Wind farm
Country
Location
Cap. (MW )
Turbines
Commissioned
Build Cost
Depth range (m )
km to shore
Owner
Refs.
Albatros
Germany
54°30′N 6°24′E / 54.500°N 6.400°E / 54.500; 6.400 (Albatros (117.6 MW) )
117.6
16 × Siemens SWT-7.0-154
2020
Alpha Ventus
Germany
54°0′40.3″N 6°36′28.1″E / 54.011194°N 6.607806°E / 54.011194; 6.607806 (Alpha Ventus (60 MW) )
60
6 × Multibrid M5000, 6 × REpower 5M
2010
€ 250 million
28
56
EWE 47.5%E.ON 26.25%Vattenfall 26.25%
[ w 1] [ 3] [ 4]
Amrumbank West
Germany
54°31′21.7″N 7°42′17.3″E / 54.522694°N 7.704806°E / 54.522694; 7.704806 (Amrumbank West (302 MW) )
302
80 × Siemens SWT-3.6-120
2015
20-25
40
Amrumbank West GmbH
Borkum Riffgrund I
Germany
53°58′0″N 6°33′0″E / 53.96667°N 6.55000°E / 53.96667; 6.55000 (Borkum Riffgrund I (312 MW) )
312
78 × Siemens SWT-4.0-120
2015
€1.25 billion
23-29
55
Ørsted , Kirkbi , Oticon
[ w 2]
Borkum Riffgrund II
Germany
53°56′49″N 6°29′7″E / 53.94694°N 6.48528°E / 53.94694; 6.48528 (Borkum Riffgrund II (448 MW) )
448
56 × MHI Vestas V164
2019
BARD Offshore 1
Germany
54°21′30″N 5°58′30″E / 54.35833°N 5.97500°E / 54.35833; 5.97500 (BARD Offshore 1 (400 MW) )
400
80 × BARD 5.0
2013
€ 2,900 million
40
100
Ocean Breeze Energy
[ w 3] [ 5]
Beatrice Demonstration Project)
United Kingdom
58°06′20″N 03°05′35″W / 58.10556°N 3.09306°W / 58.10556; -3.09306 (Beatrice 10MW )
10
2 × REpower 5M
2007
£ 35 million
45
23
SSE and Talisman Energy
[ w 4] [ 1] [ 6] [ 7] [ 8] p11
Belwind
Belgium
51°39′36.0″N 2°48′0.0″E / 51.660000°N 2.800000°E / 51.660000; 2.800000 (Belwind (171 MW) )
165
55 × Vestas V90-3.0MW 55 × Alstom Haliade 150-6MW
2010
€614 million
46
Parkwind
[ w 5] [ 9] [ 10]
Blyth Offshore
United Kingdom
55°08′09″N 01°29′25″W / 55.13583°N 1.49028°W / 55.13583; -1.49028 (Blyth Offshore 4 MW )
4
2 × Vestas V66-2MW
2000
£ 4 million
6-11
1.6
E.ON
[ w 6]
Borssele I–II
Netherlands
51°42′10″N 3°4′34″E / 51.70278°N 3.07611°E / 51.70278; 3.07611 (Borssele I–II (752 MW) )
752
94 × Siemens SWT-8.0-154
2020
Borssele III–IV
Netherlands
51°42′25.2″N 2°54′44.6″E / 51.707000°N 2.912389°E / 51.707000; 2.912389 (Borssele III–IV (731.5 MW) )
731.5
77 × MHI Vestas V164 9.5MW
2021
Borssele V
Netherlands
51°42′33″N 3°00′12″E / 51.7092°N 3.0033°E / 51.7092; 3.0033 (Borssele V (19 MW) )
19
2 × MHI Vestas V164 9.5MW
2021
Butendiek
Germany
55°0′49.0″N 7°46′7.3″E / 55.013611°N 7.768694°E / 55.013611; 7.768694 (Butendiek (288 MW) )
288
80 × Siemens SWT-3.6
2015
35
WPD Nordsee Offshore GmbH
[ w 7]
DanTysk
Germany
55°8′24″N 7°12′0″E / 55.14000°N 7.20000°E / 55.14000; 7.20000 (DanTysk (288 MW) )
288
80 × Siemens SWP-3.6-120
2015
$900 million
21-31
70
Vattenfall Stadtwerke München
[ w 8] [ 11]
Deutsche Bucht
Germany
54°21′N 5°51′E / 54.350°N 5.850°E / 54.350; 5.850 (Deutsche Bucht (260.4 MW) )
260.4
31 × MHI Vestas V164-8.0 MW
2019
Dudgeon
United Kingdom
53°15′00″N 1°23′0″E / 53.25000°N 1.38333°E / 53.25000; 1.38333 (Dudgeon 402 MW )
