You can help expand this article with text translated from the corresponding article in Spanish. (August 2024) Click [show] for important translation instructions.
View a machine-translated version of the Spanish article.
Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia.
Consider adding a topic to this template: there are already 1,131 articles in the main category, and specifying|topic= will aid in categorization.
Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing Spanish Wikipedia article at [[:es:Tranvía de Parla]]; see its history for attribution.
You may also add the template {{Translated|es|Tranvía de Parla}} to the talk page.
The Madrid city of Parla has a circular tram line which provides transportation within the city as well as to the rest of the metropolitan area. This network is standard gauge which facilitates compatibility and vehicle interchangeability with other lines built or planned in the Community of Madrid. The main shareholder of the company is Globalvia[1] (a Spanish private infrastructure company) with 85%, and then CCM with 15%.
The tram is integrated in the Metro Ligero system as ML Line 4.[2]
Project
This is a project promoted by the local administration of Parla. Opened on 6 May 2007 (Phase I), and 8 September 2007 (Phase II), can be the journey between the stations Plaza de Toros to Parla Industrial City until completion of the works of the station North Parla (which is still to be opened and will house a railway interchange with Cercanías Madrid).
It consists of a circular line of 15 stations with stops every 500 meters (1,600 ft), a total length of 8.3 km (5.2 mi) (similar to the Montpellier tramway). It connects the city center with new urban developments (Parla Este among them) and points of interest in the city such as the Commissioner of Police, health and cultural centers, shopping centers, etc. There is a connection with the Parla station of Cercanías Madrid located in downtown Parla and in future with a new station in the north of the city. Along with the construction of the tram, there have been "park and ride" facilities built throughout the city to promote the use of public transport.
Extensions
There were plans to eventually build two more lines, also circular.
"Line 2" (or Metro Ligero ML-5) would run to PAU-5, located on the banks of the A-42, to aid in the development of the Parla industrial park.
"Line 3" (or Metro Ligero ML-6) would serve the future developments of southern Parla and the hospital and the new commuter train station to be located in the south of the city.
Given the financial crisis facing the city there are many questions about the economic feasibility of extending the system. As of January 2020[update], Parla Tram remains a single line.
Ticketing
The ticket price is similar to urban bus lines in the city. Madrid regional travel passes are valid (at least B2 zone).