You can help expand this article with text translated from the corresponding article in Chinese. (July 2019) Click [show] for important translation instructions.
Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia.
Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing Chinese Wikipedia article at [[:zh:南迴線]]; see its history for attribution.
You may also add the template {{Translated|zh|南迴線}} to the talk page.
The South-link line (Chinese: 南迴線; pinyin: Nánhuí Xiàn) is a line of the Taiwan Railway running across the southern tip of the island of Taiwan, connecting the eastern and western coasts. It is 98.2 km long, of which 81.4 km is single-track.[1]
The section between Nanzhou and Linbian railway stations was upgraded from a single-track railway to a dual-track railway while the other sections remains in single-track.[2] In conjunction with electrification works on the line, train platforms are being lengthened and upgraded with better facilities.
History
Japanese authorities had planned for a railway running between Pingtung and Taitung, but were unable to complete it before World War II ended. After the Kuomintang-led government took control, surveys were completed in 1947, 1958, 1963, 1968, and 1976, delineating ten possible routes for the South Link Line. Construction began in July 1980, and was completed in November 1991. Upon its inauguration on 16 December 1991, the South Link Line became the newest standard rail line operated by the TRA, and created an around-the-island railway network. The line began became accessible for public use in February 1992.[3]
In August 2009, sections of the line were badly damaged by floods triggered by Typhoon Morakot.[4] The line was reopened on December 30, 2009.
In September 2010, service was temporarily suspended due to Typhoon Fanapi.[5] The Taimali River (Chinese: 太麻里溪) had risen substantially and washed away 100 m (330 ft) of railway embankment. The line was reopened on September 29, 2010.[5] The Taiwan Railway Administration plans to spend an additional NT$240 million on a double-tracked, 520 m (1,710 ft) bridge over the Taimali River to avoid future problems with flooding.[5]
Electrification works on the section from Fangliao Station to Zhiben Station was completed in December 2020 with the first passenger services operating on the 20th December 2020.[6]