402
67 × Siemens SWT-6.0-154
2017
£1.5bn
32
Equinor Statkraft
[ w 9]
Egmond aan Zee
Netherlands
52°36′N 4°25′E / 52.600°N 4.417°E / 52.600; 4.417 (Egmond aan Zee (108 MW) )
108
36 × Vestas V90-3MW
2008
€ 200 million
15-18
13
Nuon , Shell
[ w 10] [ 12] [ 13]
Luchterduinen
Netherlands
52°25′N 4°10′E / 52.417°N 4.167°E / 52.417; 4.167 (Luchterduinen 129 MW )
129
43 × Vestas V112/3000
2015
€450 million
18-24
24
Eneco, Mitsubishi
[ w 11] [ 14]
Gemini
Netherlands
54°2′9.6″N 5°57′46.8″E / 54.036000°N 5.963000°E / 54.036000; 5.963000 (Gemini (600 MW) )
600
150 × Siemens SWT-4.0
2017
€2.8 billion
55
Northland Power , Siemens , Van Oord , HVC NV
[ w 12]
Global Tech I
Germany
54°30′0″N 6°21′30″E / 54.50000°N 6.35833°E / 54.50000; 6.35833 (Global Tech I (400 MW) )
400
80 × Multibrid M5000
2015
€1.8 billion
39-41
110
Wetfeet Offshore Windenergy
[ w 13]
Gode Wind 1 & 2
Germany
54°4′0″N 7°2′0″E / 54.06667°N 7.03333°E / 54.06667; 7.03333 (Gode Wind 1 & 2 (582MW) )
582
97 × Siemens SWT-6.0-154
2016
€2.2 billion
30
42
Ørsted
[ 15]
Greater Gabbard
United Kingdom
51°56′0″N 1°53′0″E / 51.93333°N 1.88333°E / 51.93333; 1.88333 (Greater Gabbard 504 MW )
504
140 × Siemens SWT-3.6-107
2012
£ 1,500 million
20-32
23
SSE Renewables
[ w 14]
Gunfleet Sands 1 & 2
United Kingdom
51°43′0″N 01°12′50″E / 51.71667°N 1.21389°E / 51.71667; 1.21389 (Gunfleet Sands 1 & 2 172MW )
172
48 × Siemens SWP-3.6-107
2010
£ 300 million
2-15
7
Ørsted
[ w 15] [ 1] [ 6] [ 16]
Hohe See
Germany
54°26′N 6°19′E / 54.433°N 6.317°E / 54.433; 6.317 (Hohe See (497 MW) )
497
48 × Siemens SWT-7.0-154
2019
Horns Rev I
Denmark
55°31′47″N 7°54′22″E / 55.52972°N 7.90611°E / 55.52972; 7.90611 (Horns Rev I (160 MW) )
160
80 × Vestas V80-2MW
2002
€ 272 million
10-20
18
Vattenfall 60%Ørsted 40%
[ w 16] [ 1] [ 17] [ 2] [ 18] [ 19] [ 20]
Horns Rev II
Denmark
55°35′54″N 7°34′34″E / 55.59833°N 7.57611°E / 55.59833; 7.57611 (Horns Rev II (209 MW) )
209
91 × Siemens SWP-2.3-93
2009
€ 470 million
9-17
32
Ørsted
[ w 17] [ 21] [ 19]
Horns Rev III
Denmark
55°41′49″N 7°40′9″E / 55.69694°N 7.66917°E / 55.69694; 7.66917 (Horns Rev III (406.7 MW) )
406.7
49 x MHIVestas V164 -8.3MW
2019
10-20
30
Vattenfall
[ w 18] [ 22] [ 23] [ 24] [ 25]
Humber Gateway
United Kingdom
53°38′38″N 0°17′35″E / 53.64389°N 0.29306°E / 53.64389; 0.29306 (Humber Gateway 219 MW )
219
73 × Vestas V112-3.0
2015
€900 million
10-18
10
E.ON
[ w 19]
Hywind
Norway
59°08′24″N 05°01′55″E / 59.14000°N 5.03194°E / 59.14000; 5.03194 (Hywind 2.3MW )
2.3
1 × Siemens SWP-2.3-82
2009
NOK 400 million
220
10
Equinor
[ w 20] [ 1] [ 26]
Hywind Scotland
United Kingdom
57°29′N 01°21′W / 57.483°N 1.350°W / 57.483; -1.350 (Hywind Scotland 30MW )
30
5 × Siemens SWP-6.0-154
2017
NOK 2 billion (£152m)
29
Equinor (75%)Masdar (25%)
[ w 21] [ 1] [ 26]
Hywind Tampen
Norway
61°19′47.9″N 2°42′0″E / 61.329972°N 2.70000°E / 61.329972; 2.70000 (Hywind Tampen 88 MW )
