The Russell City Energy Center is the nation’s first power plant to receive a federal air permit that includes a voluntary limit on greenhouse gas emissions.[2] A Federal Appeals Court, in May 2012, denied an environmental claim by nearby Chabot College.[3][4] The plant went online in August 2013, and its full output of electricity is sold to Pacific Gas and Electric Company under a 10-year contract.[2][5] Calpine Corporation owns 75% of the plant's peak dispatchable capacity, or 464 megawatts, and GE Energy Financial Services owns the balance.[3]
On May 27 2021 an explosion at the plant shut down energy production. The city of Hayward is opposing the reopening until more is known about the cause.[6]
Design and specifications
The power train consists of two Siemens Westinghouse 501 FD Phase 2 combustion turbine generators (CTG), each 200 MW maximum and each followed by a heat recovery steam generator (HRSG). The two HRSGs are heated from the CTG exhaust gases to generate steam. The generated steam is let in a single steam turbine generator (STG) of 235 MW maximum. Resulting peak output is 635 MW gross.
Under baseload operation, the output is 184 MW gross from each gas-turbine and 198 MW gross for the steam-turbine, adding to 567 MW gross of which 14 MW consumed by the auxiliary equipment, yielding a 553 MW net output.
The two CTGs output the power at 15 kV, the STG at 18 kV, output which is connected to individual oil-filled generator step-up transformers, increasing voltage to 230 kV. The auxiliary equipment motors are operated at 4,160 volts and the balance power distribution is operated at 480 volts and 277 volts for the lighting loads.[7]
Production
Russell City Energy Center's production is as follows.[8]