cities in Poland.
Current development
A junction connecting the south end of the Tricity Beltway to the A1 motorway has been completed by 22 December 2007 enabling travel first up to Grudziądz and, as the A1 was completed, through Toruń, Łódź and Katowice, to the Czech border in the south.
On 12 June 2008, Trasa im. Eugeniusza Kwiatkowskiego was completed and finally connected the Port of Gdynia to the beltway, bypassing the local city streets. This reduced truck traffic in residential areas greatly since all heavy trucks heading towards the port used National road 6, which at the time went through the center of the city.
In 2012 a 18 km stretch of the S7 expressway was opened in Gdańsk, extending from the S6 eastward, forming the southern bypass of Gdańsk.
A new beltway called the Tricity Metropolitan Ring Road is being planned further out, after multiple delays scheduled for 2025, and the route of the S6 expressway is to be moved there once it is opened.
In 2022 the Trasa Kaszubska was opened as the first segment of the new beltway and the S6 along with the E28 were rerouted over it while the old course became part of S7.