88
11 × Siemens SG 8.0-167 DD
2023
NOK 7.5 billion
260-300
140
Equinor
[ 27] [ 28] [ 29]
Kaskasi
Germany
54°29′0″N 7°41′0″E / 54.48333°N 7.68333°E / 54.48333; 7.68333 (Kaskasi (342 MW) )
342
38 × Siemens Gamesa SG 8.0-167DD
2022
Kentish Flats
United Kingdom
51°27′36″N 01°05′24″E / 51.46000°N 1.09000°E / 51.46000; 1.09000 (Kentish Flats 90MW )
90
30 × Vestas V90-3.0MW
2005
£ 121.5 million
3-5
10
Vattenfall
[ w 22] [ 1] [ 6] [ 7] [ 30] p69
Lincs
United Kingdom
53°11′0″N 0°29′0″E / 53.18333°N 0.48333°E / 53.18333; 0.48333 (Lincs 270 MW )
270
75 × Siemens SWT-3.6-120
2013
£ 1,000 million
10-15
8
Centrica , Siemens , Ørsted
[ w 23] [ 6] [ 31] [ 32] [ 33]
London Array
United Kingdom
51°38′38″N 1°33′13″E / 51.64389°N 1.55361°E / 51.64389; 1.55361 (London Array 630 MW )
630
175 × Siemens SWT-3.6
2013
£ 1,800 million
0-25
20
Ørsted , E.ON UK Renewables , Masdar
[ w 24]
Lynn and Inner Dowsing
United Kingdom
53°07′39″N 0°26′10″E / 53.12750°N 0.43611°E / 53.12750; 0.43611 (Lynn and Inner Dowsing 194MW )
194
54 × Siemens SWP-3.6-107
2009
£ 300 million
6-11
5
Centrica 50% TCW 50%
[ w 25] [ 6] [ 34] [ 35] [ 7] p119
Meerwind Süd/Ost
Germany
54°23′N 7°41′E / 54.383°N 7.683°E / 54.383; 7.683 (Meerwind Süd/Ost (288 MW) )
288
80 × Siemens SWT-3.6-120
2014
€1,300 million
22-26
53
WindMW GmbH.
[ w 26] [ 36]
Merkur
Germany
54°2′N 6°33′E / 54.033°N 6.550°E / 54.033; 6.550 (Merkur (396 MW) )
396
66 × GE Haliade 150-6MW
2019
Nobelwind
Belgium
51°31′40″N 3°1′55″E / 51.52778°N 3.03194°E / 51.52778; 3.03194 (Nobelwind (165 MW) )
165
50 × Vestas V112-3.3 MW
2017
Nordergründe
Germany
53°50′6″N 8°10′5″E / 53.83500°N 8.16806°E / 53.83500; 8.16806 (Nordergründe (110.7 MW) )
110.7
18 × Senvion 6.2M126
2017
Nordsee One
Germany
53°58′44.400″N 6°48′50.400″E / 53.97900000°N 6.81400000°E / 53.97900000; 6.81400000 (Nordsee One (332.1 MW) )
332.1
54 × Senvion 6.2M126
2017
Nordsee Ost
Germany
54°26′N 7°41′E / 54.433°N 7.683°E / 54.433; 7.683 (Nordsee Ost (295 MW) )
295
48 × Senvion 6.2M126
2015
25
55
RWE Innogy
[ w 27]
Norther
Belgium
51°31′40″N 3°1′55″E / 51.52778°N 3.03194°E / 51.52778; 3.03194 (Norther (369.6 MW) )
369.6
44 × Vestas V164-8.4 MW
2019
Elicio
[ w 28]
Northwester 2
Belgium
51°41′15″N 2°44′56″E / 51.68750°N 2.74889°E / 51.68750; 2.74889 (Northwester 2 (219 MW) )
219
23 × Vestas V164-9.5 MW
2020
[ w 29]
Northwind
Belgium
51°37′0″N 2°54′0″E / 51.61667°N 2.90000°E / 51.61667; 2.90000 (Northwind (216 MW) )
216
72 × Vestas V90-3.0
2014
€850 million
16-29
37
Parkwind
[ w 30] [ 37]
Princess Amalia
Netherlands
52°35′21.8″N 4°12′22.7″E / 52.589389°N 4.206306°E / 52.589389; 4.206306 (Princess Amalia (120 MW) )
120
60 × Vestas V80-2MW
2008
€ 350 million
19-24
26
Eneco Energie
[ w 31] [ 38] [ 39]
Rentel
Belgium
51°35′27.6″N 2°56′38.4″E / 51.591000°N 2.944000°E / 51.591000; 2.944000 (Rentel (219 MW) )
309
42 × 7.35 MW
2020
