The motorway was constructed between 2005 and 2022. The section from Gdańsk to Toruń is tolled (see Tolls).
History of construction
The construction of the A1 motorway has been a highly politicized issue in Poland, as it is perceived to be an economically vital road that would connect the country's major ports on the Baltic coast with both central and southern Poland. One short fragment (17 km) was constructed in years 1978 – 1989, one of the first motorway stretches built under communist regime. Since 1989 various governments and political parties have supported an accelerated construction schedule for this motorway, without results.
After many delays, caused mainly by lack of funding, construction started in 2005. The main part of the motorway was constructed in years 2005 – 2014: about 395 km (70% of the route's length) have been built within this period. By July 2016 (when a delayed Łódź bypass section was finished), the route has been completed except for those sections where the old national road 1 had already been a dual carriageway, allowing for a significantly lower priority of constructing a motorway on this remaining stretch compared to construction of other highways.
The section from Częstochowa to Pyrzowice was constructed in years 2016 – 2020. The remaining section from Tuszyn to Częstochowa was constructed in years 2019 – 2022, which also included an upgrade of the 17 km long pre-1989 stretch.
Gdańsk to Stryków
This section was built in stages between 2005 and 2014. First, a 25 km (16 mi) section was opened on 22 December 2007, near Gdańsk, extending the S6 bypass expressway, and a remaining 65 km (40 mi) opened on 17 October 2008. The 62 km extension of the motorway to Toruń opened on 14 October 2011. In November 2012 a 75 km (47 mi) long section from Kowal to Łódź Północ interchange in Stryków was opened, followed by 45 km (28 mi) extension from Toruń to Włocławek in December 2013. Missing Włocławek-Kowal section was completed in April 2014.
Stryków to Pyrzowice
The oldest section of this segment, a 17.5 km (11 mi) stretch as the Piotrków Trybunalski bypass, was built between 1978 and 1989. This was one of the very few stretches of motorway built in Poland under the Communist regime. In addition, the section from Częstochowa to Piotrków Trybunalski was built in the 1970s as a dual carriageway road on a motorway alignment. However, it lacked motorway interchanges, and instead had standard intersections with no grade separation, regulated by traffic lights.
On 22 January 2009 a contract was signed for the construction of the 180 km (110 mi) section from Stryków (junction with motorway A2) to Pyrzowice.[2] Under the terms of the contract, the segment from Stryków to Częstochowa (123 km (76 mi)) was to be finished by May 2012, while the remaining segment from Częstochowa to Pyrzowice (57 km (35 mi)) was to be finished by January 2014 (60 months after the signing of the contract). The motorway was to be built within a Private-Public Partnership framework by company Autostrada Południe. The contract included the rebuilding of an already existing stretch of A1 motorway (opened in 1989) as well as the upgrade of the existing dual-carriageway road between Piotrków Trybunalski and Częstochowa. On 23 January 2010 the contract was cancelled as the company was not able to secure financing.[3] It carried out the design project of the motorway however, which according to the Polish government was to make it possible for construction to begin in 2010 by new contractors, and be finished by 2012. However, the design project turned out to be full of flaws and needed to be redone.[4]
The section from Łódź Północ interchange to Tuszyn interchange was opened in 2016. The section from Pyrzowice to Częstochowa began construction in 2016, and was finished in 2020. Reconstruction of the remaining dual-carriageway stretch from Częstochowa to Piotrków Trybunalski began in 2019 and finished in 2022.
Pyrzowice to border with Czech Republic
At the southern end of the motorway, construction of a 15.5 km (9.6 mi) section from Gliwice-Sośnica to Bełk, part of the southernmost section from the junction with the A4 motorway at Sośnica district of Gliwice to the Czech border, began on 26 March 2007 and was completed in December 2009. The remainder of the 48 km (30 mi) long section from A4 to the border was opened in different stages from 2009 till 2014. Construction of the 43 km (27 mi) section from Pyrzowice to Gliwice-Sośnica began in 2009 and was fully completed by June 2012. The section from Pyrzowice to Piekary Śląskie has quickly deteriorated into very poor condition due to the materials used for its foundation, and is planned to be repaired.[5]
On 15 December 2009 the Polish government announced the cancelling of the contract for building the Świerklany - Gorzyczki (Czech border) section, citing the unacceptably slow pace of construction by Alpine Bau GmbH.[6] The government solicited new bids for this section in April 2010[6] and the bid was won by the same company that lost the original contract, and construction resumed in October 2010.[7] The original plan was for the road to be ready in the Summer of 2010,[6] and according to the new contract it was to be ready in April 2012, in time for Euro 2012 championships. Alpine Bau GmbH abandoned their second effort to finish this section in May 2013.[8] It was finally opened in May 2014.
Construction interrupted in September 2012, as companies involved have been ejected from the contract.[9][10] (the ejected companies have sued the Polish authorities). New contractors have been selected in April 2013 and the road opened to traffic in December 2013 (45 km) and April 2014 (19 km).[11][12]
Design-build contract signed in December 2010, completion originally planned in 32 months,[13] then delayed to June 2014,[14] then later plans had it completed in Summer of 2015.[15] However, the contractor abandoned the contract in January 2014.[16] New contractors have been appointed fall 2014.[17] Opened July 2016.
Contract signed in October 2015. In April 2019, Salini Impregilo was ejected from the contract for extensive delays. In August 2019, completion of the section was awarded to Budimex, Strabag and Bud-Pol. The section was opened to traffic on 23 December 2019,[18] while the construction works continued till June 2020.
Opened 2 August 2019. The fragment from "Częstochowa Blachownia" to "Częstochowa Południe" remained closed to traffic until 23 December 2019, when the adjacent section was opened.[19]
Construction interrupted in late 2009 due to contract dispute,[6] then resumed[7] in October 2010. Was to be opened in July 2012,[23] but a problem with one of the bridges then moved the planned opening until August, 2013.[24] Section Mszana - Gorzyczki was opened in November 2012, but only light vehicles were allowed to use it until completion of the remaining fragment.
In May, 2013 the contractor abandoned the project, citing disagreement with Polish government agencies.[25] A new contractor to finish the bridge was selected in June 2013, and the road fully opened to traffic on May 23, 2014.
• Incomplete junction: no exit ramp Katowice → Piotrków Trybunalski; no entry ramp Piotrków Trybunalski → Katowice
• Exit numbering: in direction of Katowice exit ramp towards Łódź signed with number 25A, exit ramp towards Piotrków Trybunalski signed with number 25B; in direction of Łódź exit signed with number 25
Roadworks on the junction as part of upgrading Piotrków Trybunalski–Częstochowa section of national road 1 to motorway; exit number as part of "experimental signage"; access to national road 91 through road 484 in direction of Kamieńsk