The station of Line 1-Blue was opened on 26 September 1975. It's an underground station with a flow distribution mezzanine and island and side platforms with structure in apparent concrete. It has a 18,250 square metres (196,400 sq ft) constructed area and capacity for 40,000 passengers per hour in peak hours.[3]
The free connection with the CPTM station started on 30 November 2004, by an initiative of the State Secretariat of Metropolitan Transports.[4]
Line 4-Yellow
Characteristics
The station of Line 4-Yellow was originally scheduled to be opened in 2008, but was opened only on 15 September 2011[5] and started operating from 10a.m. to 3p.m. On 23 September, the time was increased to 9a.m. to 4 p.m. and, since 26 September, from 4:40 a.m. to midnight.
It's an underground station with side platforms. It has a 20,594.84 square metres (221,681.0 sq ft) of constructed area, with five levels and 36 metres (118 ft) of depth. A skylight in the roof of the station allows the entrance of solar light.