[ w 32]
Riffgat
Germany
53°41′24″N 6°28′48″E / 53.69000°N 6.48000°E / 53.69000; 6.48000 (Riffgat (113 MW) )
113
30 × Siemens SWT-3.6-120
2014
€ 480 million
16-24
15-42
ENOVA, EWE
[ w 33] [ 40] [ 41]
Sandbank
Germany
55°11′N 6°51′E / 55.183°N 6.850°E / 55.183; 6.850 (Sandbank (288 MW) )
288
72 × Siemens SWT-4.0-130
2017
€1.2 billion
24-34
90
Vattenfall
[ w 34]
Scroby Sands
United Kingdom
52°38′0″N 1°47′0″E / 52.63333°N 1.78333°E / 52.63333; 1.78333 (Scroby Sands 60MW )
60
30 × Vestas V80-2MW
2004
£ 75.5m
0-8
2.5
E.ON
[ w 35] [ 1] [ 42] [ 6] [ 43] [ 7] p53
Mermaid
Belgium
51°43′12″N 2°44′9″E / 51.72000°N 2.73583°E / 51.72000; 2.73583 (Mermaid (235.2 MW) )
235.2
28 × Siemens SWP-8.4 MW
2020
Seastar
Belgium
51°38′0″N 2°51′36″E / 51.63333°N 2.86000°E / 51.63333; 2.86000 (Seastar (168 MW) )
168
20 × Siemens SWP-8.4 MW
2020
[ w 36] [ 44]
Sheringham Shoal
United Kingdom
53°07′0″N 1°08′0″E / 53.11667°N 1.13333°E / 53.11667; 1.13333 (Sheringham Shoal 317 MW )
317
88 × Siemens SWT-3.6-107
2012
£ 1,100 million
12-24
17
Equinor 50%Statkraft 50%
[ w 37]
Teesside
United Kingdom
54°38′50″N 1°05′40″W / 54.64722°N 1.09444°W / 54.64722; -1.09444 (Teesside 62 MW )
62
27 × Siemens SWT-2.3
2013
£ 200 million
7-15
1.5
EDF-EN
Thanet
United Kingdom
51°26′0″N 1°38′0″E / 51.43333°N 1.63333°E / 51.43333; 1.63333 (Thanet 300 MW )
300
100 × Vestas V90-3.0MW
2010
£ 780-900 million
20-25
11
Vattenfall
[ w 38] [ 45] [ 6] [ 46] [ 47]
Thorntonbank
Belgium
51°33′6″N 2°58′1″E / 51.55167°N 2.96694°E / 51.55167; 2.96694 (Thorntonbank (325.2 MW) )
325.2
6 × REpower 5M, 48 × Senvion 6M
2013
€ 1,100 million
13-19
27
C-Power
[ w 39] [ 1] [ 48]
Trianel Windpark Borkum (phase 1)
Germany
54°2′30″N 6°28′0″E / 54.04167°N 6.46667°E / 54.04167; 6.46667 (Trianel Windpark Borkum (phase 1) 200 MW )
200
40 × Areva M5000-116
2015
€900 million
28-33
45
Trianel
[ w 40]
Veja Mate
Germany
54°40′N 6°10′E / 54.667°N 6.167°E / 54.667; 6.167 (Veja Mate (402 MW) )
402
67 × Siemens SWT-6.0-154
2017
€1.9 billion
41
95
Highland Group Holdings Ltd, Siemens Financial Services, Copenhagen Infrastructure Partners
[ 49]
Westermost Rough
United Kingdom
53°48′18″N 0°08′56″E / 53.80500°N 0.14889°E / 53.80500; 0.14889 (Westermost Rough 210 MW )
210
35 × Siemens SWT-6.0
2015
€1,000 million
10-25
8
Ørsted
[ w 41]
"Cap. " is the rated nameplate capacity of the wind farm
"Commissioned " is the year when the windfarm was or will be commissioned and put into service.
"Cost " is the total capital cost of the project up to commissioning .
"km to shore " is the average distance of the windfarm to shore, or (where available) the distance from the in-farm transformer/substation to the shore
"Depth range (m) " is the range of minimum to maximum depths of water that the windfarm is sited in
"Refs " cite the source references for the information. The [w ...] footnotes link to each windfarm's own home page