You can help expand this article with text translated from the corresponding article in Turkish. (October 2024) Click [show] for important translation instructions.
Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia.
Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing Turkish Wikipedia article at [[:tr:M1 (İstanbul Metrosu)]]; see its history for attribution.
You may also add the template {{Translated|tr|M1 (İstanbul Metrosu)}} to the talk page.
Line M1, officially referred to as the M1 Yenikapı–Atatürk Airport/Kirazlı metro line (Turkish: M1 Yenikapı–Atatürk Havalimanı/Kirazlı metro hattı), also known as the Istanbul Light Metro (Turkish: Hafif Metro), is a rapid transit line of the Istanbul Metro. It is colored red on the maps and route signs. Opened in 1989, it was the first rapid transit line in Istanbul and Turkey and its opening started the revival of mass-transit in Turkish cities.
The M1 consists of two train services, M1A and M1B. Both services run on the same line from Yenikapı to Otogar, where the M1B branches off to Kirazlı, while the M1A continues on the original line to Istanbul Atatürk Airport. The M1 has 23 stations in service, of which 11 are underground and 3 elevated,[1] and the total length of the line is 26.8 kilometers (16.7 mi).[2] Even though the M1 is fully grade separated, it is considered a light metro line, due to the relatively low passenger capacity compared to other lines of the system.
In November 2014, the extension from Aksaray to Yenikapı was opened.[3]
History
With Istanbul's population growing and the city rapidly expanding outward, the bus service available in the city became insufficient in the 1970s and 1980s. At that time, the city did not have a mass transit rail system, except for a single 0.57 km (0.35 mi) funicular line known as Tünel – the last operating original tramline was closed in 1969. Istanbul desperately needed a rapid transit rail system to help transport its large population.
The first segment of the M1 line began service on September 3, 1989, between Aksaray and Kocatepe.[1] On December 18, 1989, the line was extended to Esenler,[1] but at that time the Otogar (Intercity Bus Station) was omitted. The Otogar station, and the segment between Otogar and Zeytinburnu stations on the M1A branch line, was opened on January 31, 1994.[1] Following this, the M1A segment between Zeytinburnu and Bakırköy stations was opened on July 3 of the same year.[1] Further extensions of the M1A line, to Ataköy and then Yenibosna stations, were opened in July and August 1995,[1] at which point the length of the line reached approximately 16 km (9.9 mi). In 1999, a new M1A line station located between Ataköy and Bakırköy stations, the Bahçelievler station, opened. Finally, the M1A branch line was completed on December 20, 2002, when the extension to the World Trade Center and Atatürk Airport in Yeşilköy opened.
A rebuilt Esenler station opened on February 22, 2012.[1] The extension of the M1B branch line from Esenler to Kirazlı opened on June 14, 2013.[1]
The extension of the M1 line from Aksaray to Yenikapı was inaugurated on November 9, 2014, allowing connections with the M2 line and Marmaray commuter rail service, as well as İDO seabus service.[2][3] Using the M2 and Marmaray, passenger may travel north of the Golden Horn to Taksim, Mecidiyeköy, Levent and Maslak as well as across the Bosphorus to Üsküdar and Kadıköy. İDO seabuses offer service to coastal districts of Istanbul as well as other cities and towns on the Sea of Marmara.
Operations and route
A total of 105 trainsets transport up to 400,000 passenger daily between the operation hours from 6:00 in the early morning to 0:00 in the midnight.[1] The M1 line has a maximum headway of 2 ½ minutes during peak hours.[1] All stations have covered seating. A total of 135 escalators and 65 elevators make access to the stations easy for passengers.[1]
M1A line
The M1A line is 20 kilometers (12.4 mi) long in total,[4] and serves 18 stations. The trip between the termini stations, Yenikapı and Atatürk Airport, takes approximately 35 minutes.[2] Daily, 169 trains run in each direction between the termini stations, with a peak-hour headway of 6 minutes.[2]
On the M1A line, seven stations are built underground, nine are ground-level stations, and three are elevated. The stations are so structured that six of them have island platforms and eleven stations have side platforms. The connection station at Otogar in Esenler has two island platforms, which enable traffic on three tracks by the two different M1 branch lines.[2]
M1B line
The M1B line is 14.0 kilometers (8.7 mi) long in total,[5] and serves 13 stations. The trip between the termini stations, Yenikapı and Kirazlı, takes approximately 25 minutes.[6] Daily, 168 trains run in each direction between the termini stations, with a peak-hour headway of 4 minutes.[6]
On the M1B line, eight stations are built underground and five are ground-level stations. The stations are so structured that eight of them have island platforms and four stations have side platforms. The connection station at Otogar in Esenler has two island platforms, which enable traffic on three tracks by the two different M1 branch lines.[6]
Stations
M1 trunk section (served by both the M1A and M1B lines)
As of November 2020,[update] a 9.7 kilometers (6.0 mi) extension to a new terminus station at Halkalı is under construction. It will add nine stations to the M1B branch, west of Kirazlı offering an interchange with both the Marmaray and M11 lines.[7]
Since this line is the oldest modern rail line in İstanbul, it has relatively old vehicles, produced by Asea Brown Boveri and SGP Verkehrstechnik in Graz, Austria in the late-1980s. The vehicles reach a maximum speed of 80 km/h (50 mph) with an acceleration of 0.7 m/s2.